Loading...
HomeMy WebLinkAbout5.b. Proposed Player Development Area - ArenaCITY OF ROSEMOUNT EXECUTIVE SUMMARY FOR ACTION CITY COUNCIL MEETING DATE: June 3, 2003 AGENDA ITEM: Proposed Player Development Area — Arena AGENDA SECTION: Department Head Report PREPARED BY: Dan Schultz, Director of Parks and Recreation AGEND 0 5 0 ATTACHMENTS: Location photo, upper and lower level floor plans. APPROVED BY: Representatives from Rosemount Area Hockey Association (RAHA) have brought forth a concept plan for improvements to the Rosemount Ice Arena. The proposed improvements would include a player development area with a shooting range /exercise area and a meeting room above it. The improvements are proposed to be built in the southwest corner of the arena, in an area is currently being used for storage. RAHA would pay for the improvements and they would become a permanent part of the arena. The Parks and Recreation Commission reviewed the concept plan in April of 2003 and recommended the Council support the improvements. Staff is in support of the concept with the following conditions: • RAHA would make a monetary donation to the City to cover the full cost of the improvements and the City would coordinate the project. • RAHA and the City have a facility use agreement. • RAHA would be responsible for providing all plans and specifications necessary to meet current building codes and satisfy the City's Building Official With the support of Council, staff will bring back a request to receive a donation from RAHA and also possibly bring price quotes depending on the cost estimates for the project. RECOMMENDED ACTION: None, discussion only. COUNCIL ACTION: V A 2x4 framing with 3/4" plywood on exterior and sheetrock on interior. RAHA CONFERENCI .UPPER LEVE Existing block walls ---- - - - - -- H IIA Goalie / Safety Nets ALYIlMETRIC AREA 2x4 framing with 3/4" Plywood both sides PLAYER DEVELOPMENT ROOM /CE LEVEL r -------------------- = ---- - - - - -� i t � t � A i i i SHOOTING RANGE i i i i ,b