HomeMy WebLinkAbout6.j. Change Order #1 Bloomfield 5th Addition, City Project #364i
WO113V 113NUOD
'SHUfUVNrJIS AWVSSEIOUN 2HL HZRIOHIfIV (INV t ZDgfOWd AUD `NOI RICIV
H1 (IIaIJW00'Ig 01 1# W21C O HJNVHD 2[AO - dddV 01 HOLLOW :NOLLDV Ga(INaPJWO3aH
86'ZSb`6S�$ o Tunouzu Out ui I# JOpzp 02uuUP runozddu tiounoD Ouilsanbai srlPITS
xojuaD `.xadotanap
am Xq papunl ostu si goigm `uo!llppV TS pjoUuzootg zoI jm4wo Oul sixa Oil ol pazapio o2mgo aq azola.TQgl
puu paimbai jou si loofozd am.Io Buippiq ottgnd jnujjjlnS f4iO pasinpu suu Riau.IOUV XjjD all `xajuoD `aadotanap
aqi Xq Xtaulua popunl oq 11yA loofoid uojjjppV .9 piaguzootg aqj sV - looloid uoil!ppV y ,S pjoUuzootg
Oqj aoj paquoo 5utjszx3 ataq. OT Toafoad uoiIippV ,.g ptaguzootg am uTTm poluloossu xzom aqT npzo oSuugo of
133fo -Id auk i0I •ouI `Oupa uoO uuX-a Xq papinoid uaaq anuu saoud 1jun `loofozd uo!T!ppV 9 ploUmooig all io3
QaA02IddV
I# JOP-10 afu'uuO :S.LNgWHDV.L.LV
• :Olt VQAI2[9V
zaautoug XTtD "a'd `aatzlozg • f MaipuV :Ag aauvdaud
JuasuoO
t9£# loa foid
WOI13as WiNaDV
fqiD `uo!l!ppV o , pia uzooig `i #.zap o asuuuO :NaLI V([Naf)V
£OOZ `6I IsanV :HIVQ JMIHE M /IDNaOD AID
NOI 3V HOd AdVIVWfIS 3AI.Lfl3aXH
INflowaS02i 30 AID
,/
BLOOMFIELD 5TH ADDITION August 14, 2003
CITY OF ROSEMOUNT
CITY PROJECT NO. 364 WSB PROJECT NO. 2012 -50
OWNER: CONTRACTOR:
City of Rosemount Ryan Contracting Co.
2875 145th Street West 8700 -13th Avenue East
Rosemount, MN 55068 Shakopee, MN 55379
YOU ARE DIRECTED TO MAKE THE FOLLOWING CHANGES IN THE CONTRACT DOCUMENT DESCRIPTION:
CONTRACT QUANTITIES ARE MODIFIED AS SHOWN ON THE ATTACHED DETAIL.
IT IS UNDERSTOOD THAT THIS CHANGE ORDER INCLUDES ALL ADDITIONAL COSTS AND TIME EXTENSIONS WHICH ARE IN ANY WAY, SHAPE,
OR FORM ASSOCIATED WITH THE WORK ELEMENTS DESCRIBED ABOVE.
CHANGE IN CONTRACT PRICE: ` CHANGE IN CONTRACT TIME:
ORIGINAL CONTRACT PRICE: $869,564.30 ORIGINAL CONTRACT TIME: 7/15/2003
PREVIOUS CHANGE ORDERS: N/A $0.00 NET CHANGE FROM PREVIOUS CHANGE ORDERS: N/A
CONTRACT PRICE PRIOR TO THIS CHANGE ORDER: $869,564.30 CONTRACT TIME PRIOR TO THIS CHANGE ORDER: 7115/2003
NET INCREASE OF THIS CHANGE ORDER: $459,452.98 NET INCREASE OF CHANGE ORDER: 46 Days
CONTRACT PRICE WITH ALL APPROVED CHANGE ORDERS: $1,329,017.28 CONTRACT TIME WITH APPROVED CHANGE ORDERS 11/1/2003
RECOMMENDED BY: APPROVED BY:
Mark A. Erichson,, P.E.
WSB & ASSOCIATES, INC. RYAN CONTRACTING CO.
ENGINEER CONTRACTOR
APPROVED BY:
CITY ENGINEER CITY ADMINISTRATOR
DATE OF COUNCIL ACTION