HomeMy WebLinkAbout9.e. Shafer Contracting ExceptionFROM: Rick Pearson, City Planner DATE: August 19, 2003 RE: MnDOT Request MnDOT has requested that the Council allow Shafer Contracting an exception to their Mineral Extraction restrictions that would give them the option to operate / haul on a 24 hour basis for two weekends. The weekends affected would be August 22, 23 & 24 and on September 5, 6 & 7. Heavy traffic delays resulting from the intersection work at 117 Street in Inver Grove Heights should be relieved if Shafer takes advantage of this option. RECOMMENDATION Motion to grant Shafer Contracting Co. an exception to the operating hours restrictions in their Mineral Extraction Permit Conditions allowing hauling for a 24 hour basis on August 22, 23 & 24 and on September 5, 6 & 7 only. V Pearson,Rick From: Lisa Freese [Lisa. Freese @dot. state. mn.us] Sent: Tuesday, August 19, 2003 7:38 AM To: gjohnson @ci.inver - grove - heights.mn.us; Pearson,Rick Cc: mark. krebsbach @co.dakota.mn.us; Christine Beckwith; Judy Melander; Kevin Walker; Khani Sahebjam; Nancy Daubenberger; Terry Zoller Subject: Request to Allow Contractors To Operate With Extended Hours Lisa Freesemcf Mn /DOT is having extreme traffic delays because of temporary lane paving on the TH52 -117th street interchange project. The mix of heavy truck traffic combined with the signal delays are resulting in traffic backups on a daily basis to well beyond County Rd 42. We have changed the signal timing, taken a number of measures with the contractor to adjust the traffic flow and it still has not alleviated the problem. Because of the traffic backups we are experiencing significant traffic diversions on to local /county roads and a high number of complaints from the commuters going through this construction zone. This part of the construction is about two weeks from completion. In order to address the traffic delays, Mn /DOT has asked the contractor to complete the work on a 24 hour basis on two weekends rather that during the week. It is our understanding that two of the subcontractors have conditional use restrictions limiting hours of operation- -the Bituminous Roadways plant in Inver Grove Heights and Shafer gravel operation in Rosemount. On the weekends of August 22,23, & 24 and on September 5, 6 & 7, the contractor and its subs are going to work around the clock to complete this stage of the project. We are requesting that each City take whatever measures necessary, under the requirements of these subcontractors local use permits, to allow them to operate these requested dates on a 24 hour basis. Then at that point this temporary lane paving operation will be complete and the road will be open to 2 lanes of traffic in each direction. The contractors have both asked us to obtain written permission from each City to allow these operating hours. We ask that you consider this temporary waiver. It will hopefully allow us to complete this portion of the project in a safe manner and with a lot less disruption to traffic. If you have any questions you may contact me on my cell phone at 651- 271 -1891 or you may contact Christine Beckwith who is our Mn /DOT Construction Engineer assigned to the project at 651 -779 -5014. Thank you for your assistance and cooperation on this project. Lisa Freese, AICP Area Manager- Carver, Scott & Dakota Counties Mn /DOT Metro District 1500 W. County Road B -2 Roseville, MN 55113 Office: 651- 582 -1409 - Fax: 651- 582 -1020 e -mail: lisa.freese @dot.state.mn.us 1