HomeMy WebLinkAbout6.h. Change Order #1 - Evermoor Roundstone, City Project #361r CITY OF ROSEMOUNT EXECUTIVE SUMMARY FOR ACTION CITY COUNCIL MEETING DATE: September 2, 2003 AGENDA ITEM: Change Order #1 — Evermoor Roundstone, City Project #361 AGENDA SECTION: Consent PREPARED BY: Andrew J. Brotzler, P.E., City Engineer w l** * ' AGEN I #6 ATTACHMENTS: Change Order #1 APPROVED BY: Change Order #1, Evermoor Roundstone, includes the addition of an item to be completed by the contractor as requested by the developer. The developer will pay all additional costs. Staff requests Council approval of this item. RECOMMENDED ACTION: MOTION TO APPROVE CHANGE ORDER #1 FOR EVERMOOR ROUNDSTONE, CITY PROJECT #361 AND AUTHORIZE NECESSARY SIGNATURES. COUNCIL ACTION: t , 20' d _id101 WSB & Associates, Inc. August 28, 2003 Honorable Mayor and City Council City of Rosemount 2875 145 Street West Rosemount, MN 55068 Re: Change Order No. 1 — Evermoor Roundstone City Project No. 361 WSB Project No. 1476 -00 Honorable Mayor and City Council: As part of the Evermoor Roundstone Addition, enough select granular borrow for roadway construction was intended to be provided from on -site material left over from the grading process. As it turns out, there was not enough left over from the grading process, so the developer (D.R. Horton) is requesting the additional material needed be added to the contract as Change Order No. 1. The costs associated with this Change Order can be found in Change Order No. 1 and will be paid for by D.R. Horton. WSB & Associates, Inc. recommend the approval of this Change Order. Please contact me at 763 - 287 -7163 if you have any questions. Sincerely, WSB. & Associates, Inc. Mark A. Erichson, P.E. Project Manager cc: Andrew J. Brotzler, City Engineer 1: I WPWIM 1476 -001081803- hmcc.doc Minneapolis - St. Cloud • Equal Opportunity Employer Sq I H T : ;qH 'R Rqm FR ! r T mnp— pp—nnH f EVERMOOR'S ROUNDSTONE ADDITION August 14, 2003 CITY OF ROSEMOUNT CITY PROJECT NO. 361 WSB PROJECT NO. 1476 -00 OWNER: CONTRACTOR: City of Rosemount S. J. Louis Construction, Inc. 2875 145th Street West P.O. Box 1373 Rosemount, MN 55068 St. Cloud, MN 56302 YOU ARE DIRECTED TO MAKE THE FOLLOWING CHANGES IN THE CONTRACT DOCUMENT DESCRIPTION: CONTRACT QUANTITIES ARE MODIFIED AS SHOWN ON THE ATTACHED DETAIL. IT IS UNDERSTOOD THAT THIS CHANGE ORDER INCLUDES ALL ADDITIONAL COSTS AND TIME EXTENSIONS WHICH ARE IN ANY WAY, SHAPE, OR FORM ASSOCIATED WITH THE WORK ELEMENTS DESCRIBED ABOVE. CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIME: ORIGINAL CONTRACT PRICE: PREVIOUS CHANGE ORDERS: N/A CONTRACT PRICE PRIOR TO THIS CHANGE ORDER: NET INCREASE OF THIS CHANGE ORDER: CONTRACT PRICE WITH ALL APPROVED CHANGE ORDERS: $641,938.26 ORIGINAL CONTRACT TIME: 7/1/2003 $0.00 NET CHANGE FROM PREVIOUS CHANGE ORDERS: N/A $641,938.26 CONTRACT TIME PRIOR TO THIS CHANGE ORDER: 7/1/2003 $30,846.50 NET INCREASE OF CHANGE ORDER: N/A $672,784.76 CONTRACT TIME WITH APPROVED CHANGE ORDERS 7/1/2003 RECOMMENDED BY: i� O �li - .Cn Mark A. Erichson, P.E. APPROVED BY: WSB & ASSOCIATES, INC. S. J. LOUIS CONSTRUCTION, INC. ENGINEER CONTRACTOR APPROVED BY: CITY ENGINEER CITY ADMINISTRATOR DATE OF COUNCIL ACTION FIWPW1M1476- 001ExceAC0-1 CO -1 r EVERMOOR'S ROUNDSTONE ADDITION CITY OF ROSEMOUNT CITY PROJECT NO. 361 ADDITION QUANTITIES Extended Item No. Description Qty Unit Price Amount 69 NEW F & I SELECT GRANULAR BORROW TON 3247 $9.50 $30,846.50 TOTAL ADDITIONAL QUANTITIES $30,846.50 TOTAL INCREASE CHANGE ORDER NO. 1 $30,846.50 F:IWPW1M1476- 001Exce11C0 -1C01 Detail