Loading...
HomeMy WebLinkAbout6.g. Change Order #1 - Bloomfield Vineyards, City Project #368CITY OF ROSEMOUNT EXECUTIVE SUMMARY FOR ACTION CITY COUNCIL MEETING DATE September 2, 2003 AGENDA ITEM: Change Order #1- Bloomfield Vineyards, City Project #368 AGENDA SECTION: Consent PREPARED BY: Andrew J. Brotzler, P.E., City Engineer AGEN AL 6 ATTACHMENTS: Change Order #1 APPROVED BY: A'­-, Change Order #1; Bloomfield Vineyards, includes the addition and subtraction of items to be completed by the contractor as requested by the developer. The developer will pay all additional costs. Staff requests Council approval of this item. , WSB & Associates, Inc. August 28, 2003 Honorable Mayor and City Council City of Rosemount 2875 145` Street West Rosemount, MN 55068 Re: Bloomfield Vineyards — Change Order No. 1 City Project No. 368 WSB Project No. 2012 -70 Dear Honorable Mayor and City Council: The developer of the above - referenced project, Centex Homes, has requested a change to what was originally intended for water service to each unit. Specifically, they are requesting to increase the water service size from 1 -inch to 1.5 -inch, so they can add fire protection within the buildings. The developer also is requesting that we add 4 -inch drain tile for future connection to buildings and an irrigation service. This information was not available during WSB's design process. The costs associated with these changes can be found in Change Order No. 1. These costs will be paid for by Centex Homes. WSB & Associates, Inc. recommends the approval of this Change Order. Please contact me at 763- 287 -7163 if you have any questions. Sincerely, WSB & Associates, Inca �-r, �. ez;'� Mark A. Erichson, P.E. cc: Andrew J. Brotzler, City Engineer F: IWPWIM2012- 701082803- hmee.doc (�1�1 TZbS�'91, Minneapolis • St. Cloud • Equal Opportunity Employer SS1H I DOSSH 1 2 SSm F,n : A i S FPP- 9 ? —nnH r BLOOMFIELD VINEYARDS (7TH ADDITION) AUGUST 19, 2003 STREET AND UTILITY CONSTRUCTION AND APPURTENANT WORK CITY OF ROSEMOUNT PROJECT NO. 368 WSB PROJECT NO. 2012 -70 OWNER: CITY OF ROSEMOUNT 2875 - 145TH STREET WEST ROSEMOUNT, MN 55068 CONTRACTOR: ERICKSON CONSTRUCTION, INC. 13616 PLEASANT LANE BURNSVILLE, MN 55337 YOU ARE DIRECTED TO MAKE THE FOLLOWING CHANGES IN THE CONTRACT DOCUMENT DESCRIPTION: CONTRACT QUANTITIES ARE MODIFIED AS SHOWN ON THE ATTACHED DETAIL. IT IS UNDERSTOOD THAT THIS CHANGE ORDER INCLUDES ALL ADDITIONAL COSTS AND TIME EXTENSIONS WHICH ARE IN ANY WAY, SHAPE, OR FORM ASSOCIATED WITH THE WORK ELEMENTS DESCRIBED ABOVE. CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIME: ORIGINAL CONTRACT PRICE: $477,102.21 ORIGINAL CONTRACT TIME (SUBSTANTIAL): 10/31/2003 PREVIOUS CHANGE ORDERS: N/A $0.00 NET CHANGE FROM PREVIOUS CHANGE ORDERS: NONE CONTRACT PRICE PRIOR TO THIS CHANGE ORDER: $477,102.21 CONTRACT TIME PRIOR TO THIS CHANGE ORDER: 10/3112003 NET INCREASE OF THIS CHANGE ORDER: $37,518.58 NET INCREASE OF CHANGE ORDER: NONE CONTRACT PRICE WITH ALL APPROVED CHANGE ORDERS: $514,620.79 CONTRACT TIME WITH APPROVED CHANGE ORDERS: 10/31/2003 RECOMMENDED BY: APPROVED BY: b Mark A. Erichson, P.E., Project Manager WSB & ASSOCIATES, INC. ERICKSON CONSTRUCTION, INC. ENGINEER CONTRACTOR APPROVED BY: CITY ENGINEER CITY ADMINISTRATOR DATE OF COUNCIL ACTION Pana 1 1 BLOOMFIELD VINEYARDS (7TH ADDITION) August 19, 2003 STREET AND UTILITY CONSTRUCTION AND APPURTENANT WORK CITY OF ROSEMOUNT PROJECT NO. 368 WSB PROJECT NO. 2012 -70 DELETED ITEMS Item No. Description Qty Unit Price Extended Amount Extended Amount 71 1" CORPORATION STOP -54 EACH $50.00 - $2,700.00 72 1" CURB STOP & BOX -54 EACH $110.00 - $5,940.00 73 1 "TYPE K COPPER PIPE -1860 LIN FT $6.75 - $12,555.00 TOTAL DECREASE CHANGE ORDER NO. 1 1860 LIN FT $11.40 - $21,195.00 ADDED ITEMS Item No. Description Qty Unit Price Extended Amount 74 1.5" CORPORATION STOP 54 EACH $281.72 $15,212.88 75 1.5" CURB STOP & BOX 54 EACH $263.30 $14,218.20 76 1.5" TYPE K COPPER PIPE 1860 LIN FT $11.40 $21,204.00 77 4" DIP DRAIN TILE 390 LIN FT $18.15 $7,078.50 78 RAILROAD CROSSING PERMIT 1 LUMP SUM $1,000.00 $1,000.00 TOTAL INCREASE CHANGE ORDER NO. 1 $58,713.58 ADJUSTMENT TO ORIGINAL CONTRACT AMOUNT $37,518.58 Page 1 F:\WPWIN\2012-70\Excel\CO 1 CO1 Detail