Loading...
HomeMy WebLinkAbout6.e. Receive Bids/Award Contract - Portable Generator/Receptacle Project, City Project #366CITY OF ROSEMOUNT EXECUTIVE SUMMARY FOR ACTION CITY COUNCIL MEETING DATE: March 20, 2003 AGENDA ITEM: Receive Bids /Award Contract — Portable Generator/Receptacle Project, City Project #366 AGENDA SECTION: Consent PREPARED BY: Andrew J. Brotzler, P.E., City Engineer AGED : # 6 E, 1 12 ATTACHMENTS: None APPROVED BY On Friday, March 14, 2003, bids for the referenced project will be received and read aloud publicly. This project includes the replacement of one of the City's existing portable standby generators and rehabilitation of the City's second portable standby generator. The project also includes the replacement of existing electrical receptacles at the City's wells, sanitary sewer lift stations and storm sewer lift stations in order to standardize the system and to bring the system up to code. Funding for this project will include a combination of utility -funds and budget line items for the generator.- - The tabulation of bidders, resolution and letter of recommendation to award will be provided at the Council meeting. RECOMMENDED ACTION: MOTION TO ADOPT A RESOLUTION RECEIVING BIDS AND AWARDING CONTRACT FOR THE PORTABLE GENERATOR/RECEPTACLE PROJECT, CITY PROJECT #366. COUNCIL ACTION: Kaeding & Associates, Inc. 7300 France Avenue South Suite 330 Minneapolis, Minnesota 55435 -4545 Phone ( 952) 831 -0317 E -Mail: info @kaeding.com Fax: (952) 831 -2179 March 17, 2003 City of Rosemount Attn: Mr. Andrew Brotzler, City Engineer 2875 West 145t" Street Rosemount, Minnesota 55068 Re: City of Rosemount Standby Generation Dear Mr. Brotzler: On Friday, March 14, bids for the portable standby generator for the City were received. This project also included modifications to the existing generator's electrical connections and provisions for connecting the generators at the lift stations. Three bids were received. They included: Systems by Design; Centerville MN $ 92,440 Electrical Installation & Maintenance; Maple Plain MN $ 123,400 Seaforth Electric; Pine Island MN $ 138,800 We have been involved with projects in Anoka and Waseca, Minnesota, where Systems by Design has been the electrical contractor. Those projects were completed. Systems by Design was contacted on March 14, and they indicated that their bid was based on a portable generator furnished by Ziegler Power Systems, Inc., and the modifications to the existing portable machine will also be completed by Ziegler Power Systems, Inc., the original supplier of the generator. Based on the previous project experience and their intent on using products by Ziegler, the recommendation offered is to award the project to Systems by Design, Inc. If ve questions, please feel free to contact me. Thank you. incerely, ul Kaeding eding & Associates, Inc. BID TABULATION ROSEMOUNT, MINNESOTA LIFT STATION REVISIONS & PORTABLE GENERATION BIDS RECEIVED: 10:00 AM MARCH 14, 2003 BIDDER BID AMOUNT BID SECURITY REMARKS Systems by Design 307 Cimmaron Road Apple Valley, MN 55124 $ 92,440.00 Yes Addendum #1 Electrical Installation & Maintenance 1480 County Road 90 Maple Plain MN 55359 $ 123,400.00 Yes Addendum #1 Seaforth Electric, Inc. 290 Third Street NE Pine Island MN 55963 -7631 $ 138,800.00 Yes Addendum #1 CITY OF ROSEMOUNT DAKOTA COUNTY, MINNESOTA RESOLUTION 2003 — A RESOLUTION RECEIVING BIDS AND AWARDING CONTRACT FOR PORTABLE GENERATOR/RECEPTACLE PROJECT CITY PROJECT NO. 366 BE IT FURTHER RESOLVED, by the City Council of the City of Rosemount, Minnesota, as follows: All bids on construction of the Portable Generator /Receptacle Project are hereby received and tabulated. 2. The bid of Systems by Design in the amount of $92,440 for the construction of said improvements are in accordance with the plans and specifications and advertisement for bids is the lowest responsible bid and shall be and hereby is accepted. The Mayor and Clerk are hereby authorized and directed to enter into a contract with said bidder for the construction of said improvements for and on behalf of the City of Rosemount. 4. The City Clerk is hereby authorized and directed to return forthwith to all bidders the deposits made with their bids, except that the deposit of all successful bidder and the next two lowest bidders shall be retained until a contract has been executed. 5. Award of the bid is contingent on the determination by the City Administrator that all necessary rights -of -entry or easements by deed or dedication have been secured for construction of the improvements. ADOPTED this 20 day of March, 2003. William H. Droste, Mayor ATTEST: Linda Jentink, City Clerk Motion by: Seconded by: Voted in favor: Voted against: