Loading...
HomeMy WebLinkAbout11.a. Receive Bids/Award Contract - Connemara Trail Phase 2 Street & Utility Improvements, City Project #343CITY OF ROSEMOUNT EXECUTIVE SUMMARY FOR ACTION CITY COUNCIL MEETING DATE: May 20, 2003 AGENDA ITEM: Receive Bids /Award Contract — Connemara Trail Phase 2 Street and Utility Improvements, City Project #343 AGENDA SECTION: New Business PREPARED BY: Andrew J. Brotzler, P.E., City Engineer AGEN 1 A ATTACHMENTS: Map APPROVED BY: !� On Friday, May 16, 2003, bids for the referenced project will be received and read aloud publicly. This project includes the construction of Connemara Trail from Trunk Highway 3, east to Biscayne Pointe 4 Addition, and the reconstructing of Biscayne Avenue from Biscayne Pointe 2 °a Addition, north to Connemara Trail. The project costs will be funded with Municipal State Aid funds, City Core funds, Street CIP funds and special assessments. The tabulation of bidders, resolution and letter of recommendation to award will be provided at the Council meeting. RECOMMENDED ACTION: MOTION TO ADOPT A RESOLUTION RECEIVING BIDS AND AWARDING CONTRACT FOR THE CONNEMARA TRAIL PHASE 2 STREET AND UTILITY IMPROVEMENTS, CITY PROJECT #343. COUNCIL ACTION: 2 x 0 1000 2000 CONNEMARA TRAIL wss Prooct No. 01400.01 Date: April 2, 2002 - 4150 Olson Me Suite Highway STREET IMPROVEMENTS City Plrojed Na.343 WSB Minneapolis, MN 55412 Figure Number 763541-4800 LOCATION MAP fl Associates, Inc, FAX 763541 -1700 Ro Minnesota WS B & Associates, Inc. 'fi 415b`' 1grF Me m r'raixlq.ighway Suite 300! May 20, 2003 Honorable Mayor and City Council City of Rosemount 2875 — 145 Street West Rosemount, MN 55068 -4997 Re: Connemara Trail Phase 2 Street and Utility Construction and Appurtenant Work City of Rosemount Project Nos. 343 -A and 343 -C WSB Project No. 1400 -01 Dear Mayor and Council Members: Bids were received for the above - referenced project on Friday, May 16, 2003, and were opened and read aloud. A total of four bids were received. The bids were checked for mathematical accuracy and tabulated. Please find enclosed the bid tabulation indicating the low bidder as Ryan Contracting Co., Shakopee, Minnesota in the amount of $2,427,719.39. We recommend that the City Council consider these bids and award a contract to Ryan Contracting Co. based on the results of the bids received. Sincerely, WSB & Associates, Inc. Mark A. Erichson, P.E. Project Manager Enclosure cc: Ryan Contracting Co. sb F: \WPWIMI400.0tbtrmmdtn Itcdoc Minneapolis • St. Cloud - Equal Opportunity Employer S31U 130SSU '8 HSM 20 : b Z 2002 —W —MW 0 PROJECT: Connemara Trail Phase 2 Street and Utility Construction and Appurtenant Work City of Rosemount Project Nos. 343 -A and 343 -C LOCATION: Rosemount, MN WSB PROJECT NO(S).: 1400 -01 Bids Opened: Friday, May 16, 2003, 10:00 a.m. Contractor Addendums Rec'd. Bid Security Total Bid 1 Ryan Contracting Co. N/A X $2,427,719.39 ** 2 Three Rivers Construction N/A X $2,515,901.95 3 Arcon Construction Co., Inc. N/A X $2,634,990.23 4 Northdale Construction Co., Inc. N/A X $2,954,529.54 Engineer's Opinion of Cost $2,930,153.40 I hereby certify that this is a true and correct tabulation of the bids as received on May 16, 2003. Mark A. Erichson, P.E., Project Manager ** Denotes corrected figure FAWPWIN11400 -011Exce/11400 -01 Bid Tabulation 20'd BOLTTbS292, S31HIDOSSH 2 HSM 20:bT 20e7- 07 -I,HW I CITY OF ROSEMOUNT DAKOTA COUNTY, MINNESOTA RESOLUTION 2003 — A RESOLUTION RECEIVING BIDS AND AWARDING CONTRACT FOR THE CONNEMARA TRAIL PHASE 2 STREET AND UTILITY IMPROVEMENTS CITY PROJECT NO. 343 BE IT FURTHER RESOLVED, by the City Council of the City of Rosemount, Minnesota, as follows: All bids on construction of the Connemara Trail Phase 2 Street and Utility Improvements have been received and tabulated. 2. The bid of Ryan Contracting Company in the amount of $2,427,719.39 for the construction of said improvements is in accordance with the plans and specifications and advertisement for bids and is the lowest responsible bid and shall be and hereby is accepted. 3. The Mayor and Clerk are hereby authorized and directed to enter into a contract with said bidder for the construction of said improvements for and on behalf of the City of Rosemount. 4. The City Clerk is hereby authorized and directed to return forthwith to all bidders the deposits made with their bids, except that the deposit of all successful bidder and the next two lowest bidders shall be retained until a contract has been executed. 5. Award of the bid is contingent on the determination by the City Administrator that all necessary rights -of -entry or easements by deed or dedication have been secured for construction of the improvements. ADOPTED this 20 day of May, 2003. William H. Droste, Mayor ATTEST: Linda Jentink, City Clerk Motion by: Voted in favor: Seconded by: Voted against: