CITY OF ROSEMOUNT
EXECUTIVE SUMMARY FOR ACTION
CITY COUNCIL MEETING DATE: May 20, 2003
AGENDA ITEM: Connemara Trail Phase 2 Street and Utility
Improvements, City Project #343
AGENDA SECTION:
Public Hearing
PREPARED BY: Andrew J. Brotzler, P.E., City Engineer
AGENt
ATTACHMENTS: Resolution
APPROVED BY: i
At the May 6, 2003 City Council meeting, Council set a public hearing for the above - referenced project.
This project includes the extension of Connemara Trail from Trunk Highway 3, east to the Biscayne Pointe 4th
Addition development. The project_also includes the reconstruction of Biscayne Avenue from Biscayne Pointe
2nd Addition, north to Connemara Trail. If required, Staff will be prepared to provide a brief overview of the
project.
RECOMMENDED ACTION: MOTION TO ADOPT A RESOLUTION ORDERING THE PROJECT
FOR CONNEMARA TRAIL PHASE 2 STREET AND UTILITY IMPROVEMENTS, CITY PROJECT
#343.
COUNCIL ACTION:
E
CITY OF ROSEMOUNT
DAKOTA COUNTY, MINNESOTA
RESOLUTION 2003 —
A RESOLUTION ORDERING THE PROJECT FOR
CONNEMARA TRAIL PHASE 2 STREET AND UTILITY IMPROVEMENTS
CITY PROJECT #343
WHEREAS, the City Council of the City of Rosemount ordered a feasibility report for
Connemara Trail Phase 2 Street and Utility Improvements, City Project #343: and
WHEREAS, the City Council of the City of Rosemount received the feasibility report on April
2, 2002 and ordered a Public Hearing; and
WHEREAS, the City Council of the City of Rosemount has held a Public Hearing on the
Connemara Trail Phase 2 Street and Utility Improvements, City Project #343 on May 7, 2002
and a portion of the project designated as City Project #34313 was approved.
WHEREAS, the City Council of the City of Rosemount set a new Public Hearing on May 6,
2003 for the remainder of the project.
WHEREAS, the City Council of the City of Rosemount has'held a Public Hearing on the
remainder of the above - mentioned project, City Project #343.
NOW THEREFORE BE IT RESOLVED, that the City Council of the City of Rosemount
hereby orders the improvements of the Connemara Trail Phase 2 Street and Utility
Improvements, City Project #343.
ADOPTED this 20'' day of May, 2003.
William H. Droste, Mayor
ATTEST:
Linda Jentink, City Clerk
Motion by:
Seconded by:
Voted in favor:
Voted against:
CONNEMARA TRAIL PHASE 2 STREET
AND UTILITY IMPROVEMENTS
CITY PROJECT #343
PUBLIC HEARING
May 20, 2003
PROJECT BACKGROUND
• FEASIBILITY REPORT COMPLETED - APRIL, 2002
• PUBLIC HEARING - MAY, 2002
• PROJECT PROPOSED TO BE COMPLETED IN PHASES
BROCKWAY DRAW TRUNK SANITARY SEWER AND
TRUNK STORM SEWER
-� BISCAYNE AVENUE STREET & UTILITY
IMPROVEMENTS
--� CONNEMARA TRAIL PHASE 2 STREET & UTILITY
IMPROVEMENTS
--> KEEGAN LAKE OUTLET
• PUBLIC HEARING - MAY 20, 2003
--> REQUIRED TO CONFORM WITH STATE STATUTE.
REQUIREMENTS FOR 429 IMPROVEMENT PROJECT
1
PROPOSED IMPROVEMENTS
• BISCAYNE AVENUE
_> CONSTRUCT FROM BISCAYNE POINTE 3
ADDITION TO CONNEMARA TRAIL
52' -WIDE WITH CONCRETE CURB AND GUTTER
PROPOSED TRAIL AND SIDEWALK
-� SANITARY SEWER, WATERMAIN AND STORM
SEWER
• CONNEMARA TRAIL
_> CONSTRUCT FROM TRUNK HIGHWAY 3 TO
BISCAYNE POINTE 4 ADDITION
--� 52' -WIDE WITH CONCRETE CURB AND GUTTER
--� PROPOSED TRAIL AND SIDEWALK
AT -GRADE RAILROAD CROSSING
3
BRAZIL AVENUE CUL -DE -SAC
SANITARY SEWER, WATERMAIN AND STORM
SEWER
-� STORMWATER POND (POND KL -1687) AT
CONNEMARA TRAIL AND BISCAYNE AVENUE
• KEEGAN LAKE OUTLET
--> STORM SEWER OUTLETS FROM EVENSON
PROPERTY AND BROCKWAY POND TO KEEGAN
LAKE
-> STORM SEWER OUTLET FROM KEEGAN LAKE TO
POND KL -1687
ESTIMATED PROJECT COSTS
• BISCAYNE AVENUE STREET AND UTILILTY
IMPROVEMENTS $497,300
• CONNEMARA TRAIL PHASE 2 STREET AND UTILITY
IMPROVEMENTS $3
• KEEGAN LAKE OUTLET $656,000
PROJECT FUNDING
• BISCAYNE AVENUE
- >SPECIAL ASSESSMENTS $482,900
- ->WATER CORE FUND $12
STREET CIP FUND $1,575
TOTAL $497,300
• CONNEMARA TRAIL PHASE 2
- >SPECIAL ASSESSMENTS $1,453
-- >WATER CORE FUND $319,072
->STO RM CORE FUND $726
- -MUNICIPAL STATE AID FUNDS $518,500
- >STREET CIP $371,388
TOTAL $3,389,000
• KEEGAN LAKE OUTLET
->STORM CORE FUND
->DNR GRANT
TOTAL
$506,000
$150,000
$656,000