HomeMy WebLinkAbout6.k. Change Orger #1 - Connemara Tral Phase II Improvements, City Project #343CITY OF ROSEMOUNT EXECUTIVE SUMMARY FOR ACTION CITY COUNCIL MEETING DATE: December 16, 2003 GENDA SECTIO Change Order #1, Connemara Trail Phase II Improvements includes an amendment to the contract for adding the items shown in the Change Order No. 1 detail. The amount of Change Order #1 is $40,670.50 for a revised contract price of $2,468,389.89. There is no change in the contract schedule as part of this change order. Staff requests Council approval of this item. AGENDA ITEM: Change Order #1 - Connemara Trail Phase II AN: Improvements, City Project #343 Consent PREPARED BY: Andrew J. Brotzler, P.E., City Engineer AGEN ATTACHMENTS: Change Order #1 APPROVED BY: � B es, Inca December 10, 2003 Honorable Mayor and City Council City of Rosemount 2875 145 Street West Rosemount, MN 55068 Re: Change Order No. 1 Connemara Trail— Phase 2 T M City of Rosemount Project No. 343A WSB Project No. 1400 -01 Dear Mayor and City Council Members: Please find enclosed Change Order No. 1 for the above- referenced project. Change Order No. 1 consists of the addition of a 2 -inch fiber optic conduit and access handholes for the City of Rosemount's Supervisory Control and Data Acquisition (SC A) system. In the future, this conduit will be utilized to make the SCADA system operational. It is much more efficient to place the conduit during street and utility construction than it is when the streets, utilities, sidewalks and boulevards are complete. Also included in Change Order No. l is additional sanitary sewer required to provide a strategic sewer service location to the Brockway site. During the design of this project, the ability to locate this service location was not available since the Brockway site had no development plans at that time. We recommend the approval of this Change Order as detailed. Please contact me at 763 -287 -7163 if you have any questions. Sincerely, WSB & Associates, Inc. Mark A. Erichson, P.E. Project Manager �t Enclosure , y cc Tyler Enright, Ryan Contracting Co. Andy Brotzler, City of Rosemount lh F: I WPWINI1400- 011111003- hmcc.doc X_r Minneapolis • St. Cloud • Equal Opportunity Employer DECEMBER 10, 2003 WS B PROJECT NO. 1400 -01 OWNER: CONTRACTOR: City of Rosemount Ryan Contracting Co. 2875 145th Street West 8700 - 13th Avenue East Rosemount, MN 55068 Shakopee, MN 55379 YOU ARE DIRECTED TO MAKE THE FOLLOWING CHANGES IN THE CONTRACT DOCUMENT DESCRIPTION: CONTRACT QUANTITIES ARE MODIFIED AS SHOWN ON THE ATTACHED DETAIL. IT IS UNDERSTOOD THAT THIS CHANGE ORDER INCLUDES ALL ADDITIONAL COSTS AND TIME EXTENSIONS WHICH ARE IN ANY WAY, SHAPE, OR FORM ASSOCIATED WITH THE WORK ELEMENTS ABOVE. CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIME: ORIGINAL CONTRACT PRICE: $2,427,719.39 ORIGINAL CONTRACT TIME: 10/31/2003 PREVIOUS CHANGE ORDERS: ,N /A $0.00 NET CHANGE FROM PREVIOUS CHANGE ORDERS: N/A CONTRACT PRICE PRIOR TO THIS CHANGE ORDER: $2,427,719.39 CONTRACT TIME PRIOR TO THIS CHANGE ORDER: 10/31/2003 NET INCREASE OF THIS CHANGE ORDER: $40,670.50 NET INCREASE OF CHANGE ORDER: N/A CONTRACT PRICE WITH ALL APPROVED CHANGE ORDERS: $2,468,389.89 CONTRACT TIME WITH APPROVED CHANGE ORDERS 10/31/2003 RECOMMENDED BY: APPROV j MARK A. ERICHSON, P.E., PROJECT. MANAGER WSB & ASSOCIATES, INC. RYAN CONTRACTING CO.' ENGINEER CONTRACTOR APPROVED BY: CITY ENGINEER CITY ADMINISTRATOR DATE OF COUNCIL ACTION CONNEMARA TRAIL PHASE it CITY OF ROSEMOUNT DECEMBER 10, 2003 CITY PROJECT NO. 343A ADDITIONAL QUANTITIES Item No. Description Qty Unit Price Extended Amount 229 REMOBILIZATION 1 LUMP SUM $2,500.00 $2,500.00 230 2" CONDUIT 4500 LIN FT $4.25 $19,125.00 231 HANDHOLE 8 EACH $450.00 $3,600.00 232 CONNECT TO EXISTING LINE 1 LUMP SUM $850.00 $850.00 233 BUILD MANHOLE OVER EXISTING LINE 1 LUMP SUM $3,500.00 $3,500.00 234 MANHOLE BUILD (60" DIA.) 15 LIN FT $30100 $4,545.00 235 CASTING 1 EACH $375.00 $375.00 236 21" PVC SDR 26 70 LIN FT $84.65 $5,925.50 237 21" RCP PLUG 1 EACH $250.00 $250.00 TOTAL ADDITIONAL QUANTITIES $40,670.50 TOTAL INCREASE CHANGE ORDER NO. 1 $40,670.50 F:IWPWIM1400- 011Exce11C0 -1C01 Detan