Loading...
HomeMy WebLinkAbout6.i. Change Order #1 Chippendale/CSAH 32 Improvements, City Project #344w CITY OF ROSEMOUNT EXECUTIVE SUMMARY FOR ACTION CITY COUNCIL MEETING DATE: September 16, 2003 Change Order #1, Chippendale /CSAH 42 Improvements, includes the addition of bituminous pathway along the east side of Chippendale Avenue from Carrousel Way to 153r Street. Two water and sanitary sewer services for the Uitdenbogerd property located at 14540 Dodd Boulevard are included as part of Change Order #1. There services are being added in anticipation of 'a lot split and to avoid patching Chippendale Avenue after construction is complete. The last item as part of Change Order #1 is a price reduction resulting from changing the pavement marking arrows on CSAH 42 from poly preform to epoxy. Staff requests Council approval of this item. AGENDA ITEM: Change Order #1 - Chippendale /CSAH 42 AGENDA SECTION: Improvements, City Project #344 Consent PREPARED BY: Andrew J. Brotzler, P.E., City Engineer • AGEN JIM. 6 1 ATTACHMENTS: Change Order #1 APPROVED BY: Change Order #1, Chippendale /CSAH 42 Improvements, includes the addition of bituminous pathway along the east side of Chippendale Avenue from Carrousel Way to 153r Street. Two water and sanitary sewer services for the Uitdenbogerd property located at 14540 Dodd Boulevard are included as part of Change Order #1. There services are being added in anticipation of 'a lot split and to avoid patching Chippendale Avenue after construction is complete. The last item as part of Change Order #1 is a price reduction resulting from changing the pavement marking arrows on CSAH 42 from poly preform to epoxy. Staff requests Council approval of this item. CHIPPENDALE AVENUE AND CSAH 42 SEPTEMBER 10, 2003 STREET IMPROVEMENTS AND APPURTENANT WORK CITY OF ROSEMOUNT PROJECT NO. 344 WSB PROJECT NO. 1399 -00 OWNER: CONTRACTOR: CITY OF ROSEMOUNT MCNAMARA CONTRACTING, INC. 2875 - 145TH STREET WEST 5001 160TH STREET WEST ROSEMOUNT, MN 55068 ROSEMOUNT, MN 55068 YOU ARE DIRECTED TO MAKE THE FOLLOWING CHANGES IN THE CONTRACT DOCUMENT DESCRIPTION: CONTRACT QUANTITIES ARE MODIFIED AS SHOWN ON THE ATTACHED DETAIL. IT IS UNDERSTOOD THAT THIS CHANGE ORDER INCLUDES ALL ADDITIONAL COSTS AND TIME EXTENSIONS WHICH ARE IN ANY WAY, SHAPE, OR FORM ASSOCIATED WITH THE WORK ELEMENTS DESCRIBED ABOVE. CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIME: ORIGINAL CONTRACT PRICE: $1,046,226.56 ORIGINAL CONTRACT TIME (SUBSTANTIAL): 10/31/2003 PREVIOUS CHANGE ORDERS: N/A $0.00 NET CHANGE FROM PREVIOUS CHANGE ORDERS: NONE CONTRACT PRICE PRIOR TO THIS CHANGE ORDER: $1,046,226.56 CONTRACT TIME PRIOR TO THIS CHANGE ORDER: 10/31/2003 NET INCREASE OF THIS CHANGE ORDER: $23,137.85 NET INCREASE OF CHANGE ORDER: NONE CONTRACT PRICE WITH ALL APPROVED CHANGE ORDERS: $1,069,364.41 CONTRACT TIME WITH APPROVED CHANGE ORDERS 10/3112003 RECOMMENDED BY: l� DAM E71-10TON, P.E., PROJECT MANAGER APPROVED BY: WSB & ASSOCIATES, INC. MCNAMARA CONTRACTING, INC. ENGINEER CONTRACTOR APPROVED BY: CITY ENGINEER CITY ADMINISTRATOR DATE OF COUNCIL ACTION Page 1 co ico -i CHIPPENDALE AVENUE AND CSAH 42 September 10, 2003 STREET IMPROVEMENTS AND APPURTENANT WORK CITY OF ROSEMOUNT PROJECT NO. 344 WSB PROJECT NO. 1399.00 DELETED ITEMS Item No. Description Qty Unit Price Extended Amount Qty Unit PAVEMENT MESSAGE (LEFT ARROW) POLY Extended Amount 69 PREFORMED _2 EACH $365.00 ($730.00 ) PAVEMENT MESSAGE (RIGHT ARROW) POLY 70 PREFORMED -4 EACH $365.00 ($1,460.00) TOTAL DECREASE CHANGE ORDER NO. 1 ($2,190.00) ADDED ITEMS Item No. Description Qty Unit Price Extended Amount 71 PAVEMENT MESSAGE (LEFT ARROW) EPDXY 2 EACH $265.00 $530.00 72 PAVEMENT MESSAGE (RIGHT ARROW) EPDXY 4 EACH $265.00 $1,060.00 73 IRREGULAR WIDTH PAVING 128 SQ YD $34.45 $4,409.60 74 BITUMINOUS BIKE PATH 350 LIN FT $17.60 $6,160.00 75 ADD TWO WATER AND SEWER SERVICES 1 LUMP SUM $13,168.25 $13,168.25 TOTAL INCREASE CHANGE ORDER NO. 1 $25,327.85 ADJUSTMENT TO ORIGINAL CONTRACT AMOUNT $23,137.8,5 Page 1 CO 1 CO1 Detail