Loading...
HomeMy WebLinkAbout6.g. Receive Bids/Award Contract-Chippendale Water Tower Painting, City Project #374CITY OF ROSEMOUNT \ EXECUTIVE SUMMARY FOR ACTION CITY COUNCIL MEETING DATE: November 18, 2003 AGENDA ITEM: Receive Bids /Award Contract - Chippendale Water AGENDA SECTION: Tower Painting, City Project 4374 Consent PREPARED BY: Andrew J. Brotzler, P.E., City Engineer I( AGEN A& 6 b e " ATTACHMENTS: Resolution, Bid Tabulation and Letter of APPROVED BY: L Recommendation / On Thursday, October 30, 2003, six (6) bids for the above- referenced project were opened and read aloud publicly. The low bidder for the project was Classic Protective Coatings in the amount of $287,465. The project consists of the painting and refurbishing of the Chippendale Water Tower. Funding for this project will come from the Water Core Fund. Staff recommends adopting a resolution receiving the bids and awarding the bid to the low bidder. RECOMMENDED ACTION: MOTION TO ADOPT A RESOLUTION RECEIVING BIDS AND AWARDING CONTRACT FOR CHIPPENDALE WATER TOWER PAINTING, CITY PROJECT #374. COUNCIL ACTION; h CITY OF ROSEMOUNT DAKOTA COUNTY, MINNESOTA RESOLUTION 2003 A RESOLUTION RECEIVING BIDS AND AWARDING CONTRACT FOR THE CHIPPENDALE WATER TOWER PAINTING' CITY PROJECT NO. 374 WHEREAS, City Council hereby ratifies action of City Engineer to advertise for bids. BE IT FURTHER RESOLVED, by the City Council of the City of Rosemount, Minnesota, as follows: 1. All bids on construction of the Chippendale Water Tower Painting have been received and tabulated. 2. The bid of Classic Protective Coatings, in the amount of $287,465, for the construction of said improvements is in accordance with the plans and specifications and advertisement for bids and is the lowest responsible bid and shall be and hereby is accepted. 3. The Mayor and Clerk are hereby authorized and directed to enter into a contract with said bidder for the construction of said improvements for and on behalf of the City of Rosemount. 4. The City Clerk is hereby authorized and directed to return forthwith to all bidders the deposits made with their bids, except that the deposit of all successful bidder and the next two lowest bidders shall be retained until a contract has beenexecuted. 5. Award of the bid is contingent on the determination by the City Administrator that all necessary rights -of -entry or easements by deed or dedication have been secured for construction of the improvements. ADOPTED this 18' -day of November, 2003. William H. Droste, Mayor ATTEST: Linda Jentink, City Clerk Motion by: Seconded by: Voted in favor: Voted against: .o 3 r BID TABULATION SHEET 3 M z Bid Date: October 30, 2003 Opening Time: 10:00 AM Owner. Cit m y of Rosemount` z M M Proposal Number. 1.0 Description: Cleaning, repairing and painting 500,000 Chippendale Tower X z Owner Project No 374 KLM Project No. MN1830 z Contractor: Bid Bond Affidavit of Bid Item No. 1 Bid Item No.2 Bid* Item No_3 Bid Item NoA Bid Item No.5 Bid Item No.6 Total 50 man hours 3,500 sp ft Exterior Abras Mobilization Protection of Attendance Structural Surface Repairs Int Spot Repair Biast & Coat Move In /Out Antennas Base Bid Required Lum Surn Unit Price Unit Price Lump Sum Lump Sum Lump Sum $ 15.00 lsq,ft $ 12.00 Odland Protective Coatings X X $20,000.00 $6,250.00 $42,000.00 $300,000.00 $30.000.00 $40,000 00 $438,250.00 $ 75.00 lsq.ft $ 10.89 lsq.ft. Classic Protective Coatings X X $33,100.00 $3,750.00 $38,115.00 $189,500.00 $8,000:00 $15,000.04 $267,465,00 $ 100.00 lsq,ft $ 8.00 Isq.ft. Champion Coatings X X $16,000.00 $5,000.00 - $28,000.00 $205,000.00 $25000.40 $12,000.00 $291,000.00 $ 80.00 lsq.ft $ 6.50 /sq.ft. TMI X . X $12,000.00 $4,Ob0.00 $22,760.00 $218,000.00 $20,000.00 $20,000.00 $296,750.00 $ 75.00 fsq.ft $ .15.00 /sq.ft. LeadCon, Inc.'' X X $45,000.00 $3,750.00 $52,500.00 $228,750.00 $10,000.00 $8.000.00 $348,000.00, D X z 0 N 'w N N c m N m rcm -,1 0 BID TABULATION SHEET _ 3 - z z Bid Date. October 30, 2003 Opening Time: 10:00 AM Owner: Ci�t+ of Rosemount' z m M Proposal Number. 1.0 Description: Cleaning, repairing and painting 500,000 Chippendale Tower •� z c� Owner Project No: 374 KLM Project No. MN1830 z Contractor. Bid Bond Affidavit of Attendance Required Bid Item No.1 Bid Item No.2 Bid Item No.3 Bid Item NoA Bid Item No.5 Bid Item No.B Total Structural Lump Sum 50 man hours Surface Repairs Unit Price 3,50D sp ft Int Spot Repair Unit Price Exterior Abras Blast & Coat Sum Mobilization Move In /Out Lump Sum Protection of Antennas Lump Sum Base Bid _ Lump $ /hour $ /hour Tenyer X X $16,200.00 $ 920.00 /hour $6,000.00 3 10.00 /hour $35,000.00 $284,000.40 $31,000.00 $15,000.00' $387,200.00 $ /hour $ /hour $ /hour $ /hour $ /hour $ /hour $ /hour $ /hour X z m w u, N N z O C m U N CD M U I m X 3 r BID TABULATION SHEET M M z Bid Date: October 30, 2003 Opening Time: 10:00 AM Owner: City of Rosemount' m M Proposal Number: 2.0 Description: Cleaning, repairing and painting 500,000 Chippendale Tower z Owner Project No: 374 KLM Project No. MN 1830 z Contractor: Bid Bond Affidavit of Bid Item No. 1 Bid Item No. 2 Total Remove Chain Chain Link Attendance Link Fence Fence Base Bid Required Lump S ure 675 Lineal Ft Odiand Protective X X T Coatings $3,000.00 $26,250.00 Classic Protective X X Coatings $10,000.00 $28,400.00 Champion X X Coatings $1,000.00 $20,125.00 TMI X X $1,200.00 $19,250.00 LeadCon, inc. X X $5,000.00 $24,500A0 - x z m w cn z 0 m w N m m m fU Ed Wd9b Z0 €00Z 20 -,- 'ON ZZZS 21.2- ZS9 'ON Xdd 'ON I 9N I d33N I JN9 W-71: 'WONA d "D o0 o �+ c z � ao CL m 0 CL a V N O > > A N m m Q, jo � is a W rr'�CX7 =. n 3 $ c? � z fl c 0 - o V). C z FP o 0 0o n tit CD Z 'so . 0 o (A ° o m N z 13) Cm o w m rn �' a CC a o +� n � A Q O d C. 0 E3 ? O i= A CL " Al to -4 Ed Wd9b Z0 €00Z 20 -,- 'ON ZZZS 21.2- ZS9 'ON Xdd 'ON I 9N I d33N I JN9 W-71: 'WONA