Loading...
HomeMy WebLinkAbout6.f. Receive Bids/Award Contract for Trunk Highway 3 Enhancement Improvements, City Project #318JUL -16 -2002 08 53 SB SIM Assorla Ina July 16, 2002 Honorable Mayor and City Council City of Rosemount 2875 145 Street West Rosemount, MN 550684997 Dear Mayor and Council Members: Sincerely, WSB Associates, Inc. dire David E. Hutton, P.E. Project Manager Enclosures cc: Valley Paving, Inc. sb WSB 8 RSSOCIRTES INC. 7635411700 P.02'03 RE: Trunk Highway 3 Street and Utility Construction and Appurtenant Work S.P. No. 1921 73 City of Rosemount Project No. 318 WSB Project No. 1191 -21 Minneapolis St. Cloud Equal Opportunity Employer T c vn 4 Bids were received for the above- referenced project on Monday, July 15, 2002, and were opened and read aloud. A total of three bids were received. The bids were checked for mathematical accuracy and tabulated. Please find enclosed the bid tabulation indicating the low bidder as Valley Paving, Inc., Shakopee, Minnesota in the amount of $2,128,583.16. We recommend that the City Council consider these bids and award a contract to Valley Paving, Inc. based on the results of the bids received. F.iWfl WI l- 2lv,rwmh lrAc Date: July 16, 2002 To: Honorable Mayor and City Council Members Thomas D. Burt, City Administrator From: Andrew J. Brotzler, P.E. City Engineer Re: TH 3 Enhancement Project Funding City Project #318 Memorandum As you are aware, bids were received for the above- referenced project on Monday, July 15, 2002. Based on the low bid amount of $2,123,583.16 and adding 30% for indirect costs, the total project cost is $2,767,158.11. This total project cost is $340,000.00 higher than the estimated project cost used when bonds were sold for the project in June. In 2001, 5671,000.00 was transferred from the Street CIP Reserve Fund to the TH 3 project account for the Phase II (145' Street to Lower 147 Street) project. As this project was not completed in 2001 and has been included in the project before you tonight, these funds remain available in the project account to fund the $340,000.00 difference in project costs. Council adoption of the attached resolution to award the contract to Valley Paving, Inc. will constitute approval of the funding for the project cost. ADOPTED this 16 day of July, 2002. ATTEST: Linda Jentink, City Clerk CITY OF ROSEMOUNT DAKOTA COUNTY, MINNESOTA RESOLUTION 2002 A RESOLUTION RECEIVING BIDS AND AWARDING CONTRACT FOR THE TRUNK HIGHWAY 3 IMPROVEMENTS BETWEEN 145 STREET AND CSAH 42 CITY PROJECT #318 BE IT FURTHER RESOLVED, by the City Council of the City of Rosemount, Minnesota, as follows: 1. All bids on construction of the Trunk Highway 3 Improvements between 145` Street and CSAH 42 are hereby received and tabulated. 2. The bid of Valley Paving, Inc., in the amount of 52,128,583.16 for the construction of said improvements are in accordance with the plans and specifications and advertisement for bids is the lowest responsible bid and shall he and hereby is accepted. 3. The Mayor and Clerk are hereby authorized and directed to enter into a contract with said bidder for the construction of said improvements for and on behalf of the City of Rosemount, contingent upon Mn'DOT concurrence with the bid of Valley Paving, Inc. 4. The City Clerk is hereby authorized and directed to return forthwith to all bidders the deposits made with their bids, except that the deposit of all successful bidder and the next two lowest bidders shall be retained until a contract has been executed. 5. Award of the bid is contingent on the determination by the City Administrator that all necessary rights -of -entry or easements by deed or dedication have been secured for construction of the improvements. Cathy Busho, Mayor Motion by: Seconded by: Voted in favor: Voted against: