Loading...
HomeMy WebLinkAbout6.j. Receive Bids/Award Contract - Evermoor Drumcliffe Street and Utility Improvements, City Project #348AGENDA ITEM• Receive Bids /Award Contract Evermoor Drumcliffe Street and Utility Improvements, City Project #348 AGENDA SECTION: Consent PREPARED BY: Andrew J Brotzler, P.E City Engineer AGEN Q.: #6 '"'tt1�Y1 ATTACHMENTS: Resolution, Bid Tabulation, Letter APPROVED BY: 1 CITY OF ROSEMOUNT EXECUTIVE SUMMARY FOR ACTION CITY COUNCIL MEETING DATE: May 21, 2002 J On Wednesday, May 15, 2002, bids for the referenced project were received and read aloud publicly. Four (4) bids were received on the project. The low bidder for the project is Northdale Construction, Inc of Rogers, MN in the amount of $697,344 50 The bids ranged from the low bid to a high bid of $746,231.97 and the Engineer's Estimate was $700,000 The grading was done on this Addition with the first phase of Evermoor. This project includes the construction of streets and utilities RECOMMENDED ACTION: MOTION TO ADOPT A RESOLUTION RECEIVING THE BIDS AND AWARDING THE CONTRACT FOR EVERMOOR DRUMCLIFFE STREET AND UTILITY IMPROVEMENTS, CITY PROJECT #348 COUNCIL ACTION: ADOPTED this 21 day of May, 2002 ATTEST Linda Jentrnk, City Clerk CITY OF ROSEMOUNT DAKOTA COUNTY, MINNESOTA RESOLUTION 2002 A RESOLUTION RECEIVING BIDS AND AWARDING CONTRACT FOR EVERMOOR DRUMCLIFFE STREET AND UTILITY IMPROVEMENTS CITY PROJECT #348 BE IT RESOLVED, by the City Council of the City of Rosemount, Minnesota, as follows 1 All bids on construction of the Evermoor Drumcliffe Street and Utility Improvements are hereby received and tabulated 2 The bid of Northdale Construction Company, Inc in the amount of $697 344 50 for the construction of said improvements are in accordance with the plans and specifications and advertisement for bids is the lowest responsible bid and shall be and hereby is accepted 3 The Mayor and Clerk are hereby authorized and directed to enter into a contract with said bidder for the construction of said improvements for and on behalf of the City of Rosemount 4 The City Clerk is hereby authorized and directed to return forthwith to all bidders the deposits made with their bids, except that the deposit of all successful bidder and the next two lowest bidders shall be retained until a contract has been executed Cath} Busho, Mayor Motion by Seconded by Voted in favor Voted against MAY -16 -2002 1030 WSB 8 ASSOCIATES INC. 7635411700 P.02/07 a 'WSB SWINK Associates, Inc May 15, 2002 Honorable Mayor and City Council City of Rosemount 2875 145th Street West Rosemount, MN 55068 -4997 Re: Evermoor's Drumcliffe Addition City of Rosemount, MN City Project No, 348 WSB Project No. 1420 -00 Dear Mayor and Council Members: Bids were received for the above referenced project on May 15, 2002 and were opened and read aloud. A total of four bids were received. The bids were checked for mathematical accuracy and tabulated, Please find enclosed the bid tabulation indicating the low bidder as Northdale Construction, Inc., Rogers, Minnesota in the amount of $697,344.50. We recommend that the City Council consider these bids and award a contract to Northdale Construction, Inc based on the results of the bids received. Sincerely, WSB Associates, Inc. Mark A. Ericbson, P.E. Project Manager Enclosures 415b pen! c: Northdale Construction, Inc. MemorlalM}:lFghway Suite 300 uL n111 nneapallst'; ,,qq iai 'r 9 763 541 17636 F \WPW1N \1420- 00\recnundtn dr doe Minneapolis St, Cloud Equal Opportunity Employer MAY-16-2002 10:30 Bid Tabulation WSB RSSOCIATES INC. 7635411700 P.03/07 Project Name: Evermoor's Drumcl ffe Addition Client City of Rosemount Project No. 348 WSB Project No 1420 -00 Contractor F AWPWIN11420-001EXCEL1BidTab161d Summary Bid Addendum Addendum Security No. 1 No. 2 Total Bid 1 Northdale Construction, Inc X X X $697,344.50 2 S J Louis Construction, Inc X X X $730,322.75 3 Ryan Contracting Co X X X $744,858.60 4 Richard Knutson, Inc X X X $746,231 97 Engineer's Estimate $741,557.40 I hereby certify that this is a true and correct tabulation of the bids as received on May 15, 2002. Mark A Erickson, P Denotes corrected figure