Loading...
HomeMy WebLinkAbout6.h. Change Order #1, Wensmann Pond Bank Stabilization, City Project #334CITY OF ROSEMOUNT EXECUTIVE SUMMARY FOR ACTION CITY COUNCIL MEETING DATE July 2, 2002 AGENDA ITEM: Change Order #1, Wensmann Pond Bank AGENDA SECTION: Stabilization, City Project #334 Consent PREPARED BY: Andrew J Brotzler P E, City Engineer AGEN f 6 r F LL�IYY�I r �7 ATTACHMENTS: Change Order #1 APPROVED BY- Included is Change Order No 1 for the Wensmann Pond Bank Stabilization Project The additional costs encompasses the work and material needed to install a water level control device and stabilize all the erosion sensitive areas of Wensmann Pond Wensmann Pond is a regional stormwater pond where the water levels can fluctuate drastically Staff needs the ability to control the water elevations during large storm events Plans were developed and awarded to Lloyd's Construction Services to construct the telemetry system as part of the Pond Bank Stabilization project The structure has been installed and the electrical float is ready to be wired into the system In addition, trees were added around the newly installed structures to provide an enhanced look to the area. Staff is asking that the Council approve the attached Change Order 41 for the Wensmann Pond Bank Stabilization, City Project 4334 RECOMMENDED ACTION: MOTION TO APPROVE CHANGE ORDER 41 FOR THE WENSMANN POND BANK STABILIZATION, CITY PROJECT 4334 AND AUTHORIZE THE NECESSARY SIGNATURES COUNCIL ACTION: CHANGE ORDER NO 1 E Wensman Pond Bank Stabilization June 26, 2002 City of Rosemount Protect No 334 WSB Protect No 1005 -29 OWNER City of Rosemount 2875 145th Street West Rosemount, MN 55068 CONTRACTOR Lloyd's Construction Services, Inc 7207 West 128th Street Savage MN 55378 YOU ARE DIRECTED TO MAKE THE FOLLOWING CHANGES IN THE CONTRACT DOCUMENT DESCRIPTION SEE ATTACHED DETAIL FOR ADDITIONAL QUANTITIES AND COSTS IN CONTRACT PRICE ORIGINAL CONTRACT PRICE PREVIOUS CHANGE ORDERS NO_TO_ CONTRACT PRICE PRIOR TO THIS CHANGE ORDER NET INCREASE /DECREASE OF THIS CHANGE ORDER CHANGE IN CONTRACT TIME $98,09000 ORIGINAL CONTRACT TIME 7112002 $000 NET CHANGE FROM PREVIOUS CHANGE ORDERS NONE $98,09000 CONTRACT TIME PRIOR TO THIS CHANGE ORDER 7112002 $12,31600 NET INCREASE OF CHANGE ORDER NONE CONTRACT PRICE WITH ALL APPROVED CHANGE ORDERE $110,406 00 CONTRACT TIME WITH APPROVED CHANGE ORDERS 7/1/2002 RECOMMENDED BY .���14" Mark A Ertchson, P E WSB 8 ASSOCIATES, INC ENGINEER APPROVED BY CITY ENGINEER DATE APPROVED BY x n T Ltey .1 ms,1.^A- LLOYD'S CONSTRUCTION SERVICES, INC CONTRACTOR F IWPW1M1005- 291ExceR1005 -29 VoucheACO -1 Change Order No 1 Detail Wensman Pond Bank Stabilization City of Rosemount Project No 334 WSB Project No 1005 -29 ADDITIONAL ITEMS Total Additional Items $12,316.00 F IWPWlM1005- MExceA1005 -29 VoucheAC01 Detail Extended Item No Description Qty Unit Price Amount NEW MANHOLE STRUCTURE 1 EA $5,30000 $5,30000 NEW SAND IMPORT 632 CY $7 50 $4,74000 NEW MANHOLE RE- CONSTRUCT 1 LS $1,40000 $1,40000 NEW TREES 4 EA $21900 $876 00 Total Additional Items $12,316.00 F IWPWlM1005- MExceA1005 -29 VoucheAC01 Detail