Loading...
HomeMy WebLinkAbout7.e. Receive Bids/Award Contract 2001 Street & Utility Reconstruction Improvements, City Project 326, It CITY OF ROSEMOUNT EXECUTIVE SUMMARY FOR ACTION CITY COUNCIL MEETING DATE: June 18, 2001 AGENDA ITEM: Receive Bids /Award Contract -2001 Street & AGENDA SECTION: Utility Reconstruction Improvements, City Project #326 Old Business PREPARED BY: Bret Weiss, Interim City Engineer AGENDA 17 , F ATTACHMENTS: Resolution I APPROVED BY:, 0< On Wednesday, June 13, 2001, bids for the referenced project were received and read aloud publicly. Three (3 ) bids were received on the project. The apparent low bidder for the project is Arcon Construction, Inc. of Haris, MN in the amount of $1,177,255.38. The bids ranged from the low bid to a high bid of $1,244,254.30 and the Engineer's Estimate was $1,144,655.50. The bid was slightly higher than the estimate and could constitute a project cost increase of approximately $30,000. Council should be aware of the potential increase and options for reducing the potential cost over -run will be provided at the meeting. It should be noted that all bids seem to be higher this year due to the weather conditions and the high number of construction projects. RECOMMENDED ACTION: MOTION TO ADOPT A RESOLUTION RECEIVING BIDS AND AWARDING THE CONTRACT FOR 2001 STREET AND UTILITY RECONSTRUCTION IMPROVEMENTS, CITY PROJECT #326. COUNCIL ACTION: 1 CITY OF ROSEMOUNT DAKOTA COUNTY, MINNESOTA RESOLUTION 2001— A RESOLUTION RECEIVING BIDS AND AWARDING CONTRACT FOR THE 2001 STREET AND UTILITY RECONSTRUCTION IMPROVEMENTS CITY PROJECT #326 BE IT RESOLVED, by the City Council of the City of Rosemount, Minnesota, as follows: All bids on construction of the 2001 Street and Utility Reconstruction Improvements are hereby received and tabulated. 2. The bid of Arcon Construction, Inc. , in the amount of $1,177,255.38 for the construction of said improvements are in accordance with the plans and specifications and . advertisement for bids is the lowest responsible bid and shall be and hereby is accepted. 3. The Mayor and Clerk are hereby authorized and directed to enter into a contract with said bidder for the construction of said improvements for and on behalf of the City of Rosemount. 4. The City Clerk is hereby authorized and directed to return forthwith to all bidders the deposits made with their bids, except that the deposit of all successful bidder and the next two lowest bidders shall be retained until a contract has been executed. ADOPTED this 18 day of June, 2001. Cathy Busho, Mayor ATTEST: Linda Jentink, City Clerk Motion by: Seconded by: Voted in favor: Voted against: AlAk WS B i cPz Associates, Inc. June 18, 2001 Honorable Mayor and City Council City of Rosemount 2875 145` Street West Rosemount, MN 55068 -4941 2001 Street & Utility Reconstruction Project City of Rosemount Project No. 326 WSB Project No. 1304 -00 Dear Mayor and Council Members: Bids were received for the above - referenced project at 10:00 a.m., June 13, 7001, and were opened and read aloud. A total of three bids were received. The bids were checked for mathematical accuracy and tabulated. Please find enclosed the bid tabulation indicating the low bidder as Arcon Construction Co.,,'Inc., Harris, MN, in the amount of $1,1 7 7,255.39. We recommend eward of the contract to Arcon Construction Co., Inc. in t1.is ameunl. Sincerely, WSB & AssQCia es, Inc. Bret A. Weiss, P.F. irate im City Engineer Enclosures Arcon. Construction, ?ne. F: WP" ?).,1304 CU- recimndta Ltr..3oc Minneapolis • St. Cloud . Equal Opportunity Employer BID TABULATION 2001 Street & Utility Reconstruction Project City of Rosemount Project No. 326 WSB Project No. 1304 -00 Bids Opened: June 13, 2001 - 10:00 A.M. Contractor Bid Security Total Bid 1 Arcon Const Co Inc 2 McNamara Const Inc 3 Ryan Contracting Co X $1,177,255.39 ** X $1,232,738.83 X $1,244,254.30 Engineer's Estimate $1,147,455.50 I hereby certify that this is a true and correct tabulation of the bids as received on June 13, 2001. Bret A. Weiss, P.E. ** Denotes corrected figure F: \EXCEL \bidtab \Bid Summary Extension of Bids Project: 2001 Street & Utility Reconstruction Project City of Rosemount Project No. 326 Checked lay: N. Marshall Date: 06/13/01 '"MI Denotes corrected figure Cost Opinion Low Bidder 2nd Low Bidder $1,147,455.50 >? $ ;17T25v.39_` ' $1.232.738.83 Line No. Item Number Descri tion Unit Estimated Quantit Cost Opinion t Co Inc McNama ra Const Inc Unit Price Estimated Cost Ercon Cost Unit Price Cost 32 2557.603 INSTALL C HAIN LI F ENCE LIN FT LIN FT 150.00 20.00 $8.00 $10.00 $1,200.00 $200.00 $8.00 $15.00 $1,200.00 $300.00 $4.50 $10.00 $675.00 $200.00 33 2557.603 INSTALL WOODEN FE 34 2563.601 TRAFFIC CONTROL LUMP SUM 1.00 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $5,250.00 $5,250.00 35 2564.531 F &I SIGN PANELS TYPE C SQ FT 137.75 $20.00 $2,755.00 $19.75 $2,720.56 $20.95 $2,885.86 36 2564.602 F &I SIGN PANELS TYPE D EACH 4.00 $225.00 $900.00 $225.00 $900.00 $257.25 $1,029.00 37 2564.602 INSTALL SIGN TYPE C EACH 1.00 $100.00 $100.00 $55.00 $55.00 $100.00 $100.00 38 2564.602 INSTALL SIGN TYPE D EACH 1.00 $100.00 1 $100.00 $65.00 $65.00 $100.00 1 $100.00 39 2564.603 4" SOLID LINE WHITE -EPDXY LIN FT 3,785.00 $0.40 $1,514.00 $0.60 $2,271.00 $0.65 $2,460.25 40 2564.603 4" DOUBLE SOLID LINE YELLOW -EPDXY LIN FT 1,900.00 $0.80 $1,520.00 $1.24 $2,356.00 $1.30 $2,470.00 41 2564.603 4" DOUBLE SOLID LINE YELLOW -PAINT LIN FT 1,900.00 $0.50 $950.00 $1.00 $1,900.00 $1.05 $1,995.00 42 2564.603 12" SOLID LINE WHITE -EPDXY LIN FT 12.00 $1.00 $12.00 $8.00 $96.00 $8.40 $100.80 43 2564.604 ZEBRA CROSSWALK -WHITE POLY PREFORMED SQ FT 90.00 $5.00 $450.00 $14.00 $1,260.00 $14.70 $1,323.00 44 2565.603 4' NON - METALLIC CONDUIT LIN FT 300.00 $5.00 $1,500.00 $9.20 $2,760.00 $4.00 $1,200.00 45 2571.501 WHITE PINE 6' HT B &B TREE 3.00 $300.00 $900.00 $235.00 $705.00 $247.00 $741.00 46 2571.501 COLORADO SPRUCE 6' HT B &B TREE 3.00 $300.00 $900.00 $235.00 $705.00 $247.00 $741.00 47 2571.501 BLACK HILLS SPRUCE 6'HT B &B TREE 3.00 $300.00 $900.00 $235.00 $705.00 $247.00 $741.00 48 2571.502 AUTUMN BLAZE MAPLE 2.5" CAL B &B TREE 3.00 $300.00 $900.00 $365.00 $1,095.00 $384.00 $1,152.00 49 2571.502 BUR OAK 2.5" CAL B &B TREE 3.00 $300.00 $900.00 $450.00 $1,350.00 $473.00 $1,419.00 50 2571.505 HENRY KELSEY SHRUB ROSE, #2 CONT. SHRUB 20.00 $75.00 $1,500.00 $40.00 $800.00 $42.00 $840.00 51 2571.505 ISANTI DOGWOOD #5 CONT. SHRUB 20.00 $75.00 $1,500.00 $40.00 '$800.00 $42.00 $840.00 52 2571.505 ARROWWOOD VIBURNUM #5 CONT. SHRUB 20.00 $75.00 $1,500.00 $40.00 $800.00 $42.00 $840.00 53 2571.541 TRANSPLANT TREE TREE 2.00 $300.00 $600.00 $400.00 $800.00 $200.00 $400.00 54 2571.544 TRANSPLANT SHRUB SHRUB 2.00 $200.00 $400.00 $100.00 $200.00 $100.00 $200.00 55 2573.501 BALE CHECK EACH 110.00 $5.00 $550.00 $6.75 $742.50 $7.10 $781.00 56 2573.502 SILT FENCE, TYPE HEAVY DUTY LIN FT 2,000.00 $3.00 $6,000.00 $1.75 $3,500.00 $1.85 $3,700.00 57 2575.501 SEEDING ACRE 2.70 $1,000.00 $2,700.00 $850.00 $2,295.00 $1,945.00 $5,251.50 58 1 2575.505 SODDING TYPE LAWN SQ YD 18,000.00 $2.00 $36,000.00 $1.63 $29,340.00 $2.75 $49,500.00 Total Schedule A $796,536.00 $765,545.06 $815,990.91 M: \1304- 002 \EXCEL \bidtab.xls \Bid Detail Page 2 of 8 Extension of Bids Project: 2001 Street & Utility Reconstruction Project City of Rosemount Project No. 326 Checked By: N. Marshall Date: 06/13/01 Denotes corrected figure Cost Opinion Low Bidder $1,147,455.50 $1177,255.39'` 2nd Low Bidder $1,232,738.83 Line No. Item Number Description Unit Estimated Quantit Cost Opinion Arcon Const Co Inc McNamara Const Inc Unit Price Estimated Cost Unit Price Cost Unit Price Cost Schedule B - Watermain Improvements LIN FT 3,050.00 $7.00 $21,350.00 $3.60 $10,980.00 $4.20 $12,810.00 59 2104.501 REMOVE WATER MAIN 60 2104.501 REMOVE WATER SERVICE PIPE LIN FT 1,570.00 $3.00 $4,710.00 $1.20 $1,884.00 $2.65 $4,160.50 61 2104.509 REMOVE VALVE AND BOX EACH 13.00 $100.00 $1,300.00 $90.00 $1,170.00 $63.00 $819.00 62 2104.509 REMOVE HYDRANT EACH 7.00 $400.00 $2,800.00 $240.00 $1,680.00 $262.50 $1,837.50 63 2104.509 REMOVE CURB STOP & BOX EACH 49.00 $50.00 $2,450.00 $60.00 $2,940.00 $31.50 $1,543.50 64 2104.606 ABANDON WATER MAIN (FILL WITH SAND) LIN FT 1,810.00 $3.00 $5,430.00 $2.00 $3,620.00 $6.30 $11,403.00 65 2504.601 TEMPORARY WATER SERVICE LUMP SUM 1.00 5,000.00 $15,000.00 $8,000.00 $8,000.00 $5,250.00 $5,250.00 66 2504.602 8" GATE VALVE AND BOX EACH 14.00 $8,400.00 $908.00 $12,712.00 $682.50 $9,555.00 67 2504.602 CONNECT TO EXISTING WATER MAIN EACH 10.00 [$600.00 500.00 $5,000.00 $370.00 $3,700.00 $1,260.00 $12,600.00 68 2504.602 CONNECT TO EXISTING WATER SERVICE EACH 55.00 100.00 $5,500.00 $73.00 $4,015.00 $315.00 $17,325.00 69 2504.602 3/4" CORPORATION STOP EACH 4.00 $40.00 $160.00 $40.00 $160.00 $21.00 $84.00 70 2504.602 1" CORPORATION STOP EACH 45.00 $50.00 $2,250.00 $51.00 $2,295.00 $23.10 $1,039.50 71 2504.602 3/4" CURB STOP & BOX EACH 4.00 $100.00 $400.00 $80.00 $320.00 $73.50 $294.00 72 2504.602 1" CURB STOP & BOX EACH 45.00 $100.00 $4,500.00 $94.00 $4,230.00 $84.00 $3,780.00 73 2504.602 HYDRANT ASSEMBLY EACH 9.00 $1,800.00 $16,200.00 $2,075.00 $18,675.00 $2,100.00 $18,900.00 74 2504.603 3/4" TYPE K COPPER PIPE LIN FT 120.00 $8.00 $960.00 $16.80 $2,016.00 $12.60 $1,512.00 75 2504.603 1" TYPE K COPPER PIPE LIN FT 1,680.00 $10.00 $16,800.00 $17.15 $28,812.00 $13.65 $22,932.00 76 2504.603 6" WATER MAIN - DUCT IRON CL 52 LIN FT 100.00 $19.00 $1,900.00 $18.74 $1,874.00 $21.00 $2,100.00 77 2504.603 8" WATER MAIN - DUCT IRON CL 52 LIN FT 5,450.00 $20.00 $109,000.00 $19.57 $106,656.50 $26.25 $143,062.50 78 2504.605 4" POLYSTYRENE INSULATION SQ YD 100.00 $20.00 $2,000.00 $19.20 $1,920.00 $15.75 $1,575.00 79 2504.620 DUCTILE IRON FITTINGS POUND 5,000.00 $1.50 $7,500.00 $1.70 $8,500.00 $2.10 $10,500.00 Total Schedule B 11 1 $233,610.00 11 1 $226,159.50 $283,082.50 M: \1304 - 002 \EXCEL\bidtab.xls \Bid Detail Page 3 of 8 Extension of Bids Project. 2001 Street & Utility Reconstruction Project City of Rosemount Project No. 326 Checked By: N. Marshall Date: 06/13/01 Denotes corrected figure Cost Opinion Low Bidder 2nd Low Bidder $1,147,455.50 $1.177.255.39 $1.232.738.83 Line No. Item Number Description Unit Estimated Quantity Cost Opinion Arcon Const Co Inc McNamara Const Inc Unit Price Estimated Cost Unit Price Cost Unit Price Cost Schedule C - Storm Sewer Improvements 80 2104.501 REMOVE SEWER PIPE (STORM -ALL SIZES/TYPES) LIN FT $5.00 $850.00 $9.60 $1,632.00 $5.25 $892.50 81 2104.509 REMOVE MANHOLE OR CATCH BASIN EACH $250.00 $250.00 $360.00 $360.00 $262.50 $262.50 82 2104.509 REMOVE CASTING EACH $100.00 $100.00 $120.00 $120.00 $31.50 $31.50 83 2105.609 GEOTEXTILE FABRIC TYPE IV SQ YD K20.00 $2.00 $40.00 $1.40 $28.00 $2.10 $42.00 84 2501.515 24" RC PIPE APRON WITRASH GUARD EACH $1,000.00 $1,000.00 $1,105.00 $1,105.00 $735.00 $735.85 2501.515 36" RC PIPE APRON W/TRASH GUARD EACH $1,800.00 $1,800.00 $1,840.00 $1,840.00 $1,207.50 $1,207.50 86 2503.541 15" RC PIPE DESIGN 3006 CLASS V LIN FT $21.00 $23,037.00 $24.33 $26,690.01 $28.35 $31,099.95 87 2503.541 18" RC PIPE DESIGN 3006 CLASS III LIN FT . $23.00 $8,602.00 $26.28 $9,828.72 $29.40 $10,995.60 88 2503.541 24" RC PIPE DESIGN 3006 CLASS III LIN FT 440.00 $28.00 $12,320.00 $30.38 $13,367.20 $34.65 $15,246.00 89 2503.541 36" RC PIPE DESIGN 3006 CLASS III LIN FT 452.00 $45.00 $20,340.00 $54.13 $24,466.76 $57.75 $26,103.00 90 2503.603 15" HDPE SEWER PIPE LIN FT 349.00 $18.00 $6,282.00 $22.96 $8,013.04 $21.00 $7,329.00 91 2506.501 CONST. DRAINAGE STIR. DES. 48 -4020 LIN FT 51.63 $150.00 $7,744.50 $737.00 $38,051.31 $147.00 $7,589.61 92 2506.501 CONST. DRAINAGE STR. DES. 60 -4020 LIN FT 18.72 $200.00 $3,744.00 $1,412.20 $26,436.38 $220.50 $4,127.76 93 2506.502 CONST DRAINAGE STRUCTURE DESIGN SPEC 1 (2X3 CB) EACH 22.00 $1,100.00 $24,200.00 $1,155.00 $25,410.00 $945.00 $20,790.00 94 2506.516 CASTING ASSEMBLY EACH 14.00 $300.00 $4,200.00 $411.60 $5,762.40 $294.00 $4,116.00 95 2506.602 CONNECT TO EXISTING STORM SEWER EACH 2.00 $500.00 $1,000.00 $410.00 $820.00 $840.00 $1,680.00 96 2511.501 RANDOM RIP RAP CLASS IV CU YD i 30.00 $60.00 $1,800.0011 $54.00 $1,620.00 $47.25 $1,417.50 Total Schedule C $117,309.50 $185,550.82 $133,665.42 Grand Total $1,147,455.50 E•. � IL S1�'I y7, 55r� ', �� $1,232,738.83 M: \1304- 002 \EXCEL\bidtab.xls \Bid Detail Page 4 of 8 Extension of Bids Project: 2001 Street & Utility Reconstruction Project City of Rosemount Project No. 326 Checked By: N. Marshall Date: 06/13/01 Cost Opinion 3rd Low Bidder $1.147.455.50 SI 2AA era %n Line No. Item Number Description Unit Estimated Quantity Cost Opinion R an Contracting Co Unit Price Estimated Cost Unit Price Cost Schedule A - Surface Improvements 1 2021.501 MOBILIZATION (5% MAX) LUMP SUM TREE TREE 1.00 10.00 10.00 $15,000.00 $200.00 $200.00 $15,000.00 $2,000.00 $2,000.00 $58,000.00 $460.00 $160.00 $58,000.00 $4,600.00 $1,600.00 2 2101.502 CLEARING 3 2101.507 GRUBBING 4 2104.501 REMOVE CURB AND GUTTER LIN FT 6,000.00 $3.00 $18,000.00 $3.00 $18,000.00 5 2104.501 REMOVE PIPE CULVERTS ( ALL SIZES) LIN FT 750.00 $5.00 $3,750.00 $15.00 $11,250.00 6 2104.505 REMOVE BITUMINOUS PAVEMENT SQ YD 15,000.00 $2.00 $30,000.00 $1.25 $18,750.00 7 2104.511 SAWING CONCRETE PAVEMENT (FULL DEPTH) LIN FT 150.00 $5.00 $750.00 $6.50 $975.00 8 2104.513 SAWING BIT PAVEMENT (FULL DEPTH) LIN FT 1,000.00 $3.00 $3,000.00 $2.50 $2,500.00 9 2104.521 SALVAGE CHAIN LINK FENCE LIN FT 150.00 $5.00 $750.00 $6.00 $900.00 10 2104.521 SALVAGE WOODEN FENCE LIN FT 20.00 $10.00 $200.00 $6.00 $120.00 11 2104.521 SALVAGE SPRINKLER SYSTEM LIN FT 500.00 $3.00 $1,500.00 $1.00 $500.00 12 2104.523 SALVAGE SIGN EACH 25.00 $15.00 $375.00 $50.00 $1,250.00 13 2105.501 COMMON EXCAVATION (P) CU YD 17,500.00 $6.00 $105,000.00 $6.50 $113,750.00 14 2105.507 SUBGRADE EXCAVATION CU YD 9,500.00 $6.00 $57,000.00 $3.00 $28,500.00 15 2105.521 GRANULAR BORROW (CV) CU YD 11,900.00 $7.00 $83,300.00 $7.50 $89,250.00 16 2105.603 POND EXCAVATION CU YD 15,000.00 $5.00 $75,000.00 $5.00 $75,000.00 17 2211.501 AGGREGATE BASE CLASS 5 (100% CRUSHED) TON 9,000.00 $9.00 $81,000.00 $10.50 $94,500.00 18 2331.601 BITUMINOUS DRIVEWAY PAVEMENT SQ YD 1,200.00 $15.00 $18,000.00 $10.00 $12,000.00 19 2350.609 TYPE LV 3 WEARING COURSE MIXTURE TON 1,800.00 $31.00 $55,800.00 $28.90 $52,020.00 20 2350.609 TYPE LV 3 NON WEARING COURSE MIXTURE TON 1,800.00 $31.00 $55,800.00 $27.60 $49,680.00 21 2357.502 BITUMINOUS MATERIAL FOR TACK COAT GALLON 850.00 $2.00 $1,700.00 $1.00 $850.00 22 2451.601 GRANULAR FOUNDATION AND /OR BEDDING CU YD 100.00 $7.00 $700.00 $15.00 $1,500.00 23 2504.603 INSTALL SPRINKLER SYSTEM LIN FT 500.00 $3.00 $1,500.00 $5.00 $2,500.00 24 2506.511 RECONSTRUCT MANHOLES LIN FT 10.00 $200.00 $2,000.00 $210.00 $2,100.00 25 2506.522 ADJUST FRAME & RING CASTING EACH 13.00 $150.00 $1,950.00 $275.00 $3,575.00 26 2521.604 BITUMINOUS BIKE PATH (8' WIDE) LIN FT 2,120.00 $10.00 $21,200.00 $8.90 $18,868.00 27 2531.501 CONCRETE CURB & GUTTER DESIGN B612 LIN FT 70.00 $6.50 $455.00 $10.00 $700.00 28 2531.501 CONCRETE CURB & GUTTER DESIGN 8618 LIN FT 10,100.00 $7.00 $70,700.00 $7.60 $76,760.00 29 2531.503 CONCRETE MEDIAN SQ YD 26.00 $35.00 $910.00 $36.00 $936.00 30 2531.507 6" CONCRETE DRIVEWAY PAVEMENT SQ YD 250.00 $35.00 $8,750.00 $36.00 $9,000.00 31 1 2557.602 RELOCATE MAILBOX EACH 57.00 $35.00 $1,995.00 $100.00 $5,700.00 M: \1304- 002 \EXCEL\bidtab.xls\Bid Detail Page 5 of 8 Extension of Bids g Project: 2001 Street & Utility Reconstruction Project City of Rosemount Project No. 326 Checked By: N. Marshall Date: 06/13/01 Cost Opinion 3rd Low Bidder $1,147,455.50 $1.244.254.3111 Line No. Item Number Description Unit Estimated Quantity Cost O pinion Ran Contracting Co Unit Price Estimated Cost Unit Price Cost 32 2557.603 INSTALL CHAIN LINK FENCE LIN FT 1 150.00 $8.00 $1,200.00 $10.00 $1,500.00 33 2557.603 INSTALL WOODEN FENCE LIN FT 20.00 $10.00 $200.00 $15.00 $300.00 34 2563.601 TRAFFIC CONTROL LUMP SUM 1.00 $10,000.00 $10,000.00 $17,500.00 $17,500.00 35 2564.531 F &I SIGN PANELS TYPE C SQ FT 137.75 $20.00 $2,755.00 $20.00 $2,755.00 36 2564.602 F &I SIGN PANELS TYPE D EACH 4.00 $225.00 $900.00 $230.00 $920.00 37 2564.602 INSTALL SIGN TYPE C EACH 1.00 $100.00 $100.00 $55.00 $55.00 38 2564.602 INSTALL SIGN TYPE D EACH 1.00 $100.00 $100.00 $65.00 $65.00 39 2564.603 4" SOLID LINE WHITE -EPDXY LIN FT 3,785.00 $0.40 $1,514.00 $0.60 $2,271.00 40 2564.603 4" DOUBLE SOLID LINE YELLOW -EPDXY LIN FT 1,900.00 $0.80 $1,520.00 $1.25 $2,375.00 41 2564.603 4" DOUBLE SOLID LINE YELLOW -PAINT LIN FT 1,900.00 $0.50 $950.00 $1.00 $1,900.00 42 2564.603 12" SOLID LINE WHITE -EPDXY LIN FT 12.00 $1.00 $12.00 $8.00 $96.00 43 2564.604 ZEBRA CROSSWALK -WHITE POLY PREFORMED SQ FT 90.00 $5.00 $450.00 $14.00 $1,260.00 44 2565.603 4' NON - METALLIC CONDUIT LIN FT 300.00 $5.00 $1,500.00 $7.00 $2,100.00 45 2571.501 WHITE PINE 6' HT B &B TREE 3.00 $300.00 $900.00 $300.00 $900.00 46 2571.501 COLORADO SPRUCE 6' HT B &B TREE 3.00 $300.00 $900.00 $300.00 $900.00 47 2571.501 BLACK HILLS SPRUCE 6'HT B &B TREE 3.00 $300.00 $900.00 $300.00 $900.00 48 2571.502 AUTUMN BLAZE MAPLE 2.5" CAL B &B TREE 3.00 $300.00 $900.00 $300.00 $900.00 49 2571.502 BUR OAK 2.5" CAL B &B TREE 3.00 $300.00' $900.00 $300.00 $900.00 50 2571.505 HENRY KELSEY SHRUB ROSE, #2 CONT. SHRUB 20.00 $75.00 $1,500.00 $45.00 $900.00 51 2571.505 ISANTI DOGWOOD #5 CONT. SHRUB 20.00 $75.00 $1,500.00 $45.00 $900.00 52 2571.505 ARROWWOOD VIBURNUM #5 CONT. SHRUB 20.00 $75.00 1 $1,500.00 $45.00 $900.00 53 2571.541 TRANSPLANT TREE TREE 2.00 $300.00 $600.00 $200.00 $400.00 54 2571.544 TRANSPLANT SHRUB SHRUB 2.00 $200.00 $400.00 $25.00 $50.00 55 2573.501 BALE CHECK EACH 110.00 $5.00 $550.00 $6.00 $660.00 56 2573.502 SILT FENCE, TYPE HEAVY DUTY LIN FT 2,000.00 $3.00 $6,000.00 $2.00 $4,000.00 57 2575.501 SEEDING ACRE 2.70 $1,000.00 $2,700.00 $700.00 $1,890.00 58 2575.505 SODDING TYPE LAWN SQ YD .18,000.001 ,1 Total Schedule A $2.00 $36,000.00 $796,536.00 $2.10 $37,800.00 M: \1304- 002\EXCEL\bidtab.xls \Bid Detail Page 6 of 8 Extension of Bids n WIlEd 114 Project: 2001 Street & Utility Reconstruction Project City of Rosemount Project No. 326 Checked By: N. Marshall Date: 06/13/01 Cost Opinion 3rd Low Bidder $1,147,455.50 $1.244.254.30 Line No. Item Numb er Description Unit Estimated Quantit Cost n Ran Contractin Co Unit Price imated Cost 1$21,350.00 Unit Price Cost Schedule B - Watermaln Improvements 59 2104.501 REMOVE WATER MAIN LIN FT LIN FT E1,570.00 $7.00 $3.00 $4,710.00 $8.00 $5.00 $24,400.00 $7,850.00 60 2104.501 REMOVE WATER SERVICE PIPE 61 2104.509 REMOVE VALVE AND BOX EACH $100.00 $1,300.00 $50.00 $650.00 62 2104.509 REMOVE HYDRANT EACH 7.00 $400.00 $2,800.00 $250.00. $1,750.00 63 2104.509 REMOVE CURB STOP & BOX EACH 49.00 $50.00 $2,450.00 $50.00 $2,450.00 64 2104.606 ABANDON WATER MAIN (FILL WITH SAND) LIN FT 1,810.00 $3.00 $5,430.00 $5.00 $9,050.00 65 2504.601 TEMPORARY WATER SERVICE LUMP SUM 1.00 $15,000.00 $15,000.00 $25,000.00 $25,000.00 66 2504.602 8" GATE VALVE AND BOX EACH 14.00 $600.00 $8,400.00 $650.00 $9,100.00 67 2504.602 CONNECT TO EXISTING WATER MAIN EACH 10.00 $500.00 $5,000.00 $700.00 $7,000.00 68 2504.602 CONNECT TO EXISTING WATER SERVICE EACH 55.00 $100.00 $5,500.00 $375.00 $20,625.00 69 2504.602 3/4" CORPORATION STOP EACH 4.00 $40.00 $160.00 $70.00 $280.00 70 2504.602 1" CORPORATION STOP EACH 45.00 $50.00 $2,250.00 $90.00 $4,050.00 71 2504.602 3/4" CURB STOP & BOX EACH 4.00 $100.00 $400.00 $100.00 $400.00 72 2504.602 1" CURB STOP & BOX EACH 45.00 $100.00 $4,500.00 $120.00 $5,400.00 73 2504.602 HYDRANT ASSEMBLY EACH 9.00 $1,800.00 $16,200.00 $1,660.00 $14,940.00 74 2504.603 3/4" TYPE K COPPER PIPE LIN FT 120.00 $8.00 $960.00 $9.50 $1,140.00 75 2504.603 1" TYPE K COPPER PIPE LIN FT 1,680.00 $10.00 $16,800.00 $10.00 $16,800.00 76 2504.603 6" WATER MAIN - DUCT IRON CL 52 LIN FT 100.00 $19.00 $1,900.00 $24.00 $2,400.00 77 2504.603 8" WATER MAIN - DUCT IRON CL 52. LIN FT 5,450.00 $20.00 $109,000.00 $19.00 $103,550.00 78 2504.605 4" POLYSTYRENE INSULATION SQ YD 100.00 $20.00 $2,000.00 $16.00 $1,600.00 79 2504.620 DUCTILE IRON FITTINGS POUND 5,000.00 Total Schedule B $1.50 $7,500.00 $233,610.00 $1.25 $6,250.00 M:11304- 002 \EXCEL\bidtab.xiskBid Detail Page 7 of 8 Extension of Bids Project: 2001 Street & Utility Reconstruction Project City of Rosemount Project No. 326 Checked By: N. Marshall Date: 06/13/01 Cost Opinion 3rd Low Bidder $1,147,455.50 $1.244.254.30 Line No. Item Number Description Unit Estimated Quantit Cost Opinion Ran Contracting Co Unit Price Estimated Cost Unit Price Cost Schedule C - Storm Sewer Improvements 80 2104.501 REMOVE SEWER PIPE (STORM - ALL SIZES/TYPES) LIN FT 170.00 $5.00 $850.00 $12.00 $2,040.00 81 2104.509 REMOVE MANHOLE OR CATCH BASIN EACH 1.00 $250.00 $250.00 $300.00 $300.00 82 2104.509 REMOVE CASTING EACH 1.00 $100.00 $100.00 $100.00 $100.00 83 2105.609 GEOTEXTILE FABRIC TYPE IV SQ YD 20.00 $2.00 $40.00 $2.00 $40.00 84 2501.515 24" RC PIPE APRON W/TRASH GUARD EACH 1.00 $1,000.00 $1,000.00 $1,300.00 $1,300.00 85 2501.515 36" RC PIPE APRON W!TRASH GUARD EACH 1.00 $1,800.00 $1,800.00 $1,600.00 $1,600.00 86 2503.541 15" RC PIPE DESIGN 3006 CLASS V LIN FT 1,097.00 $21.00 $23,037.00 $23.00 $25,231.00 87 2503.541 18" RC PIPE DESIGN 3006 CLASS III LIN FT 374.00 $23.00 $8,602.00 $25.00 $9,350.00 88 2503.541 24" RC PIPE DESIGN 3006 CLASS III LIN FT 440.00 $28.00 $12,320.00 $28.00 $12,320.00 89 2503.541 36" RC PIPE DESIGN 3006 CLASS III LIN FT 452.00 $45.00 $20,340.00 $56.00 $25,312.00 90 2503.603 15" HDPE SEWER PIPE LIN FT 349.00 $18.00 $6,282.00 $20.00 $6,980.00 91 2506.501 CONST. DRAINAGE STR. DES. 48 -4020 LIN FT 51.63 $150.00 $7,744.50 $270.00 $13,940.10 92 2506.501 CONST. DRAINAGE STR. DES. 60 -4020 LIN FT 18.72 $200.00 $3,744.00 $285.00 $5,335.20 93 2506.502 CONST DRAINAGE STRUCTURE DESIGN SPEC 1 (2X3 CB) EACH 22.00 $1,100.00 $24,200.00 $1,200.00 $26,400.00 94 2506.516 CASTING ASSEMBLY EACH 14.00 $300.00 $4,200.00 $380.00 $5,320.00 95 2506.602 CONNECT TO EXISTING STORM SEWER EACH 2.00 $500.00 $1,000.00 $660.00 $1,320.00 96 2511.501 RANDOM RIP RAP CLASS IV I CU YD 30.00 $60.00 1 $1,800.00 $65.00 $1,950.00 Total Schedule C $117,309.50 $138,838.30 F and Total $1,147,455.50 -: $1,244,254.30 M 11304- 002 \EXCE0bidtab.xls \Bid Detail Page 8 of 8