Loading...
HomeMy WebLinkAbout6.k. Receive Plans & Spec's/ Authorizing Quotes for Shannon Pond Excavation City Project #331CITY OF ROSEMOUNT EXECUTIVE SUMMARY FOR ACTION CITY COUNCIL MEETING DATE: June 18, 2001 AGENDA ITEM: Receive Plans & Spec's /Authorize Receiving AGENDA SECTION: Quotes- Shannon Pond Excavation, City Project #331 Old Business PREPARED BY: Bret Weiss, interim City Engineer AGE 6 K ATTACHMENTS: Resolution APPROVED BY: /(Y� u This item was originally planned to be placed on the Utility Commission meeting for June 11, 2001, however that meeting was cancelled. In conversations with several members of the Utility Commission, they agreed to move this item forward to the City Council for authorization without referring it to the next Utility Commission meeting. The project involves excavating excess sand out of the drainage easement area to increase the storage and infiltration area of this pond. As, you are aware, with the completion of the Birger Pond Outlet and the pending construction of the Hawkins Pond Lift Station, Shannon Pond is anticipated to receive a significant volume of stormwater now and into the future. Currently this pond does not have an outlet and the water simply evaporates or percolates into the ground. We are proposing to solicit quotes from contractors that are willing to remove the material from the pond at no cost to the City of Rosemount, and hopefully restore the side slopes and provide some minimal contribution to the installation of trees or shrubs around the pond. We do have several contractors interested, however timing is important considering our desire to get this project completed now, with minimal impact to the adjacent property owners. We are proposing to utilize the quotation process for this project. The City will have out of pocket expenses of less than $50,000 and may have no out of pocket expense on this project. Because of this and because we would like to have the quotes authorized at the next meeting in July it would be difficult to receive bids in this time schedule. If the Council authorizes this project, we will contact at least four contractors to receive quotes. These quotes are similar to bids in the way they are structured and will be subject to plans and specifications. It is anticipated that we will utilize cost and the timing of the work as the selection criteria that will be brought back to the City Council for authorization. We hope to bring the quote results and a recommendation back at the July 2, 2001 meeting. RECOMMENDED ACTION.- MOTION TO ADOPT A RESOLUTION RECEIVING PLANS AND SPECIFICATIONS AND AUTHORIZING RECEIVING QUOTES FOR THE SHANNON POND EXCAVATION, CITY PROJECT #331. COUNCIL ACTION: CITY OF ROSEMOUNT DAKOTA COUNTY, MINNESOTA RESOLUTION 2001 - A RESOLUTION RECEIVING THE PLANS AND SPECIFICATIONS AND RECEIVING QUOTES FOR SHANNON POND EXCAVATION CITY PROJECT #331 WHEREAS, the City Council of the City of Rosemount have ordered the preparation of plans and specifications for Shannon Pond Excavation, City Project #331 and such plans and specifications have been presented to this Council for approval: NOW, THEREFORE, BE IT RESOLVED, by the City Council of the City of Rosemount, Minnesota: 1. Such plans and specifications are hereby approved and ordered placed on file in the office of the City Clerk. 2. Such plans and specifications shall be distributed for quotes from qualified contractors. ADOPTED this 18"' day of June, 2001. Cathy Busho, Mayor ATTEST: Linda Jentink, City Clerk Motion by: Voted in favor: Voted against: Seconded by: