Loading...
HomeMy WebLinkAbout6.k. Award Contract to Xcel Energy to Bury Overhead Power Lines on Highway 3 ProjectA CITY OF ROSEMOUNT EXECUTIVE SUMMARY FOR ACTION CITY COUNCIL REGULAR MEETING DATE: August 7, 2001 AGENDA ITEM: Award Contract to Xcel Energy to Bury Overhead Power Lines on Highway 3 AGENDA SECTION: Consent PREPARED BY: Jim Parsons AG t M 1 0 ; Q K Community Development Director ATTACHMENTS: Resolution Awarding a Contract to Xcel APPROVED BY: Energy to Bury Overhead Power Lines on Highway 3 between 145 Street and County Road 42; Contract Background Part of the Highway 3 reconstruction project downtown is to bury overhead power lines. There are about 13 lines crossing Highway 3 between 145 and Lower 147 Streets. While there are only about 3 lines crossing Highway 3 between Lower 147 Street and County Road 42, at least one of those lines is a transmission line, not just a service line for one customer. The electrical network does not have a clean break at Lower 147 Street, so to bury the lines north of Lower 147 Street, it is necessary to work south of Lower 147 Street. Xcel Energy and WS13 Associates have indicated that the burial of overhead power lines south of Lower 147 Street can be done in advance of, and independent from, the highway reconstruction work planned for this year and 2002 or 2003. That being the case, the proposed contract would bury all the overhead power lines between 145 Street and County Road 42. RECOMMENDED ACTION: MOTION to approve A RESOLUTION TO AWARD A CONTRACT TO BURY OVERHEAD POWER LINES ON HIGHWAY 3 ETWEEN 145 AND COUNTY ROAD 42 for $88,821 to Xcel Enemy to bury overhead power lines.. CITY COUNCIL ACTION: CITY OF ROSEMOUNT DAKOTA COUNTY, MINNESOTA RESOLUTION 2001— A RESOLUTION TO AWARD A CONTRACT TO BURY OVERHEAD POWER LINES ON HIGHWAY 3 BETWEEN 145 AND COUNTY ROAD 42 BE IT RESOLVED, by the City Council of the City of Rosemount, Minnesota, as follows: 1. The bid listed below in the specified amount for the construction of certain improvements is in accordance with the plans and specifications. The contract is hereby awarded. Type of Work Contractor's Name Amount Burial of overhead power lines Xcel Energy $88,821.00 2. The Mayor and Clerk are hereby authorized and directed to enter into a contract with the bidder for the construction of said improvements for and on behalf of the City of Rosemount. ADOPTED this 7th day of August, 2001. ATTEST: Linda Jentink, City Clerk Motion: Voted in favor: Voted against: Members absent: v Cathy Busho, Mayor Second: i E AUG -01 -2001 14:25 WSB & ASSOCIATES STATEMENT OF WORK REQUESTED Fore 17 -7012 (1-00) MP INC. 7635411700 P.02i02 r Northern States Power Company DATE: 124 2000 WORK REQUESTED BY CITY OF ROSEMOUNT WORK TO BE AT TH 3 ENHANCEMENT PROD (WSB PROD #1191-003) ADDRESS 2875145TH ST W, ROSEMOUNT, MN. 55068 ATTIT TOM BURT CONSISTING OF: REMOVE ALL OF THE OLD WOOD POLES AND CIRCUITRY ALONG THE PROJECT CORRIDOR AND REPLACE WITH EQUIVALENT UNDERGROUND CIRCUITS, TRANSFORMERS, TERMINATIONS AND LABOR. THERE IS NO RESTORATION COST INCLUDED IN THIS PRICE FOR ANY OF THE PUBLIC RIGHT -OF -WAY AREAS, THERE IS RESTORATION COST ASSOCIATED TO XCEL ENERGY RESPONSIBLITIES ON PRIVATE PROPERTY. IT IS ASSUMED THAT THAT CITY PROJECT WITH ALLOW XCEL ENERGY ADEQUATE TIME AND WILL PROVIDE ADEQUATE SPACE IN WHICH TO INSTALL rrS FACILITIES. IT IS ASSUMED THAT NEW CONST SURFACES WILL BE INSTALLED ONLY AFTER XCEL ENERGY IS ABLE TO INSTALL ITS FACILITIES OR BE PROVIDED CONDUITS UNDER SURFACES WHOSE CONST CAN NOT DELAYED. PROJECT COVERS HWY 3 FROM SOUTH SIDE OF 145TH ST W, SOUTH TO THE SOUTH SIDE OF 150TH ST W. THIS-PROPOSAL ALSO ASSUMES THAT CITY OF ROSEMOUNT WILL PROVIDE FOR THE UNDERGROUNDING REQUIREMENTS OF ALL PRIVATELY OWNED ELECTRIC SERVICES WHICH IS ESSENTIAL IF ALL POLES ARE TO BE REMOVED. DEC 11. 2000 C '' 1 -Y 0; a : ' J ► - i The facilities installed or removed by the Company shall be the property of the Company and any payment by customer shall not entitle customer to any ownership interest or right therein. The undersigned hereby requests and authorizes the NORTHERN STATES COMPANY to do the work described and in consideration thereof, agrees to pay EIGHTY EIGHT THOUSAND NINE HUNDRED TWENTY ONE (3 88,821.00 ), in accordance with the following terms: TO 8E BILLED BY INVOICE AFTER COMPLETION OF PROJECT Credit Approval DWS Receipt of the above amount hereby acknowledged on behalf of NSP by NORTHERN STATES POWER COMPANY Customer CITY OF ROSEMOUNT BY 9446U BY NSP Representative DAN SCHULTZ Division 1211 IR# 7022 NSP Proj. No. TH03 -RMT Const. S 87AV -00 Rem. S 1,494.00 MainL S 0.00 Oper. S (Loo Transf. S Total S 88.921.00 ORIGINAL - DIVISION ACCOUNTING COPY — CUSTOMER COPY— DIVISION DISTRIBUTION ENGINEEMNG TnrT01 P R7 TP,Tl11 0 n1n