HomeMy WebLinkAbout6.k. Award Contract to Xcel Energy to Bury Overhead Power Lines on Highway 3 ProjectA
CITY OF ROSEMOUNT
EXECUTIVE SUMMARY FOR ACTION
CITY COUNCIL REGULAR MEETING DATE: August 7, 2001
AGENDA ITEM: Award Contract to Xcel Energy to Bury
Overhead Power Lines on Highway 3
AGENDA SECTION:
Consent
PREPARED BY: Jim Parsons
AG t M 1 0 ; Q K
Community Development Director
ATTACHMENTS: Resolution Awarding a Contract to Xcel
APPROVED BY:
Energy to Bury Overhead Power Lines on Highway 3 between 145
Street and County Road 42; Contract
Background
Part of the Highway 3 reconstruction project downtown is to bury overhead power lines. There
are about 13 lines crossing Highway 3 between 145 and Lower 147 Streets. While there are
only about 3 lines crossing Highway 3 between Lower 147 Street and County Road 42, at least
one of those lines is a transmission line, not just a service line for one customer. The electrical
network does not have a clean break at Lower 147 Street, so to bury the lines north of Lower
147 Street, it is necessary to work south of Lower 147 Street. Xcel Energy and WS13
Associates have indicated that the burial of overhead power lines south of Lower 147 Street can
be done in advance of, and independent from, the highway reconstruction work planned for this
year and 2002 or 2003. That being the case, the proposed contract would bury all the overhead
power lines between 145 Street and County Road 42.
RECOMMENDED ACTION:
MOTION to approve A RESOLUTION TO AWARD A CONTRACT TO BURY OVERHEAD
POWER LINES ON HIGHWAY 3 ETWEEN 145 AND COUNTY ROAD 42 for $88,821
to Xcel Enemy to bury overhead power lines..
CITY COUNCIL ACTION:
CITY OF ROSEMOUNT
DAKOTA COUNTY, MINNESOTA
RESOLUTION 2001—
A RESOLUTION TO AWARD A CONTRACT
TO BURY OVERHEAD POWER LINES
ON HIGHWAY 3 BETWEEN 145 AND COUNTY ROAD 42
BE IT RESOLVED, by the City Council of the City of Rosemount, Minnesota, as follows:
1. The bid listed below in the specified amount for the construction of certain improvements is in
accordance with the plans and specifications. The contract is hereby awarded.
Type of Work Contractor's Name Amount
Burial of overhead power lines Xcel Energy $88,821.00
2. The Mayor and Clerk are hereby authorized and directed to enter into a contract with the bidder for
the construction of said improvements for and on behalf of the City of Rosemount.
ADOPTED this 7th day of August, 2001.
ATTEST:
Linda Jentink, City Clerk
Motion:
Voted in favor:
Voted against:
Members absent:
v
Cathy Busho, Mayor
Second:
i
E
AUG -01 -2001 14:25 WSB & ASSOCIATES
STATEMENT OF WORK REQUESTED
Fore 17 -7012 (1-00)
MP
INC.
7635411700 P.02i02 r
Northern States Power Company
DATE: 124 2000
WORK REQUESTED BY CITY OF ROSEMOUNT
WORK TO BE AT TH 3 ENHANCEMENT PROD (WSB PROD #1191-003)
ADDRESS 2875145TH ST W,
ROSEMOUNT, MN. 55068 ATTIT TOM BURT
CONSISTING OF: REMOVE ALL OF THE OLD WOOD POLES AND CIRCUITRY ALONG THE PROJECT CORRIDOR AND
REPLACE WITH EQUIVALENT UNDERGROUND CIRCUITS, TRANSFORMERS, TERMINATIONS AND LABOR. THERE IS NO
RESTORATION COST INCLUDED IN THIS PRICE FOR ANY OF THE PUBLIC RIGHT -OF -WAY AREAS, THERE IS RESTORATION
COST ASSOCIATED TO XCEL ENERGY RESPONSIBLITIES ON PRIVATE PROPERTY. IT IS ASSUMED THAT THAT CITY
PROJECT WITH ALLOW XCEL ENERGY ADEQUATE TIME AND WILL PROVIDE ADEQUATE SPACE IN WHICH TO INSTALL rrS
FACILITIES. IT IS ASSUMED THAT NEW CONST SURFACES WILL BE INSTALLED ONLY AFTER XCEL ENERGY IS ABLE TO
INSTALL ITS FACILITIES OR BE PROVIDED CONDUITS UNDER SURFACES WHOSE CONST CAN NOT DELAYED. PROJECT
COVERS HWY 3 FROM SOUTH SIDE OF 145TH ST W, SOUTH TO THE SOUTH SIDE OF 150TH ST W. THIS-PROPOSAL ALSO
ASSUMES THAT CITY OF ROSEMOUNT WILL PROVIDE FOR THE UNDERGROUNDING REQUIREMENTS OF ALL PRIVATELY
OWNED ELECTRIC SERVICES WHICH IS ESSENTIAL IF ALL POLES ARE TO BE REMOVED.
DEC 11. 2000
C '' 1 -Y 0; a : ' J ► - i
The facilities installed or removed by the Company shall be the property of the Company and any payment by customer
shall not entitle customer to any ownership interest or right therein.
The undersigned hereby requests and authorizes the NORTHERN STATES COMPANY to do the work described
and in consideration thereof, agrees to pay EIGHTY EIGHT THOUSAND NINE HUNDRED TWENTY ONE
(3 88,821.00 ), in accordance with the following terms: TO 8E BILLED BY INVOICE AFTER
COMPLETION OF PROJECT Credit Approval DWS
Receipt of the above amount hereby acknowledged on behalf of NSP by
NORTHERN STATES POWER COMPANY Customer CITY OF ROSEMOUNT
BY 9446U BY
NSP Representative DAN SCHULTZ Division 1211 IR# 7022 NSP Proj. No. TH03 -RMT
Const. S 87AV -00 Rem. S 1,494.00 MainL S 0.00 Oper. S (Loo Transf. S Total S 88.921.00