Loading...
HomeMy WebLinkAbout6.h. Receive Bids/Award Contract - Hawkins Pond Lift Station, City Project #328CITY OF ROSEMOUNT EXECUTIVE SUMMARY FOR ACTION CITY COUNCIL MEETING DATE: August 7, 2001 AGENDA ITEM: Receive Bids /Award Contract - Hawkins Pond AGENDA SECTION: Lift Station, City Project #328 Consent PREPARED BY: Bret Weiss, Interim City Engineer AGEND 9SIN ­ b- M ATTACHMENTS: Resolution, Bid Tabulation APPROVED BY: 0 . On Wednesday, August 1, 2001, bids for the referenced project were received and read aloud publicly. Five (5) bids were received on the project. The apparent low bidder for the project is S.M. Hentges & Sons, Inc. of Jordan, MN in the amount of $246,865. The bids ranged from the low bid to a high bid of $335,304.50 and the Engineer's Estimate was $225,000. The Feasibility Report included a construction cost of $237,300. The bid is within 10% of the engineer's estimate and 4% of the feasibility report. Considering the current bidding climate, we would recommend award of the contract to S.M. Hentges in the amount of $246,865. RECOMMENDED ACTION: MOTION TO ADOPT A RESOLUTION RECEIVING BIDS AND AWARDING CONTRACT FOR HAWKINS POND LIFT STATION, CITY PROJECT #328 COUNCIL ACTION: 2 _ CITY OF ROSEMOUNT DAKOTA COUNTY, MINNESOTA RESOLUTION 2001— A RESOLUTION RECEIVING BIDS AND AWARDING CONTRACT FOR HAWKINS POND LIFT STATION CITY PROJECT #328 BE IT RESOLVED, by the City Council of the City of Rosemount, Minnesota, as follows: 1. All bids on construction of the Hawkins Pond Lift Station are hereby received and tabulated. 2. The bid of S. M. Hentges and Sons, Inc., in the amount of $246,865 for the construction of said improvements are in accordance with the plans and specifications and advertisement for bids is the lowest responsible bid and shall be and hereby is accepted. 3. The Mayor and Clerk are hereby authorized and directed to enter into a contract with said bidder for the construction of said improvements for and on behalf of the City of Rosemount. 4. The City Clerk is hereby authorized and directed to return forthwith to all bidders the deposits made with their bids, except that the deposit of all successful bidder and the next two lowest bidders shall be retained until a contract has been executed. ADOPTED this 7 th day of August, 2001. Cathy Busho, Mayor ATTEST: Linda Jentink, City Clerk Motion by: Voted in favor: Seconded by: Voted against: 1'ugu I of _' Bidders List Client: Rosemount MN 01324 -00 Contractor Count: 26 Bid Date: 8/l/01 Project Descr: Hawkins Pond Lift Station Project Engineer: Marl: A Erichson Bid Time: 10:00 And Foreemainn Feasibility Shiny Engineer's Estimate! $225,000.00 Wednesday, August 01, 2001 8:06:57 AM Contractor Bid Bond 5' %o Addendum O Total Base Bid Barbarossa & Sons, Inc. CCs Contracting Davies Water Equipment Electric Pump Electrical Installation & Maintenance F. F, Jedlicki, Inc. °°'"� i . ' 35 3o ford COnstrnctlon, Inc. FriedgesContracting Co., LLC 1lawkeye Underground IIeselton Construction, LLC. Inland Utility Construction, Inc. Kober Excavating Lametti & Sons, Inc. '7 Midwest Rebar & Culvert Minnesota Pipe & Equipment Motzko Companies, Inc, Municipal Contracting Services �° I 3Z 1.0 ZG Nortlidale Construction, Inca V I�Z 'ZC1 3 Z9(a.y(o Parrott Contracting, Inc. 0 lnttp:// wsb3/ RtCivil /l)li_EngBidder.asp' ?WorkOrderld -374 8/1/01 I 1: c _ U I - Penn Contracting, Inc. Quality Flow Systems, Inc. Richard Knutson, Inc. Ryan Contracting Co. S. M. Hentges & Sons, Inc. US Filter Distribution Group W. W. Goetsch Associates, Inc. 0 if tip : / /wsb3 /RtCivil /pli_CngBicider .asp' ?WorkOrderlcl =374 8/1/01