Loading...
HomeMy WebLinkAbout2.a. City Hall Remodel UpdateCITY OF ROSEMOUNT EXECUTIVE SUMMARY FOR DISCUSSION COMMITTEE OF THE WHOLE DATE: FEB. 14 2001 AGENDA ITEM: City Hall Re- Modeling AGENDA SECTION: Discussion . PREPARED BY: Jim Parsons AGENDA NO. Community Development Director 2.A. ATTACHMENTS: Floor Plans; Budget Work Sheet and APPROVED BY: Construction Cost Break -down; Project Schedule Background Staff and consultants will present the current plan for the city hall remodeling project. Todd Christoferson from Amcon is the construction manager for the project; Bob Vanney from Vanney Associates is the architect. They and staff have explored the various components of the project with vendors for such systems as heating, power, security, etc. The estimated cost of the project is $3,128,079. The project would start May 15 and end on Nov. 29 of this year. The benefits of the project include a new Council chamber equipped for cable - casting; greater space for the Police Department on the lower level; and additional office area for the Finance, Administration, Community Development and Public Works Departments on the upper level. Staff is seeking further Council direction on this proposed project. RECD None. COMMITTEE ACTION: MEMORANDUM DATE: February 9, 2001 TO: Thomas D. Burt, City Administrator FROM: Jeff May, Finance Director SUBJECT: City Hall Remodeling/Expansion In looking at the funding for the City Hall remodeling/expansion, there are a few factors that should be considered before proceeding: 1) There are 2 years of debt currently left to pay on the original City Hall bonds Year 2001 - $138,870 (2/1 P &I Payment & 8/1 Interest Payment) Year 2002 - $138,038 (2/1 Final P &I Payment — Taxes Collected in 2001) 2) There is current and future funding built into the Building CIP Fund that could be used for the remodeling: Prior Years - $60,000 donated for cable setup in the Council Chambers Year 2000 - $ 39 for City Hall Improvements unexpended in 2000 Year 2001 $160,000 for Lease - Purchase Payments on City Hall Improvements Years 2002 & On - $180,000 for City Hall Lease - Purchase Payments 3) We are looking at issuing Lease Revenue (L/R) Bonds to fund the remodeling. As of 2/7/01, 15 -Year L/R Bonds were estimated to be issued at 4.95% and 20 -Year L/R Bonds were estimated to be issued at 5.20 %. 4) The total cost of the remodeling /expansion is estimated at $3,000,000 (original estimate - $2,000,000). 5) Annual payments on 15 -year financing would be approximately $320,000 per year and on 20 -year financing would be approximately $270,000 if the whole $3,000,000 was financed. Those payments could be lowered if a portion of the total cost was bought down. This has been discussed by using water, sewer and storm water utility funds to contribute towards the cost of the remodeling. Another possibility would be to use General Fund reserves to buy down the total. When this was discussed last year our estimate was about $2,000,000 and we had talked about buying down $500,000 of the total to finance a total of $1,500,000. This is where we came up with the $180,000 per year that we budgeted in the Building CIP ($1,500,000 at 15- years). We have asked Springsteds, our financial consultants, to run us some additional scenarios now looking at buying down the $3,000,000 total and extending the term of the lease to 20 -years as well as the 15- years. City Hall Remodeling/Expansion - Page 2 At this point there are different financing options that are available in proceeding with this project. In giving these options, I am making the assumption that we are going to do our best at minimizing the impact on the taxpayers. In making these assumptions I am also going to assume that the Water Utility Fund, Sewer Utility Fund and the Storm Water Utility Fund would all contribute funds one time ($100,000 each in the $500,000 buydown and $200,000,200,000 and 100,000 in the $1,000,000 buydown) and the General Fund would contribute funds as well ($200,000 in the $500,000 buydown and $500,000 in the $1,000,000 buydown) to the cost of the remodeling reducing the total financing needed. 1) The first option would be to issue the total $3,000,000 and have the levies be at $320,000 per year for 15 -years or $270,000 for 20 -years as discussed on the previous page. The years 2002 and beyond payments would be made as part of the Building CIP Fund budget and would increase the taxes for only the difference between the lease - purchase payments and the $138,000 that we levied in 2000 for the final 2001 collection (2/1/2002 payment) for the original City Hall bonds. This is because the original bond issue for the City Hall would be paid off and replaced by the levy for the remodeling. This option would have the greatest impact as far as taxes that I can see. Also, we could look at the Water Utility Fund and Sewer Utility Fund each contributing a yearly amount if they do not contribute a lump sump payment up front (much like the Public Works building expansion project). 2) The second option would be to buy down $500,000 of the total debt (breakdown described above) issuing a total of $2,500,000. The levies for $2,500,000 would be at approximately $270,000 per year for 15 -years or $225,000 per year for 20- years. Under this option the Building CIP would make the total payments because of the upfront contributions of the utility funds. 3) The third option would be to buy down $1,000,000 of the total debt (breakdown described above) issuing a total of $2,000,000. The levies for $2,000,000 would be at approximately $220,000 per year for 15 -years or $180,000 per year for 20- years. Under this option the Building CIP would make the total payments because of the upfront contributions of the utility funds. At this point in time, it would appear to me that Option #3 above would be our best choice. We would finance $2,000,000 to complete the work, issuing the debt mid -2001 with the first payment coming in February, 2002 using funds levied in 2001 and collected in 2002. Years 2003 and beyond payments would be from Building CIP levies that will be made that replace the original City Hall bond issue. We had originally planned/budgeted for $180,000 in annual levies to do this project. With this buydown, even with the increased cost, we can still meet this goal with the 20 -year financing. Using $200,000 to $500,000 of General Fund reserves will still allow us to maintain a healthy fund balance. At this time we anticipate that after final year -end adjustments that the General Fund balance will increase by $300,000 to $600,000. At the end of 1999 our fund balance was at approximately 58% of our next year's budget. So with the buydown we should not decrease that number at all. Our goal has been to get back to at least City Hall Remodeling/Expansion — Page 3 50 %, which we did last year. Even with this buydown we may want to look at using other funds to pay the difference between the 15 -year and 20 -year financing to decrease the length of the debt. One source that we could possibly use to accomplish this would be a portion of the SKB user fees. Right now we earmark $50,000 per year of this money to the Street CIP for annual street overlay projects. We have been collecting more than that each year and we could utilize those additional funds to help make the payments on the building if the Council so chose. Either way, the taxes should increase minimally for the citizens because of the remodeling/expansion project. Rosemount City Hall Expansion Remodeling Budget Work Sheet Funding Source City of Rosemount Expenditures Total A/E Base Fee Vanney Associates A/E Reimbursables Vanney Associates AN consultant Mark Moore Land Costs 2,317,229 Legal Fees $3,128,079 Financing Costs 0 City Road & Utility Fees Public Utility charges Geotechnical Services Allied Surveying WSB Bid Advertisement and Printing Vanney Associates Construction Testing Sub - totals Furniture Systems Audio visual Systems Security and Access Systems Telephone System Computer Network Paula Graff Mark Moore Videotronix Frontier CIT Sub - totals Budget 3,128,079 3,128,0791 Budget 229,150 10,000 0 0 5,000 0 0 0 2,500 1,500 40,000 3,500 291,650 250,000 90,000 80,000 10,000 35,200 465,200 Temporary Move Expenses Trailer Rental (including Furniture) Temporary Utilities Temporary Computer Network CIT Temporary Telephone System Frontier Moving Company Sub- totals Construction Cost Construction Hard Costs Construction Manager Fee Contingency Uncommited Funds 20,000 8,000 15,000 5,000 6,000 54,000 Contractors (to be bid) 1,997,229 Amcon CM 70,000 250,000 Sub - totals 2,317,229 Totals $3,128,079 (Fund Shortage) 0 2/9/01 AMCON CM RM City Hall est email version.xis Total Project Cost £0'd - 1i101 Rosemount City Hall Expansion Remodeling Construction COST ESTIMATE 21712001 AWIIICON CM £0'd t7900 068 Z19 NWWOD tOIlOfIb1SN00 NO:)WU RosWWA City Nan Est. CoW Cost Est Swmary SZ:80 t002- LO -83d PROJECT DATA Duration (Months) 6.00 Total Building Area 24,909 CONSTRUCTION COST BREAKDOWN Item Cost Cost1SF General Conditions 111,994 4.50 Demolftion 52,088 2.09 Concrete 117,166 4.71 Masonry 99,236 3.99 Metals 70,676 2.84 Carpentry, Rough & Finish 135,405 5.44 Roofing, Insulation, Caulking - 120,691 4.85 HM Doors, Frames, Hardware 33,151 1.33 Glass/Glazing, mirrors 24,705 0.99 Overhead, coiling doors 21,650 0.87 Metal StudstGyp/Plaster 72,014 2.89 Finishes 157,874 6.34 Visual Display Boards 1,000 0.04 Signs 1,500 0.06 Lockers 13,750 0.55 Specialties 11,750 0.47 Mechanical 502,700 20.19 Temp. Controls 36,355 1.46 Electrical 344,865 13.85 Miscellaneous 0 0.00 Sub - Total Cost Estimate $1,928,580 77.45 Site Improvements 68,649 2.76 Total Cost Estimate $1,997,229 $80.21 AWIIICON CM £0'd t7900 068 Z19 NWWOD tOIlOfIb1SN00 NO:)WU RosWWA City Nan Est. CoW Cost Est Swmary SZ:80 t002- LO -83d s� 6 i am r U L D N rn o�| TU ��.. .,...... . . y | _ _ . § cl o \ o 2 | o� . a | � ■ §$ f |$ |, 2| | | � n ■` r =Eq 8 m a :i a a u is 'o o G .� e G • u a p ;v'' _ 3 O O$ z Or. i : n i c S s i r.r �w e 2 S` a ' 3 /Y O IL OO ui N � G � V � NNV � N M OO � � •�C p � O � .`� Y OJOeG • iS a ■ NP � M N W Y' 1e - � Y! M k Y' W N � w � � V y' N N i i� o a- a a - - - a a -; a Z J � 1 m -1 i -i r i r S s i �i C , N g B 3 a�I 3 v g e 2 p T tl i � Y Y Y o 9 v � � � n a 3 b O. 7 /// 3 3 i�