Loading...
HomeMy WebLinkAbout6.k. Payment #7 and Final for Conley Ave. Improvements, City Project #3031k7 CITY OF ROSEMOUNT EXECUTIVE SUMMARY FOR ACTION CITY COUNCIL MEETING DATE: January 16, 2001 AGENDA ITEM: Payment # 7 and Final for Conley Avenue Street and Utility Construction and Appurtenant Work AGENDA SECTION: Consent PREPARED BY: Rich Lonnquist , Senior Engineering Technician AGENDA NO: ffM 6 ATTACHMENTS: Payment Voucher #7 and Final APPROVED BY: v This item is for the 7' and Final payment to Richard Knutson, Inc. in the amount of $72,871.85 for City project # 303, Conley Avenue Street and Utility Construction and Appurtenant Work. The original contract amount was $1,349,116.27. The total construction cost is $1,239,778.91 which is 9% under the construction contract amount. Work completed and represented in this payment as of December 5` 2000 is 100% of the contracted work. The work has been inspected and is in compliance with the contract documents. Attached is a copy of the Construction Pay Voucher 7 and Final for your information. Staff and WS13 recommend approval of this final payment request and acceptance of the streets and utilities for perpetual maintenance. Upon final payment, a two year warranty period will beujn on the streets and utilities. RECOMMENDED ACTION: Motion to Approve payment #7 and Final to Richard Knutson Inc. in the amount of $72,871.85 for Conley Avenue Street and Utility Construction and Appurtenant Work, City Project # 303 t WSB & Associates, Inc. December 5, 2000 8441 Wayzata Boulevard, Suite 350 Minneapolis, MN 55426 tel: 763 - 541 -4800 fax: 763 - 541 -1700 'DEC B.A. blittelstea& PE Bret A. W eiss PX- Peter R. Willenbrin. Pte. Donald W. sterna. PE Ronald B. Bray. Pl- I Honorable Mayor and City Council City of Rosemount 2875 145`' Street West Rosemount, MN 55068 Re: Final Construction Pay Voucher No. 7 Conley Avenue Street & Utility Construction and Appurtenant Work City Project No. 303 WSB Project No. 1148.21 Dear Mayor and Council Members: Please find enclosed the Final Construction Pay Voucher for the referenced project in the amount of $72,871.85. We recommend final payment subject to receipt of the following items: 1) Satisfactory showing that the contractor has complied with the provisions of Minnesota Statutes 290.92 requiring withholding state income tax and; 2) Evidence in the form of an affidavit that all claims against the contractor by reasons of the contract have been fully paid or satisfactorily secured. 3) Consent of Surety to Final Payment certification from the contractor's surety. Please make payment in this amount to Richard Knutson, Inc. at your earliest convenience. Sincerely, WSB & Associates, Inc. Bret A. Weiss, P.E. President Enclosures c: Rich Lonnquist, City of Rosemount Sheri Jo Boyum, Richard Knutson, Inc. run Minneapolis - St. Cloud Infrastructure Engineers Planners EOUAL OPPORTUNITY EMPLOYER F. WPWrAJ14&21tw7 -&..pc :. ' - .s '� ...- �1 .,., � .:.�,..� ...... Corrstrpction PayVaucher .. ,• �`, � � Voucher No: 7 (FINAL) Date: December 5, 2000 Project: Conley Avenue Street & Utility Construction and Appurtenant Work Project No: CP 303 Period Ending: November 30, 2000 S.P. 1906 -44 WSB Project No. 1148.21 Contractor Richard Knutson, Inc. 12585 Rhode Island Avenue South Savage, MN 55378 Contract Date: 4- Aug -99 Work Started: Completion Date: Work Completed: Original Contract Amount $1,329,607.35 Total Additions $19,508.92 Total Deductions Total Funds Encumbered $1,349,116.27 Total Work Certified to Date $1,239,778.91 Less Retained Percentage 0.00% $0.00 Less Previous Payments $1,166,907.06 Total Payments Incl. This Voucher $1,239,778.91 Balance Carried Forward $109,337.36 Approved for Payment This Voucher $72,871.85 Approvals WSB & Associates, Inc. In accordance with field observation, as performed in accordance with industry standards, and based on our professional opinion, the materials installed are satisfactory and the work properly performed in accordance with the plans and specifications. The total work estimated to be completed as of November 30, 2000 is as indicated herein and we hereby recommend 100% payment of this voucher. Signed: Signed: Construction Observer Project Manager /Engineer Richard Knutson, Inc. This is to certify that to the best of my knowledge, information, and belief, the quantities and values of work certified herein is a fair approximate estimate for the period covered by this voucher. Contractor. Date: Date: _ ` // 6) Title: City of Rosemount Checked by: Date: Approved for Payment: Authorized Representative Date: MA1148.2101ExceWou&* rs-ds Voucher Detail List roe i y ons ruc ion and Appurt Work City of Rosemount Project No. 303 S.P. 1906 -44 WSB Project No. 1148.21 By: N. Marshall Date: 12/05/00 Voucher No. 7 (Final) M: 1148- 21U1EXCELIV000Ixfrs.xls1VOJ Contract Contract Completed This Month Total To Date Line Item Line Unit Unit Price Quantity Total $ Quantity Total $ Quantity Total $ No. Number Description No. 1 2021.501 MOB I LI ZATION LUMPSUM $13,500.00 1.00 $13, 0.00 $0.00 1.00 $13,500.00 1 2 2101.501 CLEARING ACRE $10,000.00 0.06 $ 0.00 $0,00 0.06 $600.00 2 3 2101,602 CLEARING TREE $70.00 3.00 $210.00 0.00 $0.00 3.00 $210.00 3 4 2101.506 GRUBBING ACRE $10,000.00 0.06 $ 600.00 0.00 $0.00 0.06 $800.00 4 5 2101.5 GRUBBING TREE $30.0 3.00 $90.00 0.00 $0.00 3.00 $90.00 5 6 2102.501 PAVEMENT MARK REMOV - PERM SO FT $1.50 70.00 $105.00 0.00 $0.00 50.00 $75.00 6 7 2102.502 PAVEMENT MARKING REMOVAL - PERMANENT LIN FT $0.50 1494.00 $ 0.00 $0.00 1200.00 $600.00 7 - 6 - 2104.501 REMO PIPE CULVERT (ALL SI ZES) - LIN FT $6.0 390.00 $ 2,340.00 60.0 $ 587.00 $3,522.00 8 9 2104.501 REMOVE SEWER PIPE (SANITARY) LIN FT $5.00 10.00 $50.00 0.00 $0.00 13.00 $65.00 9 10 __._. 2104.501 _ __-- REMOVE WATER MAIN (ALL SIZES) - -- --- - ---- -- - - - --- LIN FT _. -- -- $4.00 165.00 $ 660,00 0.00 $0.00 158.00 $632.00 10 11 2104.505 REMOVE CONCRE PAV SO YD $10.00 - - - -- 17.00 $170.00 - -- 0.00 $0.00 20.00 $200.00 11 12 2104.505 REMOVE BITUMINOUS PAVEMENT - - SO YD $1,35 6210.00 $8,383.50 256.00 $345.60 4749.00 $6,411.15 12 13 2104.509 REMOVE VALVE BOX EACH $100 1.00 $ 100.00 0.00 $0,00 1.00 $10 13 14 2104.511 SAWING CONCRETE PAVEMENT (FULL DEPTH) LIN FT $3.00 25.00 $75.00 0.00 $0.00 25.00 $75.00 14 15 2104.513 SAWING BIT PAVEMENT (FULL DEPTH) LIN FT $2.50 2790.00 $6,975.00 115.00 $287.50 139.00 $347.50 15 16 2104.523 SALVAGE SIGN EACH $20.00 14.00 $ 0.00 $0.00 12.00 $240.00 16 17 2105.501 COMMON EXCAVATI CU YD $0.95 70550.00 $67,022.50 240.00 $228.00 73683.00 $69,998.85 17 18 2105.507 SUBGRADE EXCAVATION CU YD $0.95 4470.00 $4,246.50 0.00 $0.00 4573.00 $4,344.35 18 19 2105.515 UNCLASSIFIED EXCAVATION (POND NO'S 1 -4 EXCAVATION) CU YD $1.15 52560.00 $60,444.00 2383.00 $2,740.45 46247.00 $53,184.05 19 20 2105.601 EXCAVATION SPECIAL 1 (EXPLORATORY EXCAVATION) LUMPSUM $150.00 1.00 $150.00 0.00 $0.00 2.00 $300.00 20 21 2105.609 GE OTEXTILE FABRIC TYPE N SQ YD $1.40 $7.60 638.60 $894.04 0.00 $0.00 452.20 $633.08 21 22 - 2211.501 AG B ASE CL A S S 5 (100% CR R TO N 11010.00 $83,676.00 0.00 $0.00 9888.83 $75,155.11 22 23 2221.501 AGGRE SHOULDERIN CLASS 5 MOD TON $12.00 125.00 $1,500.00 0.00 $0.00 0.00 $0.00 23 24 2350.609 TYPE MV 3 WEARING COURSE MIXTURE TON $25.50 2125.00 $54,187.50 0.00 $0.00 1951.71 $49,768.61 24 25 2350.609 TYPE MV 3NON- WEARING CO MIXTURE _ - TON $23.25 2125.00 $ 0 .00 $0.00 2113.00 $49,127.25 25 26 2350.609 TYPE MV 2 NON WEARING COURSE MIXTURE TON $22.50 2300.00 $51,750.00 0.00 $0.00 2755.64 $62,001.90 26 27 2357.502 BITUMINOUS MATERIAL FOR TACK COAT GALLON $1,25 1855.00 $2,318.75 2104.00 $2,830.00 27 0.00 $0.00 28 2451.802 AGGREGATE FOUNDATION TON $5.00 200.00 $1,000.00 0.00 $0.00 $0.00 26 0.00 29 2501.511 15' CS PIPE CULVERT 14 GAUGE LIN FT $20.00 25.00 $500.00 0.00 $0.00 25.00 $500.00 29 30 2501.515 16" CS PIPE APRON EACH $175.00 2.00 $350.00 0.00 $0.00 2.00 $350.00 30 31 2501.515 15" RC PIPE APRON WI GU ARD EACH $508.3 1.00 $506.32 0.00 $0.00 1.00 $508.32 31 32 2501.515 18" RC PIPE APRON WITRASH GUARD EACH $557.30 3.00 $1,671.90 0.00 $0.00 3.00 $1,671.90 32 33 2501.515 24" RC PIPE APRON W/TRASH GUARD EACH $876.67 2.00 $1,753.34 2.00 $1,753.34 2.00 $1,753.34 33 34 2501.515 30" RC PIPE APRON W/TRASH GU ARD EACH $1,109.49 2.00 $2,218.98 0.00 $0.00 2.00 $2,218.98 34 35 2501.515 54" RC PIPE APRON WITRASH GUARD & SHEET PILE END _ SECTIO EACH $3,828.14 2.00 $7,656.28 0.00 $0.00 2.00 $7,656.28 35 36 2503.541 15" RC PIPE SEWER DE SIGN 3006 CL V LIN FT $17.80 1897.00 $33,766.60 0.00 $0.00 1942.00 $34,567.60 36 37 2503.541 _ 18" RC PIPE SEWE DESIGN 3006 CL III LIN F $19.61 768.00 $15,060.48 0.00 $0.00 773.00 $15,158.53 37 38 2503.541 2 1" RC PIPE SEWER DESIGN 3006 CL III LIN FT $21.82 89.00 $ 0.00 $0.00 89.00 $ 1,941.98 38 39 2503.541 21" RC PIPE SEWER D ESIGN 30 CL V - -- LIN FT $22.90 - 611.00 $13,991.90 0.00 $0.00 611.00 $13,991.90 39 40 2503.541 24" RC PIPE SEWER DESIGN 3006 CL IV - -- LIN FT $26.05 571.00 $14,874.55 0.00 $0.00 571.00 - $14,874.55 40 M: 1148- 21U1EXCELIV000Ixfrs.xls1VOJ V Conley Avenue Street & Utility Construction and Appurtenant Work By: •N. Marshall City of Rosemount Project No. 303 Date: 12/05/00 S.P. 1906 -44 Voucher No. 7 (Final) WSB Project No. 1146.21 IV M AI 14 8-21 o1EXr_EL%Voudwrsx1MVO4 Contract Contract Completed This Month Total To Date Line Item Line Unit Unit Price Quantity Total $ Quantity Total $ Quantity Total $ No. Number Description No. 41 2503.541 27" RC PIPE SEWER DESIGN 3006 CL II LIN FT $29.40 352.00 $10,348.80 0.00 $0.00 340.00 $9,996.00 41 42 2503.541 27" RC PIPE S EWER DESIGN 3006 CL III - LIN FT $34.10 239.00 $8,149.90 0.00 $0.00 239.00 $8,149.90 42 43 2503 64" RC PIPE S EWER DE SIGN 3006 CL 11 - - - LIN FT $ 86.29 1246.00 $ 107,517.34 0.00 $0.00 1255.00 $ 108, 29 3.95 43 44 2503 602 AIR RELIEF MANHOLE EACH $1,729.58 1.00 $1,729.58 0.00 $0.00 1.00 $ 44 45 2503 602 CO N N ECT TO E MA NHOLES ( SAN) EACH $ 441.00 1.00 $441.00 0.00 $0.00 1.00 $441.00 45 46 2503.603 24" CORRUGAT PE PIPE SEWER LIN FT $18.32 56.00 $1,025.92 0.00 $0.00 0.00 $0.00 46 47 2503.603 30" CORRUGATED PE PIPE SEWER LIN FT $23.39 576.00 $13,472.64 0.00 $0.00 763.00 $ 17,846.57 47 48 2503.603 20" STEEL CASING PIPE (JACKED) LIN FT $143.47 90.00 $12,912.30 0.00 $0.00 90.00 $12,912.30 48 49 - 2503.603 - 6" PVC PIPE SEWER SDR 26 - LIN FT $9.30 450.00 $4,185.00 0.00 $0.00 442.00 $4,110.60 49 50 2503.603 8" PVC PIPE SEWER SDR 26 LIN FT $10.42 150.00 $1,563.00 0.00 $0.00 150.00 $1,563.00 50 51 2503 603 8 PVC PIPE SE WER SDR 35 _ _ LIN FT $9.66 110.00 $1,062.60 0.00 $0.00 110.00 $1,062.60 51 52 _ 2503.603 - 10" PVC PIP SEW S DR 26 -_ - _ LIN FT $11.9 2502.00 $29,948.94 0.00 $0.00 2497.00 $29,889.09 52 53 2503.603 10" PVC PIPE SEW SDR 35 LIN FT $10.88 647.00 $7,0 0.00 $0.00 6 $7,039.36 54 2503.603 SANITARY SEWER INSPECTI (TELEVISING) -_ LIN FT $0.45 3409.00 $1,534.05 0.00 $0.00 3404.00 $1,531.80 55 2504.602 CONNECT TO EXISTING WATERMAIN EACH $325.00 6.00 $1,950.00 0.00 $0.00 6.00 $1,950.00 [ 58 2504.602 RECONNECT WATER SERVICE EACH $262.97 1.00 $262.97 0.00 $0.00 1.00 $262.97 57 2504.602 HYDRANT EACH $1,282.46 17.00 $21,801.82 0.00 $0.00 16.00 $20,519.36 58 2504.602 4" CUT & PLUG EACH $167.24 3.00 $501.72 0.00 $0.00 3.00 $501.72 58 59 2504.602 4" GATE VALVE AND BOX EACH $349.40 3.00 $1,048.20 0.00 $0.00 3.00 $1,04620 59 60 2504.602 6" GATE VALVE AND BOX EACH $412.53 21.00 $8,663.13 0.00 $0.00 22.00 $9,075.66 60 61 2504.602 8" GATE VALVE AND BOX - EACH $568.97 7.00 $3,982.79 0.00 $0.00 8.00 $4,551.76 61 62 2504.602 12" GATE VALVE AND BOX EACH $1,000.89 2.00 $2,001.78 0.00 $0.00 2.00 $2,001.78 62 63 2504 16" GATE VALVE AND BOX EACH $3,028.65 5.00 $15,143.25 0.00 $0.00 5.00 $15,143.25 63 64 2504.602 1.5" CORPORATION STOP EACH $140.58 1.00 $140.58 0.00 $0.00 1.00 $140.58 64 - 65 2504.603 1.5" TYPE K COPPER PIPE LIN FT $7,70 30.00 $231.00 0.00 $0.00 32.00 $246.40 65 66 2504.603 VALVE BOX EXTENSION LIN FT $71.74 10.00 $717.40 0.00 $0.00 0.00 $0.00 66 67 2504.603 HYDRANT RISER LIN FT $305.64 10.00 $3,056.40 0.00 $0.00 6.50 $1,986.66 67 68 2504.603 4" W ATER MAIN -D I RON CL 52 _ -- LIN FT $19.16 8 5.00 $1,628.60 0.00 $0.00 12 4.00 $2,375.84 68 69 2504.603 6" WATER MAIN DUCT IRON CL 52 LIN FT $14.42 590.00 $8,507.80 0.00 $0.00 655.00 $9,445.10 6 69 9 70 2504.603 8" WATER MAIN -DUCT IRON CL 52 LIN FT $15.04 1390.00 $20,905.60 _.._ 0.00 $0.00 1515.00 . - $22,785.80 2 .____ 70 71 2504.603 12 WATER MAIN -DUCT IRON CL 62 LIN FT $30.67 40.00 $1,226.80 0.00 $0.00 42.00 $1,288.14 _ 71 72 2504.603 16' WATER MAIN -DUCT IRON CL 50 LIN FT $25.75 4430.00 $114,072.50 0.00 $0.00 4403.00 $113,377.25 72 73 2504 603 32" STEEL CASING PIPE (JACKED) LIN FT $239.18 80.00 $19,134.40 0.00 $0.00 $16,742.80 73 70.00 74 2504 605 4" POLYSTYRENE INSULATION SO YD $14.33 20.00 $286.60 0.00 $0.00 2329 $333.75 74 75 2504.620 DUCTILE IRON FITTINGS POUND $1.50 22700.00 $34,050.00 0.00 $0.00 24345.00 $38,517.50 75 76 2506.501 CONST DRAINAGE STRUCTURE DES 48 -4020 LIN FT $106.46 132.27 $14,081.46 0.00 $0.00 133.20 $14,180.47 77 2508.801 CONST DRAINAGE STRUCTURE DES 60 -4020 1 I FT $199,0,1) 68.05 $11,201.50 0.00 $0.00 74.40 $14,888.83 J79 78 2506.501 CONST DRAINAGE STRUCTURE DES 72.4020 LIN FT $283,71 14.35 $3,784.24 0.00 $0.00 22.28 $5,875.46 79 250 CONST D RAINAGE STRUCTURE DES 8 4 -4 LIN FT $341.09 22.78 $7,770.03 0.00 $0.00 22.78 $7,770.03 80 -- 2506.501 CONST DRAINAGE S D E S 102 -40 LIN FT - $568.14 8.65 $4,914.41 0.00 $0.00 - 9.89 $5,505.2811 80 IV M AI 14 8-21 o1EXr_EL%Voudwrsx1MVO4 V ouche r Conley Avenue Street & Utility Construction and Appurtenant Work By: N. Marshall City of Rosemount Project No. 303 Date: 12/05/00 S.P. 1908 -44 Voucher No. 7 (Final) WSB Project No. 1148.21 MAI148 -21 0XEXCELNouchers.x15%V47 Contract Contract Completed This Month Total To Date Line Item Line Unit Unit Price Quantity Total $ Quantity Total $ Quantity Total $ No. Number Description No. 81 2506.501 CONS DR STRUCTURE DES 1 - LIN FT $740.00 12.86 $9,516.40 0.00 $0.00 17.97 $13,297.80 81 82 2506.502 CONST DRAI NAGE STRUCTURE DESIGN SPECI EACH $ 2.0 $6,19 0.00 $0.00 2.00 $6,195.42 82 83 2506.502 CONST DRAI STRUCTURE DESIGN SPE 1 (2' X 3' CB) EACH _ $713.12 12.00 $8,557.44 0.00 $0.00 12.00 $8,557.44 83 84 2506.516 CASTING ASSEMBLY _ EACH $402.00 63.00 $25,326.00 0.00 _ $0.00 61.00 $24,522.00 84 85 2506.603 CONST SANITARY MANHOLES LIN FT $113.97 205.30 $23,398.04 0.00 $0.00 224.06 $25,536.12 85 86 2511.501 RANDOM RIP RAP CLASS IV $29.20 49.30 $1,439.56 0.00 $0.00 37 .10 $1,083.3 86 87 2511.507 GROUTED RIP RAP (CLASS IV) $40.20 270.00 $10,854.00 0.00 $0.00 240.00 $9,648.00 87 88 2531.501 CONCRETE CURB & GUTTER DESIGN 8618 aFT $6.15 5520.00 $33,948.00 0.00 $0.00 5502.00 $33,837.30 88 89 2531.507 8' CONCRETE DRIVEWAY PAVEMENT $34.70 350.00 $12,145.00 0.00 $0.00 336.00 $11,659.20 89 90 2554.50 PERMANE BARRICADES $28.0 32.00 $ 896.00 0. $0. 32.00 $8 96.00 90 91 2563 TRAFFIC CONTROL LUMPSUM $8,0 00.00 1.00 $8,000.00 0.15 $1,200.00 1.00 $8,000.00 91 92 2563. TYPE III B UNIT /DAY $2.50 - 10.00 $25.00 0.00 $0.00 0.00 $0.00 92 93 2564.531 - F &I SIGN PANELS TYPE C SO FT $20.25 13 $2,703.38 0.00 $0.00 133.50 $2,703.38 93 94 2564.602 F &I SIGN PANELS TYPE D EACH $325.00 4.00 $1,300.00 0.00 $0.00 4.00 $1,300.00 94 95 2564.602 PAVEMENT MESSAGE (RT ARROW) POLY PREFORM EACH $625.00 2.00 $1,250.00 2.00 $1,260.00 2.00 $1,250.00 95 96 2564.603 4' DOUBLE SOLID LINE YELLOW - $0.40 3315.00 $1,326.00 0,00 $0.00 4921.00 $1,968.40 96 97 2564.603 4" SOLID LINE WHITE -EPDXY $0.86 8749.00 $7,524.14 0.00 $0.00 8595.00 $7,391.70 97 98 2564.603 4" BROKEN LINE WHITE -EPDXY aLINFT $0.86 150.00 $129.00 0.00 $0.00 40.00 $ 98 99 2 564.603 4" SOLID LINE YELLOW -EPDXY _ $0.90 1133.00 $1,019.70 0.00 $0.00 1133.00 $1,019.70 99 100 2564.603 4" DOUBLE SOLID LINE YELL -EPDXY _ $1.80 4373.00 $ 0.00 $0.00 4396.00 $7,912.80 100 101 2565.603 4" NON - METALLIC CONDUIT LIN FT $4.00 400.00 $1,600.00 0.00 $0.00 0.00 $0.00 101 102 2573.501 BALE CHECK EACH $7.50 260.00 $1,950.00 0.00 $0.00 0.00 $0.00 102 103 2573.502 SILT FENCE, TYPE HEAVY DUTY LIN FT $1.90 3540.00 $6,726.0 0. 00 $0.00 521.00 $ 989.90 103 104 2573.506 SEDIMENT TRAP EXCAVATION CU YD $1.75 7500.00 $1 0.00 $0.00 0.00 $0.00 104 105 SEEDING (INCL SEED, 4" TOPSOIL, MULCH, FERTILIZER & DISC 2575.501 _ - -- " -- - -- - ANCHORING ) ACRE $750.00 11.00 $8,250.00 2.00 $1,500.00 13.00 $9,750.00 105 106 2575.505 SODDING TYPE LAWN (INCL 4" TOPSOIL) SQ YD $1.85 5060.00 $9,361.00 968.00 $1,790.80 6568.00 $12,150.80 106 107 2575.511 MULCH MATERIAL, TYPE 1 TON $250.00 10.00 $2,500.00 0.00 $0.00 0.00 $0.00 107 108 DIV -S CLAY POND LIN (IMPORTED MATE RIAL) SY $5.53 1500 $82,950.00 0.00 $ 3092.22 $17,099.98 108 109 DIV -S CLAY POND LINER (ON -SITE MATERIAL) SY $2.13 15000.00 $31,950.00 0.00 $0.00 6063.00 $10,784.19 109 Total $1,329,607.35 $11,455.69 $1,220,269.99 MAI148 -21 0XEXCELNouchers.x15%V47 Voucher Detail List Conley Avenue Street & Utility Construction and Appurtenant Work By: N. Marshall City of Rosemount Project No. 303 Date: 12/05/00 S.P. 1906 -44 Voucher No. 7 (Final) WSB Project No. 1148.21 e Order No.1 CABLE CONCRETE Total Change Order No.1 e Order No. 2 LIN FT $9.00 1280.00 0 $1 $1 1280.001 $11,520.00 1 $11,520.00 1 ` Bulkhead Install 1.5" Copper Watermain to Anderson Fleet Contract Contract [Completed This Month Total To Date Line No. Item Number Description Unit Unit Price Quantity Total E Quantity Total $ Quantity Total $ Line 0.00 $0.00 1.00 $216.00 3 Raise F g Water &Sprinkler Lines on Golf Course Over New No. e Order No.1 CABLE CONCRETE Total Change Order No.1 e Order No. 2 LIN FT $9.00 1280.00 0 $1 $1 1280.001 $11,520.00 1 $11,520.00 1 ` Bulkhead Install 1.5" Copper Watermain to Anderson Fleet LS $1,202.50 1.00 $1,202.50 0.00 $0.00 1.00 $1,202.50 2 Existing Abandoned Storm Line LS $216.00 1.00 $216.00 0.00 $0.00 1.00 $216.00 3 Raise F g Water &Sprinkler Lines on Golf Course Over New Storm Line Line LS $1,600.00 1.00 $1,600.00 0.00 $0.00 1.00 $1,600.00 4 Lower Hydrant on West Side of Wayne Transport Bldg. LS $1,160.92 1.00 $1,160.92 0.00 $0.00 1.00 $1,160.92 5 Offset Watermain Under High Pressure Gas Line Along Hwy 52 LS $1,530.00 1.00 $1,530.00 0.00 $0.00 1.00 $1,530.00 6 Reinstall 2" Watermain and 6" DIP Fire Line to Anderson Fleet LS $2,279.50 1.00 $2,279.50 0.00 $0.00 Total Change Order No. 2 1.00 $2,279.50 $7,988.92 $0.00 $7.888,92 Grand Total $1,349,116.27 $11,455.69 $1,239,778.91 `w MAI 14e- 21a,ExcEUVOUdbrs. 08wOa