HomeMy WebLinkAbout6.i. Change Order #1, Evermoor 4th Addition, City Project #333e
CITY OF ROSEMOUNT
EXECUTIVE SUMMARY FOR ACTION
CITY COUNCIL MEETING DATE: October 16, 2001
AGENDA ITEM: Change Order # 1, Evermoor 4" Addition AGENDA SECTION:
Street & Utility Improvements, City Project #333 Consent
PREPARED BY: Bret A Weiss, Interim City Engineer AGEN =NQ :5.
ATTACHMENTS: Change Order #1 APPROVED BY: _
In accordance with action taken at the last City Council meeting, we have solicited construction
cost from two contractors currently working for the City to consider completing the Evermoor
Wicklow Addition project. The bid received from Ryan Contracting in the amount of
$148,769.40 was the only responsible bid and was acceptable to the developer.
We are requesting the approval of Change Order #1 in the amount of $148,769.40.
RECOMMENDED ACTION:
OF $148,769.40.
COUNCIL ACTION:
MOTION TO APPROVE CHANGE ORDER #1 IN THE AMOUNT
2
CHANGE ORDER NO.2
Evermoor 4th Addition - Phase 2 & Marcotte Pond Outlet
City of Rosemount, MN
City Project No. 333 & 329
WSB Project No. 1237 -50 & 1323 -00
OWNER:
CONTRACTOR:
CITY OF ROSEMOUNT
RYAN CONTRACTING CO.
2875 145TH STREET WEST
8700 13TH AVE EAST
ROSEMOUNT, MN 55068
SHAKOPEE, MN 55379
YOU ARE DIRECTED TO MAKE THE FOLLOWING CHANGES IN THE CONTRACT DOCUMENT DESCRIPTION:
The following items are added to the contract, as attached.
Add Wicklow Neighborhood proejct to this contract.
Quantities and unit prices for the Wicklow Neighborhood are attached.
CHANGE IN CONTRACT PRICE:
CHANGE IN CONTRACT TIME:
ORIGINAL CONTRACT PRICE: $699,192.00
ORIGINAL CONTRACT TIME:
10/15/2001
PREVIOUS CHANGE ORDERS: NO. 1 TO 1 $21,261.85
NET CHANGE FROM PREVIOUS CHANGE ORDERS:
NONE
CONTRACT PRICE PRIOR TO THIS CHANGE ORDER: $720,453.85
CONTRACT TIME PRIOR TO THIS CHANGE ORDER:
10/15/2001
NET INCREASE /DECREASE OF THIS CHANGE ORDER: $148,769.40
NET INCREASE OF CHANGE ORDER:
NONE
CONTRACT PRICE WITH ALL APPROVED CHANGE ORDERS $869,223.25
CONTRACT TIME WITH APPROVED CHANGE ORDERS:
6/1512002
RECOMMENDED BY:
APPROVED BY:
Bret A. Weiss, P.E.
WSB & ASSOCIATES, INC.
RYAN CONTRACTING CO.
ENGINEER
CONTRACTOR
APPROVED BY:
CITY ENGINEER
MAYOR
DATE
F:\wpwin\1237-50\Excel\voucher\CO-2
Change Order No. 2 Detail
Evermoor 4th Addition - Phase 2 & Marcotte Pond Outlet
City of Rosemount, MN
City Project No. 333 & 329 WSB Project No. 1237 -50 & 1323 -00
Wicklow Neighborhood - Schedule A - Surface Improvements
Total Schedule A $89,570.50
Wicklow Neighborhood - Schedule B - Sanitary Sewer
Item No. Description
Qty
Unit
Price
Extended
Amount
Extended
Item No. Description
Qty
Unit
Price
Amount
1
MOBILIZATION
LUMP SUM
1.00
$5,500.00
$5,500.00
2
SUBGRADE EXCAVATION
CU YD
50.00
$4.00
$200.00
3
SELECT GRANULAR BORROW (CV) (PLACEMENT)
CU YD
1,800.00
$3.50
$6,300.00
4
SUBGRADE PREPARATION
ROAD STA
7.00
$150.00
$1,050.00
5
AGGREGATE BASE CLASS 5 (100% CRUSHED) (6 ")
TON
920.00
$10.00
$9,200.00
6
TYPE LV 3 WEARING COURSE MIXTURE (2 ")
TON
270.00
$39.50
$10,665.00
7
TYPE LV 3 NON - WEARING COURSE MIXTURE (2 ")
TON
270.00
$45.00
$12,150.00
8
BITUMINOUS MATERIAL FOR TACK COAT
GALLON
125.00
$5.00
$625.00
9
GRANULAR FOUNDATION AND /OR BEDDING
TON
50.00
$0.01.
$0.50
10
4" CONCRETE WALKT (5' WIDE)
SQ FT
3,000.00
$2.85
$8,550.00
11
CONCRETE CURB & GUTTER DESIGN MODIFIED "S"
LIN FT
1,200.00
$10.00
$12,000.00
12
4" NON- METALLIC CONDUIT
LIN FT
60.00
$7.00
$420.00
13
TRAFFIC CONTROL
LUMP SUM
1.00
$500.00
$500.00
14
BALE CHECK
EACH
10.00
$6.00
$60.00
15
SEEDING (INCL. FERTILIZER, MULCH, & DISC)
ACRE
1.00
$700.00
$700.00
16
SODDING TYPE LAWN
SQ YD
975.00
$2,00
$1,950.00
17
STREET CLEANING /SWEEPING
LUMP SUM
1.00
$2,500.00
$2,500.00
18
TEMPORARY 24' WIDE ROADWAY
LUMP SUM
1.00
$17,200.00
$17,200.00
Total Schedule A $89,570.50
Wicklow Neighborhood - Schedule B - Sanitary Sewer
Item No. Description
Qty
Unit
Price
Extended
Amount
19
4" PVC PIPE SEWER SDR 26
LIN FT
476
$8.00
$3,808.00
20
8" PVC PIPE SEWER SDR 26
LIN FT
345
$38.00
$13,110.00
21
8" PVC PIPE SEWER SDR 35
LIN FT
225
$17.00
$3,825.00
22
CONNECT TO EXISTING SANITARY SEWER
EACH
1
$2,500.00
$2,500.00
23
8 "X4" PVC WYE
EACH
10
$48.00
$480.00
24
SANITARY SEWER INSPECTION (TELEVISING)
LIN FT
570
$0.60
$342.00
25
CASTING ASSEMBLY
EACH
5
$300.00
$1,500.00
26
CONSTRUCT SANITARY MANHOLES
LIN FT
82.09
$110.00
$9,029.90
Total Schedule B $34,594.90
Wicklow Neighborhood - Schedule C - Watermain
Total Schedule C $24,604.00
Net Change Order No. 2 Total $148,769.40
F:\wpwin \1237 -50 \Excel \voucher\CO2 Detail
Extended
Item No. Description
Qty
Unit
Price
Amount
27
CONNECT TO EXISTING WATER MAIN - 8"
EACH
2
$500.00
$1,000.00
28
HYDRANT ASSEMBLY
EACH
1
$2,000.00
$2,000.00
29
8" GATE VALVE
EACH
1
$670.00
$670.00
30
1" CORPORATION STOP
EACH
10
$60.00
$600.00
31
1" CURB STOP & BOX
EACH
10
$80.00
$800.00
32
1" TYPE K COPPER PIPE
LIN FT
476
$9.00
$4,284.00
33
8" WATER MAIN -DUCT IRON CL 52
LIN FT
710
$17.00
$12,070.00
34
16" WATERMAIN - DUCT IRON CL 52
LIN FT
20
$65.00
$1,300.00
35
4" POLYSTYRENE INSULATION
SQ YD
20
$16.00
$320.00
36
DUCTILE IRON FITTINGS
POUND
1200
$1.30
$1,560.00
Total Schedule C $24,604.00
Net Change Order No. 2 Total $148,769.40
F:\wpwin \1237 -50 \Excel \voucher\CO2 Detail