HomeMy WebLinkAbout6.i. Change Order #1, Evermoor 4th Addition, City Project #333e CITY OF ROSEMOUNT EXECUTIVE SUMMARY FOR ACTION CITY COUNCIL MEETING DATE: October 16, 2001 AGENDA ITEM: Change Order # 1, Evermoor 4" Addition AGENDA SECTION: Street & Utility Improvements, City Project #333 Consent PREPARED BY: Bret A Weiss, Interim City Engineer AGEN =NQ :5. ATTACHMENTS: Change Order #1 APPROVED BY: _ In accordance with action taken at the last City Council meeting, we have solicited construction cost from two contractors currently working for the City to consider completing the Evermoor Wicklow Addition project. The bid received from Ryan Contracting in the amount of $148,769.40 was the only responsible bid and was acceptable to the developer. We are requesting the approval of Change Order #1 in the amount of $148,769.40. RECOMMENDED ACTION: OF $148,769.40. COUNCIL ACTION: MOTION TO APPROVE CHANGE ORDER #1 IN THE AMOUNT 2 CHANGE ORDER NO.2 Evermoor 4th Addition - Phase 2 & Marcotte Pond Outlet City of Rosemount, MN City Project No. 333 & 329 WSB Project No. 1237 -50 & 1323 -00 OWNER: CONTRACTOR: CITY OF ROSEMOUNT RYAN CONTRACTING CO. 2875 145TH STREET WEST 8700 13TH AVE EAST ROSEMOUNT, MN 55068 SHAKOPEE, MN 55379 YOU ARE DIRECTED TO MAKE THE FOLLOWING CHANGES IN THE CONTRACT DOCUMENT DESCRIPTION: The following items are added to the contract, as attached. Add Wicklow Neighborhood proejct to this contract. Quantities and unit prices for the Wicklow Neighborhood are attached. CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIME: ORIGINAL CONTRACT PRICE: $699,192.00 ORIGINAL CONTRACT TIME: 10/15/2001 PREVIOUS CHANGE ORDERS: NO. 1 TO 1 $21,261.85 NET CHANGE FROM PREVIOUS CHANGE ORDERS: NONE CONTRACT PRICE PRIOR TO THIS CHANGE ORDER: $720,453.85 CONTRACT TIME PRIOR TO THIS CHANGE ORDER: 10/15/2001 NET INCREASE /DECREASE OF THIS CHANGE ORDER: $148,769.40 NET INCREASE OF CHANGE ORDER: NONE CONTRACT PRICE WITH ALL APPROVED CHANGE ORDERS $869,223.25 CONTRACT TIME WITH APPROVED CHANGE ORDERS: 6/1512002 RECOMMENDED BY: APPROVED BY: Bret A. Weiss, P.E. WSB & ASSOCIATES, INC. RYAN CONTRACTING CO. ENGINEER CONTRACTOR APPROVED BY: CITY ENGINEER MAYOR DATE F:\wpwin\1237-50\Excel\voucher\CO-2 Change Order No. 2 Detail Evermoor 4th Addition - Phase 2 & Marcotte Pond Outlet City of Rosemount, MN City Project No. 333 & 329 WSB Project No. 1237 -50 & 1323 -00 Wicklow Neighborhood - Schedule A - Surface Improvements Total Schedule A $89,570.50 Wicklow Neighborhood - Schedule B - Sanitary Sewer Item No. Description Qty Unit Price Extended Amount Extended Item No. Description Qty Unit Price Amount 1 MOBILIZATION LUMP SUM 1.00 $5,500.00 $5,500.00 2 SUBGRADE EXCAVATION CU YD 50.00 $4.00 $200.00 3 SELECT GRANULAR BORROW (CV) (PLACEMENT) CU YD 1,800.00 $3.50 $6,300.00 4 SUBGRADE PREPARATION ROAD STA 7.00 $150.00 $1,050.00 5 AGGREGATE BASE CLASS 5 (100% CRUSHED) (6 ") TON 920.00 $10.00 $9,200.00 6 TYPE LV 3 WEARING COURSE MIXTURE (2 ") TON 270.00 $39.50 $10,665.00 7 TYPE LV 3 NON - WEARING COURSE MIXTURE (2 ") TON 270.00 $45.00 $12,150.00 8 BITUMINOUS MATERIAL FOR TACK COAT GALLON 125.00 $5.00 $625.00 9 GRANULAR FOUNDATION AND /OR BEDDING TON 50.00 $0.01. $0.50 10 4" CONCRETE WALKT (5' WIDE) SQ FT 3,000.00 $2.85 $8,550.00 11 CONCRETE CURB & GUTTER DESIGN MODIFIED "S" LIN FT 1,200.00 $10.00 $12,000.00 12 4" NON- METALLIC CONDUIT LIN FT 60.00 $7.00 $420.00 13 TRAFFIC CONTROL LUMP SUM 1.00 $500.00 $500.00 14 BALE CHECK EACH 10.00 $6.00 $60.00 15 SEEDING (INCL. FERTILIZER, MULCH, & DISC) ACRE 1.00 $700.00 $700.00 16 SODDING TYPE LAWN SQ YD 975.00 $2,00 $1,950.00 17 STREET CLEANING /SWEEPING LUMP SUM 1.00 $2,500.00 $2,500.00 18 TEMPORARY 24' WIDE ROADWAY LUMP SUM 1.00 $17,200.00 $17,200.00 Total Schedule A $89,570.50 Wicklow Neighborhood - Schedule B - Sanitary Sewer Item No. Description Qty Unit Price Extended Amount 19 4" PVC PIPE SEWER SDR 26 LIN FT 476 $8.00 $3,808.00 20 8" PVC PIPE SEWER SDR 26 LIN FT 345 $38.00 $13,110.00 21 8" PVC PIPE SEWER SDR 35 LIN FT 225 $17.00 $3,825.00 22 CONNECT TO EXISTING SANITARY SEWER EACH 1 $2,500.00 $2,500.00 23 8 "X4" PVC WYE EACH 10 $48.00 $480.00 24 SANITARY SEWER INSPECTION (TELEVISING) LIN FT 570 $0.60 $342.00 25 CASTING ASSEMBLY EACH 5 $300.00 $1,500.00 26 CONSTRUCT SANITARY MANHOLES LIN FT 82.09 $110.00 $9,029.90 Total Schedule B $34,594.90 Wicklow Neighborhood - Schedule C - Watermain Total Schedule C $24,604.00 Net Change Order No. 2 Total $148,769.40 F:\wpwin \1237 -50 \Excel \voucher\CO2 Detail Extended Item No. Description Qty Unit Price Amount 27 CONNECT TO EXISTING WATER MAIN - 8" EACH 2 $500.00 $1,000.00 28 HYDRANT ASSEMBLY EACH 1 $2,000.00 $2,000.00 29 8" GATE VALVE EACH 1 $670.00 $670.00 30 1" CORPORATION STOP EACH 10 $60.00 $600.00 31 1" CURB STOP & BOX EACH 10 $80.00 $800.00 32 1" TYPE K COPPER PIPE LIN FT 476 $9.00 $4,284.00 33 8" WATER MAIN -DUCT IRON CL 52 LIN FT 710 $17.00 $12,070.00 34 16" WATERMAIN - DUCT IRON CL 52 LIN FT 20 $65.00 $1,300.00 35 4" POLYSTYRENE INSULATION SQ YD 20 $16.00 $320.00 36 DUCTILE IRON FITTINGS POUND 1200 $1.30 $1,560.00 Total Schedule C $24,604.00 Net Change Order No. 2 Total $148,769.40 F:\wpwin \1237 -50 \Excel \voucher\CO2 Detail