HomeMy WebLinkAbout6.h. Change Order #1, Eastside Watermain Improvements, City Project #320,M CITY OF ROSEMOUNT EXECUTIVE SUMMARY FOR ACTION CITY COUNCIL MEETING DATE: October 16, 2001 AGENDA ITEM: Change Order # 1, Eastside Watermain AGENDA SECTION: Improvements, City Project #320 Consent PREPARED BY: Bret A Weiss, Interim City Engineer AGENDA_NO: ATTACHMENTS: Change Order #1 APPROVED BY: During the final stages of construction for the above referenced project, we encountered very wet unstable soils just north of 140' Street. After much deliberation and in an effort to get the project completed, it was decided that the most cost effective construction technique would be to directional bore 650 feet of pipe to complete the installation. This work was completed at a cost of $66 /lf or $42,900, the amount of Change Order #1. Correspondingly, the originally bid 12" DIP will not be used, resulting in a net cost increase of $27,300. We are requesting the approval of Change Order #1 in the amount of $42,900. RECOMMENDED ACTION: MOTION TO APPROVE CHANGE ORDER #1 IN THE AMOUNT OF $42,900. � COUNCIL ACTION: 1 CHANGE ORDER NO. I Eastside Watermain Extension & Appurtenant Work City of Rosemount, MN City Project No. 320 WSB Project No. 1252 -00 OWNER: CONTRACTOR: City of Rosemount 2875 145th Street West Rosemount, MN 55068 Design Excavating, Inc. PO Box 86 Belle Plaine, MN 56011 YOUR ARE DIRECTED TO MAKE THE FOLLOWING CHANGES IN THE CONTRACT DOCUMENT DESCRIPTION: SEE ATTACHED LETTER AND SCHEDULE OF CHANGES FOR QUANTITIES AND COSTS. CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIME: ORIGINAL CONTRACT PRICE: $904,709.00 ORIGINAL CONTRACT TIME: PREVIOUS CHANGE ORDERS: NO. _ TO _ $0.00 NET CHANGE FROM PREVIOUS CHANGE ORDERS: NONE CONTRACT PRICE PRIOR TO THIS CHANGE ORDER: $904,709.00 CONTRACT TIME PRIOR TO THIS CHANGE ORDER: NET INCREAS&DECREASE OF THIS CHANGE ORDER: $42,900.00 NET INCREASE OF CHANGE ORDER: NONE CONTRACT PRICE WITH ALL APPROVED CHANGE ORDER; $947,609.00 CONTRACT TIME WITH APPROVED CHANGE ORDERS: RECOMMENDED BY: APPROVED BY: Bret Weiss, P.E. WSB & ASSOCIATES, INC. DESIGN EXCAVATING, INC. ENGINEER CONTRACTOR APPROVED BY CITY ENGINEER MAYOR DATE 14 S Change Order No. 1 Detail Eastside Watermain Extension & Appurtenant Work City of Rosemount, MN City Project No. 320 WSB Project No. 1252 -00 Extended Item No. Description Qty Unit Price Amount 1 Directional Bore 12" PE Watermain 650 LF $66.00 $42,900.00 Total $42,900.00 f:`,wpwin \1252 -00 \Excel \vouchers\C01 Detail