Loading...
HomeMy WebLinkAbout6.i. Change Order #1, Rural Water SCADA System and Standby Generator City Project #302IF CITY OF ROSEMOUNT EXECUTIVE SUMMARY FOR ACTION CITY COUNCIL MEETING DATE: August 21, 2001 AGENDA ITEM: Change Order #1 — Rural Water SCADA AGENDA SECTION: System and Standby Generator, City Project #302 Consent PREPARED BY: Bret A. Weiss, Interim City Engineer AGEND w6 ATTACHMENTS: Change Order #1 APPROVED BY: The Rural Water SCADA System pertains to the rural wells that serve the East Side Water System. With the construction of the new water tower, the computer operating system ( SCADA) needed to be upgraded to connect the existing wells to the new tower. Upon installation of the new equipment, it was identified that an additional item (a DV /DT output filter for the variable frequency drive) needed to be added to the system. Bonestroo has prepared the attached Change Order, which increases the original contract by $2,042.20 to a total of $102,641.20. RECOMMENDED ACTION: MOTION TO APPROVE CHANGE ORDER #1 TO THE RURAL WATER SCADA SYSTEM AND STANDBY GENERATOR, CITY PROJECT #302. COUNCIL ACTION: E:3