Loading...
HomeMy WebLinkAbout6.h. Receive Bids/Award Contract - Trunk Highway 3 Street & Utility Improvements (145th Street West to Lower 147th Street West), City Project #318k CITY OF ROSEMOUNT EXECUTIVE SUMMARY FOR ACTION CITY COUNCIL MEETING DATE: August 21, 2001 AGENDA ITEM: Receive Bids /Award Contract -Trunk AGENDA SECTION: Highway 3 Street & Utility Improvements (145 Street West Consent to Lower 147 Street West), City Project #318 PREPARED BY: Bret A. Weiss, Interim City Engineer AGEN , # 6, ATTACHMENTS: Bid Tabulation APPROVED BY: ��Xl M On Wednesday, August 15, 2001, bids for the above referenced project were received and read aloud publicly. Four (4) bids were received on the project. The apparent low bidder for the project is Bituminous Roadways, Inc. in the amount of $489,991.40. The bids ranged from the low bid to a high bid of $616,295.00 and the Engineer's Estimate was $315,763.75._ The low bid was substantially higher than the engineer's estimate. In investigating high bids, there are three main factors contributing to the higher bids. First, the bid is late in the construction season and most contractors are fairly busy trying to complete the work that they already have. The contract calls for the contractor giving Xcel Energy 15 working days to complete their underground and light pole bases once the sidewalk is removed, thereby not allowing the street contractor to get started until late September. Second, this project is fairly small in scope and there are a lot of small quantities, hand type work around many driveways, catch basins, etc. If the project could be added to a larger project, it would help lower the bids. Finally, constructing the project under traffic adds a substantial cost to the bids. If the road could be closed to traffic, there could be further cost savings. It is our recommendation that all of the bids be rejected and that this project be combined with next year's phase to make it a larger project and bid the job in early spring to get the best bids. We would also discuss with MnDOT the possibility of closing the road to traffic, since next year's phase, which is a reconstruction project, will involve some road closings. RECOMMENDED ACTION: MOTION TO REJECT ALL BIDS FOR TRUNK HIGHWAY 3 STREET AND UTILITY IMPROVEMENTS (145 STREET TO LOWER 147 STREET), CITY PROJECT #318. COUNCIL ACTION: El AUG - - 2001 11 bISB & ASSOCIATES IHC. 7635411700 P. 0_2/ TRUNK HIGHWAY NO.3 COMMERCIAL ENHANCEMENT FLAN PHASE 2 CITY OF ROSEMOUNT, MN C.F. NO. 318 Bids Opened: August 15, 2001 Contrae Bid Security Totes Bid 1 BITUMINOUS ROADWAYS x $489.991.40 2 MUNICIPAL CONTRACTING SVCS X $491,907.91 3 MCNAMARA CONTR INC k' at+98,334.'1 4 VALLEY PAVING INC. X $617,582.00 Engineer's Estimate $311 I hereby certify that this is a true and correct tabulation of the bids as received on August i 5, 2001. - 49� < 2,!; 7 �7j David E. Hutton, P.E. 'T Denotes corrected figure F.WVPWJM1i8i20NEXMLUAdtsM'1d Summary TOTAL P.02