CITY OF ROSEMOUNT
EXECUTIVE SUMMARY FOR ACTION
CITY COUNCIL MEETING DATE: August 21, 2001
AGENDA ITEM: Receive Bids /Award Contract -Trunk
AGENDA SECTION:
Highway 3 Street & Utility Improvements (145 Street West
Consent
to Lower 147 Street West), City Project #318
PREPARED BY: Bret A. Weiss, Interim City Engineer
AGEN ,
# 6,
ATTACHMENTS: Bid Tabulation
APPROVED BY:
��Xl
M
On Wednesday, August 15, 2001, bids for the above referenced project were received and
read aloud publicly. Four (4) bids were received on the project.
The apparent low bidder for the project is Bituminous Roadways, Inc. in the amount of
$489,991.40. The bids ranged from the low bid to a high bid of $616,295.00 and the
Engineer's Estimate was $315,763.75._
The low bid was substantially higher than the engineer's estimate. In investigating high bids,
there are three main factors contributing to the higher bids. First, the bid is late in the
construction season and most contractors are fairly busy trying to complete the work that they
already have. The contract calls for the contractor giving Xcel Energy 15 working days to
complete their underground and light pole bases once the sidewalk is removed, thereby not
allowing the street contractor to get started until late September. Second, this project is fairly
small in scope and there are a lot of small quantities, hand type work around many driveways,
catch basins, etc. If the project could be added to a larger project, it would help lower the
bids. Finally, constructing the project under traffic adds a substantial cost to the bids. If the
road could be closed to traffic, there could be further cost savings.
It is our recommendation that all of the bids be rejected and that this project be combined with
next year's phase to make it a larger project and bid the job in early spring to get the best bids.
We would also discuss with MnDOT the possibility of closing the road to traffic, since next
year's phase, which is a reconstruction project, will involve some road closings.
RECOMMENDED ACTION: MOTION TO REJECT ALL BIDS FOR TRUNK HIGHWAY 3
STREET AND UTILITY IMPROVEMENTS (145 STREET TO LOWER 147 STREET), CITY
PROJECT #318.
COUNCIL ACTION:
El
AUG - - 2001 11 bISB & ASSOCIATES IHC. 7635411700 P. 0_2/
TRUNK HIGHWAY NO.3 COMMERCIAL ENHANCEMENT FLAN PHASE 2
CITY OF ROSEMOUNT, MN
C.F. NO. 318
Bids Opened: August 15, 2001
Contrae
Bid Security
Totes Bid
1 BITUMINOUS ROADWAYS
x
$489.991.40
2 MUNICIPAL CONTRACTING SVCS
X
$491,907.91
3 MCNAMARA CONTR INC
k'
at+98,334.'1
4 VALLEY PAVING INC.
X
$617,582.00
Engineer's Estimate
$311
I hereby certify that this is a true and correct tabulation of the bids as received on August i 5, 2001.