CITY OF ROSEMOUNT
EXECUTIVE SUMMARY FOR ACTION
CITY COUNCIL MEETING DATE: August 21, 2001
AGENDA ITEM: Payment #5 & Final — 2000 Street & Utility
AGENDA SECTION:
Reconstruction Improvements, City Project #316
Consent
PREPARED BY: Rich Lonnquist, Senior Engineering Technician
AGEN
[W vit 6
ATTACHMENTS: Letter from WSB, Payment Voucher #5 &
APPROVED BY:
Final
6611,
This item requests the third and final payment to Arcon Construction Co., in the amount of
$113,611.30 for City Project #316, 2000 Street and Utility Reconstruction Improvements.
This project is now 100 % complete, only punch list items remain
Upon final payment a two -year warranty period begins. The City also accepts these facilities
for perpetual maintenance.
Attached is Construction Pay Voucher #5 and Final for your information. Staff and WSB
recommend approval of this payment and perpetual maintenance.
RECOMMENDED ACTION: MOTION TO APPROVE PAYMENT #5 AND FINAL TO ARCON
CONSTRUCTION CO. IN THE AMOUNT OF $113,611.30 FOR THE 2000 STREET AND
UTILITY RECONSTRUCTION IMPROVEMENTS, CITY PROJECT #316 AND ACCEPT THE
IMPROVEMENTS FOR PERPETUAL MAINTENANCE.
COUNCIL ACTION:
1
`®
W
& Associates, Inc.
August 10, 2001
Mr. Rich Lonnquist
City of Rosemount
2875 145 Street West _
Rosemount, MN 55068 -4997
Re: Construction Pay Voucher No. 5 (Final)
2000 Street and Utility Reconstruction Project
City of Rosemount Project No. 316
WSB Project No. 1210 -00
Dear Mr. Lonnquist:
Please find enclosed Construction Pay Voucher No. 5 (Final) for the referenced project in the
amount of S1 13,611.30. We recommend final payment subject to receipt of the following items:
1) Satisfactory showing that the contractor has complied with the provisions of Minnesota
Statutes 290.92 requiring withholding state income tax and;
2) Evidence in the form of an affidavit that all claims against the contractor by reasons of
the contract have been fully paid or satisfactorily secured.
3) Consent of Surety to Final Payment certification from the contractor's surety.
Please make payment in this amount to Arcon Construction Co., Inc. at your earliest
convenience.
Sincerely,
WSB & Associates, Inc.
Mark A. Erichson, P.E.
Project Manager
1150 Olson -
Enclosures
Memorial Highway
Suite 300 c: Arcon Construction Co., Inc.
,Minneapolis
rim
Minnesota
55x22
X63.541 4800
'63541.1700 FAX ua:rl.ar !o -rO �ostracrrpoe `hn- cacc.l: Si. _.cuc = _ai Occcrcnity _ rciayer
r
Project: 2000 Street and Utility Reconstruction Project
City of Rosemount Project No. 316
Contractor: r. nstructic o l.=
i..
43425 Frontage oa
PO Box 159
Harris MN 55032
Coristrcction Pay Voucher K r
Contract Date: 06/20/00
Work Started:
Completion Date:
Work Completed:
Original Contract Amount
$785,221.16
Voucher No.
5 (FINAL)
Date: August 6, 2001
WSB Project No.
1210 -00
Period Ending: August 6, 2001
Total Funds Encumbered
Project: 2000 Street and Utility Reconstruction Project
City of Rosemount Project No. 316
Contractor: r. nstructic o l.=
i..
43425 Frontage oa
PO Box 159
Harris MN 55032
Contract Date: 06/20/00
Work Started:
Completion Date:
Work Completed:
Original Contract Amount
$785,221.16
Total Additions
$0.00
Total Deductions
$0.00
Total Funds Encumbered
$785,221.16
Total Work Certified to Date
$836,490.20
Less Retained Percentage
0.00%
$0.00
Less Previous Payments
$722,878.90
Total Payments Incl. This Voucher
$836,490.20
Balance Carried Forward
($51,269.04)
Approved for Payment This Voucher
$113,611.30
Approvals
WSB & Associates, Inc.
In accordance with field observation as performed in accordance with industry standards, and based on our professional opinion, the
materials installed are satisfactory and the work properly performed in accordance with the plans and specifications.
The total work estimated to be completed as of August 6, 2001 is as indicated herein and we hereby recommend
100%
payment of this voucher.
Signed: Signed:
Construction Observer Project Manager /Engineer
Arcon Construction Co., Inc.
This is to certify that to the best of my knowledge, information, and belief, the quantities and values of work certified herein is a fair
approximate estimate for the period covered by this voucher.
Contractor:
Date:
Contractor:
Date:
Signed:
Title:
Signed:
Title:
City of Rosemount
Checked by:
Date:
Approved for Payment:
Date:
Authorized Representative
M:\1210 -00 \EXCEL \vouchers- .xls \V05 -COVER
Voucher Detail List
WSB Project. 2000 Street and Utility Reconstruction Project
Project Location: Rosemount, MN
Project No's. City Project No. 316
WSB Project No. 1210 -00
By - C.Oltmanns
Date: 08/06/01
Voucher: 5 (FINAL)
Line
No.
Item
Number
Descri lion
Contract
Completed This Month
Total To Date
Line
No.
Unit
Unit Price
Quantity
Total $
Quantity
Total $
Quantity
Total $
Schedule A
1
2021.501
MOBILIZATION
LUMP SUM
$40,000.00
1.00
$40,000.00
0.00
$0.00
1.00
$40,000.00
1
2
2101.502
CLEARING
TREE
$200.00
2.00
$400.00
0.00
$0.00
15.00
$3,000.00
2
3
2101.507
GRUBBING
TREE
$100.00
2.00
$200.00
0.00
$0.00
13.00
$1,300.00
3
4
2104.501
REMOVE SEWER PIPE (STORM)
LIN FT
$8.40
365.00
$3,066.00
0.00
$0.00
218.00
$1,831.20
4
5
2104.501
REMOVE SEWER PIPE (SANITARY)
LIN FT
$4.80
80.00
$384.00
0.00
$0.00
66.00
$316.80
5
6
2104.501
REMOVE CURB AND GUTTER
LIN FT
$3.001
1325.00
$3,975.00
0.001
$0.00
1,562.00
$4,686.00
6
7
2104.501
REMOVE WATER MAIN
LIN FT
$8.40
700.00
$5,880.00
0.00
$0.00
756.00
$6,350.40
7
8
2104.501
REMOVE PIPE CULVERTS
LIN FT
$3.60
270.00
$972.00
0.00
$0.00
442.00
$1,591.20
8
9
2104.501
REMOVE WATER SERVICE PIPE
LIN FT
$4.80
60.00
$288.00
0.00
$0.00
85.00
$408.00
9
10
2104.505
REMOVE BITUMINOUS PAVEMENT
SO YD
$1.25
16415.00
$20,518.75
0.00
$0.00
13,269.00
$16,586.25
10
11
2104.509
REMOVE VALVE AND BOX
EACH
$72.00
3.00
$216.00
0.00
$0.00
3.00
$216.00
11
12
2104.509
REMOVE MANHOLE OR CATCH BASIN
EACH
$240.00
7.00
$1,680.00
0.001
$0.00
4.00
$960.00
12
13
2104.509
REMOVE MANHOLE
EACH
$270.00
3.00
$810.00
0.00
$0.00
3.00
$810.00
13
14
2104.509
REMOVE HYDRANT
EACH
$120.00
1.00
$120.00
0.00
$0.00
1.00
$120.00
14
15
2104.509
REMOVE CURB STOP & BOX
EACH
$96.00
4.00
$384.00
0.00
$0.00
4.00
$384.00
15
16
2104.509
REMOVE CASTING
EACH
$72.00
1.00
$72.00
0.00
$0.00
1.00
$72.00
16
17
2104.511
SAWING CONCRETE PAVEMENT (FULL DEPTH)
LIN FT
$6.00
10.00
$60.00
0.00
$0.00
0.00
$0.00
17
18
2104.513
SAWING BIT PAVEMENT (FULL DEPTH)
LIN FT
$2.50
1250.00
$3,125.00
0.001
$0.00
1,209.00
$3,022.50
18
19
2104.521
SALVAGE SPRINKLER SYSTEM
LIN FT
$ 2.40
500.00
$1,200.00
0.00
$0.00
1,042.00
$2,500.80
19
20
2104.521
SALVAGE PIPE CULVERT
LIN FT
$6.00
120.00
$720.00
0.00
$0.00
0.00
$0.00
20
21
2104.523
SALVAGE SIGN
EACH
$17.00
28.00
$476.00
18.00
$306.00
28.00
$476.00
21
22
2105.501
COMMON EXCAVATION (P)
CU YD
$3.20
20900.00
$66,880.00
0.00
$0.00
20,900.00
$66,880.00
22
23
2105.507
SUBGRADE EXCAVATION
CU YD
$3.20
4910.00
$15,712.00
3,210
$10,272.00
7,939.00
$25,404.80
23
24
25
2105.521
2105.609
GRANULAR BORROW (CV)
GEOTEXTILE FABRIC TYPE IV
CU YD
SO YD
$5.15
$2.00
4770.00
21.00
$24,565.50
$42.001
500.00
0.00
$2,575.00
$0.00
5,915.00
$30,462.25
24
25
0.00
$0.00
26
2211.501
AGGREGATE BASE CLASS 5
TON
$8.80
6700.00
$58,960.00
0.00
$0.00
6,436.00
$66,636.80
26
27
2331.521
IRREGULAR WIDTH PAVING
SO YD
$11.00
535.00
$5,885.00
0.00
$0.00
1,195.00
$13,145.00
27
28
2331.601
BITU MINOUS DRIVEWAY PAVE
SO YD
$13.00
470.00
$6,110.
_- 0.00
$0.00
612.00
$7,956.00
28
29
2340.508
TYPE 41 WEARING COURSE MIXTURE
TON
$28.00
70.00
$1,960.00
0.00
$0.00
102.00
$2,856.00
29
30
2350.609
TYPE LV 3 WEARING COURSE MIXTURE
TON
$28.50
2830.00
$80,655.00
1,343.00
$38,275.50
2,953.00
$84,160.50
30
31
2357.502
BITUMINOUS MATERIAL FOR TACK COAT
GALLON
$2.00
645.00
$1,290.00
525.00
$1,050.00
725.00
$1,450.00
31
32
33
34
2451.601
2501.515
2501.515
GRANULAR FOUNDATION AND /OR BEDDING
15" RC PIPE APRON
18" RC PIPE APRON
CU YD
EACH
EACH
$1 8.40
$662,00
$724.00
90.00
1.00
1.00
$1,656.00
$662.00
$724.00
0.00
0.00
0.00
$0.00
$0.00
$0.00
66.00
1.00
1.00
$1,214.40
$662.00
$724.00
32
33
34
35
2503.541
15" RC PIPE DESIGN 3006 CLASS V
LIN FT
$22.55
1383.00
$31,186.65
0.00
$0.00
1,182.00
$26,654.10
35
36
2503.541
18" RC PIPE DESIGN 3006 CLASS III
LIN FT
$23.28
1031.00
$24,001.66
0.00
$0.00
1,220.00
$28,401.60
37
2503.602
CONNECT TO EXISTING SANITARY SEWER
EACH
$435.00
8.00
$3,480.00
0.00
$0.00
8.00
$3,480.00
38
2503.602
RECONNECT TO EXISTING SANITARY SEWER SER
EACH
$250.00
1.00
$250.00
0.00
$0.00
1.00
$250.00
L 39
39
2503.602
8 "X4" PVC WYE
EACH
$53.00
5.00
$265.00
0.00
$0.00
7.00
$371.00
Page 1 of 3 F: \WPWIN\ 1210 -00\EXCEL% \vouchers- .xis\V05
Voucher Detail List
WSB Project. 2000 Street and Utility Reconstruction Project BY C. Oltmanns
Project Location: Rosemount, MN Date: 08/06/01
Project No's. City Project No. 316 Voucher. 5 (FINAL)
WSB Proiect No. 1210 -00
Page 2 of 3 F:% WPWIN11210- 00XEXCELI%vouchers- .xIs1V05 , *
Contract
Completed This Month
Total To Date
Line
Item
Line
Unit
Unit Price
Quantity
Total $
Quantity
Total $
Quantity
Total $
No.
Number
Description
No.
40
2503.602
8 "X6" PVC WYE
EACH
$63.00
1.00
$63.00
0.00
$0.00
1.00
$63.00
40
41
2503.602
MANHOLE CHIMNEY SEALS
EACH
$200.00
2.00
$400.00
0.00
$0.00
0.00
$0.00
41
42
2503.603
4" PVC PIPE SEWER
LIN FT
$19.42
253.00
$4,913.26
0.00
$0.00
422.00
$8,195.24
42
43
2503.603
6" PVC PIPE SEWER
LIN FT
$25.06
25.00
$626.50
0.00
$0.00
26.00
$651.56
43
44
2503.603
8" PVC PIPE SEWER
LIN FT
$20.04
1147.00
$22,985.88
0.00
$0.00
1,276.00
$25,571.04
44
45
2503.603
SANITARY SEWER INSPECTION
LIN FT
$1.00
1147.00
$1,147.00
0.00
$0.00
360.00
$360.00
45
46
2503.603
16" STEEL CASING PIPE (JACKED)
LIN FT
$122.00
90.00
$10,980.00
0.00
$0.00
80.00
$9,760.00
46
47
2504.601
TEMPORARY WATER SERVICE
LUMP SUM
$0.01
1.00
$0.01
0.00
$0.00
1.00
$0.01
47
48
2504.602
6" GATE VALVE AND BOX
EACH
$484.00
7.00
$3,388.00
0.00
$0.00
7.00
$3,388.00
48
49
2504.602
8" GATE VALVE AND BOX
EACH
$685.00
5.00
$3,425.00
0.00
$0.00
5.00
$3,425.00
49
50
2504.602
CONNECT TO EXISTING WATER MAIN
EACH
$255.00
5.00
$1,275.00
0.00
$0.00
5.00
$1,275.00
50
51
2504.602
CONNECT TO EXISTING WATER SERVICE
EACH
$205.00
4.00
$820.00
0.00
$0.00
4.00
$820.00
51
52
2504.602
1" CORPORATION STOP
EACH
$44.00
3.00
$132.00
0.00
$0.00
7.00
$308.00
52
53
2504.602
2" CORPORATION STOP
EACH
$175.00
3.00
$525.00
0.00
$0.00
4.00
$700.00
53
54
2504.602
1" CURB STOP & BOX
$90.00
3.00
$270.00
0.00
$0.00
7.00
$630.00
54
55
2504.602
2" CURB STOP & BOX
$222.00
3.00
$666.00
0.00
$0.00
4.00
$888.00
55
56
2504.602
HYDRANT
PEACH
$1,435.00
5.00
$7,175.00
0.00
$0.00
5.00
$7,175.00
56
57
2504.602
16 "X8" WET TAP
$1,710.00
3.00
$5,130.00
0.00
$0.00
3.20
$5,472.00
57
58
2504.602
PUMP
$2,460.00
1.00
$2,460.00
0.00
$0.00
1.00
$2,460.00
58
59
2504.602
RELOCATE HYDRANT & VALVE
EA
$690.00
1.00
$690.00
0.00
$0.00
1.00
$690.00
59
60
2504.603
INSTALL SPRINKLER SYSTEM
LIN FT
$3.60
500.00
$1,800.00
1,774.00
$6,386.40
1,774.00
$6,386.40
60
61
2504.603
1" TYPE K COPPER PIPE
$13.85
161.00
$2,229.85
0.00
$0.00
540.00
$7,479.00
61
62
2504.603
2" TYPE K COPPER PIPE
$26.60
45.00
$1,197.00
0.00
$0.00
59.00
$1,569.40
62
63
2504.603
6" WATER MAIN - DUCT IRON CL 52
LLINFT
$18.55
.105.00
$1,947.75
0.00
$0.00
162.00
$3,005.10
63
64
2504.603
8" WATER MAIN - DUCT IRON CL 52
$16.80
3025.00
$50,820.00
0.00
$0.00
3,129.00
$52,567.20
64
65
2504.605
4" POLYSTYRENE INSULATION
$19.20
15.00
$288.00
15.00
$288.00
26.00
$499.20
65
66
2504.620
DUCTILE IRON FITTINGS
POUND
$1.70
2500.00
$4,250.00
0.00
$0.00
2,500.00
$4,250.00
66
67
2506.501
CONST. DRAINAGE STR. DES. 48 -4020
LIN FT
$214.80
50.79
$10,909.69
0.00
$0.00
50.80
$10,911.84
67
68
2506.501
CONST. DRAINAGE S TR. DES. 60 -4020
LIN FT
$335.20
19.93
$6,680.54
0. 00
$0.00
19.92
$6,677.18
68
69
2506.501
CONST. DRAINAGE STR. DES.72 -4020
LIN FT
$392.40
12.73
$4,995.25
0.00
$0.00
12.73
$4,995.25
69
70
2506.502
CONST DRAINAGE STRUCTURE DESIGN SPEC 1
EACH
$1,130.00
27.00
$30,510.00
0.00
$0.00
28.00
$31,640.00
70
71
2506.511
RECONSTRUCT MANHOLES
LIN FT
$158.00
3.00
$474.00
11
0.00
$0.00
3.00
$474.00
71
Page 2 of 3 F:% WPWIN11210- 00XEXCELI%vouchers- .xIs1V05 , *
Line
No.
Voucher Detail
List
Contract
-._
,0.
WSB Project: 2000 Street and Utility Reconstruction Project
By.
C. Oltmanns
Project Location: Rosemount, MN
Date:
08/06/01
Project No's. City Project No. 316
Voucher:
5 (FINAL)
WSB Project No. 1210 -00
250 6.516
CASTING ASSEMBLY
Line
No.
Item
Number
Descri lion
Contract
Completed This Month
Total To Date
Line
No.
Unit
Unit Price
Quantity
Total $
Quantity
Total $
Quantity
Total $
72
250 6.516
CASTING ASSEMBLY
EACH
$380.00
2 4.00
$9,120.00
0.00
$0.00
24.00
$9,120.00
72
73
2506.522
ADJUST FRAME & RING CASTING
EACH
$180.00
8.00
$1,440.00
0.00
$0.00
8.00
$1,440.00
73
74
2506.602
CONNECT TO EXISTING STORM SEWER
EACH
$360.00
7.00
$2,520.00
0.00
$0.00
7.00
$2,520.00
74
75
2506.603
CONSTRUCT SANITARY MANHOLES
LIN FT
$193.40
60.01
$11,605.93
0.00
$0.00
51.94
$10,045.20
75
76
2511.501
RANDOM RIP RAP CLASS IV
CU YD
$59.00
13.60
$802.40
0.00
$0.00
14.00
$826.00
76
77
1 2521.604
BITUMINOUS BIKE PATH
LIN FT
$8.14
2860.00
$23,280.40
669.00
$5,445.66
3,069.001
$24,981.66
77
78
2531.501
CONCRETE CURB & GUTTER DESIGN B612
LIN FT
$10.00
250.00
$2,500.00
0.00
$0.00
340.00
$3,400.00
78
79
2531.501
CONCRETE CURB & GUTTER DESIGN B618
LIN FT
$6.65
7790.00
$51,803.50
0.00
$0.00
7,752.00
$51,550.80
79
80
2531.503
CONCRETE MEDIAN
SO Y
$18.00
23.00
$414.00
0.00
$0.00
22.00
$396.00
80
81
2531.507
6" CONCRETE DRIVEWAY PAVEMENT
SO YD
$28.00
90.00
$2,520.00
0.00
$0.00
75.00
$2,100.00
81
82
2531.507
8" CONCRETE DRIVEWAY PAVEMENT
SO YD
$32.00
705.00
$22,560.00
0.00
$0.00
817.00
$26,144.00
82
83
2545.602
RELOCATE LIGHTING UNIT
EACH
$1,000.00
1.00
$1,000.00
0.001
$0.00
1.001
$1,000.00
83
84
2557.602
RELOCATE MAILBOX
EACH
$75.00
2.00
$150.00
0.00
$0.00
2.00
$150.00
84
85
2563.601
TRAFFIC CONTROL
LUMPSUMI
$7,400.00
1.00
$7,400.00
0.00
$0.00
1.00
$7,400.00
85
86
2564.531
F &I SIGN PANELS TYPE C
SO FT
$22.75
200.25
$4,555.69
0.00
$0.00
156.50
$3,560.38
86
87
2564.602
F &1 SIGN PANELS TYPE D
EACH
$210.00
8.00
$1,680.00
0.00
$0.00
8.00
$1,680.00
87
88
2564.602
INSTALL SIGN TYPE C
EACH
$49.00
2.00
$98.00
0.00
$0.00
2.00
$98.00
88
89
2564.602
INSTALL SIGN TYPE D
EACH
$47.00
1.00
$47.00
0.00
$0.00
1.00
$47.00
89
90
2564.603
4" SOLID LINE WHITE -EPDXY
LIN FT
$0.51
6350.00
$3,238.50
5,264.00
$2,684.64
5,264.00
$2,684.64
90
91
2564.603
4" SOLID LINE YELLOW -EPDXY
LIN FT
$0.43
50.00
$21.50
0.00
$0.00
0.00
$0.00
91
92
2564.603
4" DO UBLE SOLID LINE YELLOW -EPDXY
LIN FT
$0.86
3120.00
$2, 683.20
2,204.00
$1,895.44
3,000.00
$2,580.00
92
93
2564.603
12" SOLID LINE WHITE -EPDXY
LIN FT
$6.00
24.00
$144.00
24.00
$144.00
24.00
$144.00
93
94
2564.604
ZEBRA CROSSWALK -WHITE POLY PREFORMED
SO FT
$12.32
234.00
$2,882.88
270.00
$3,326.40
270.00
$3,326.40
94
95
2565.603
4' NON - METALLIC CONDUIT
LIN FT
$9.20
200.00
$1,840.00
0.00
$0.00
220.00
$2,024.00
95
96
2571.501
WHITE PINE 6' HT B &B
TREE
$235.00
2.00
$470.00
0.00
$0.00
0.00
$0.00
96
97
2571.501
COLORADO SPRUCE 6' HT B &B
TREE
$235.00
14.00
$3,290.00
0.00
$0.00
11.00
$2,585.00
97
98
2571.501
BLACK HILLS SPRUCE 6'HT B &B
TREE
$235.00
2.00
$470.00
0.00
$0.00
4.00
$940.00
98
99
2571.502
AUTUMN BLAZE MAPLE 2.5" CAL B &B
TREE
$235.00
2.00
$470.00
0.00
$0.00
2.00
$470.00
99
100
2571.502
BUR OAK 2.5" CAL B &B
TREE
$415.00
2.00
$830.00
0.00
$0.00
1.00
$415.00
100
101
2571.505
HENRY KELSEY SHRUB ROSE, #2 CONT.
SHRUB
$35.00
2.00
$70.00
0.00
$0.00
0.00
$0.00
101
102
2571.505
ISA NTI DOGWOOD #5 CONT.
SHR UB
$40.00
2.00
$80.00
0.00
$0.00
0.00
$0.00
102
103
2571.505
ARROWWOOD VIBURNUM #5 CONT.
SHRUB
$40.00
2.00
$80.00
0.00
$0.00
0.00
$0.00
103
104
2 571.541
TRANSPLANT TREE
TREE
-
SHR UB
$250.00
$50.00
1.00
4.00
$250.00
$200.00
0.00
-..
0.00
$0.00
$0.00
0.00
-
2.00
$0.00
- -- -- -- -- --
$100.00
104
---
105
105
- - - --
2571.544
- - - -- - - - -- - - -- - - - - --
T RANSPLANT SHRUB
106
2573.501
BALE CHECK
EACH
$6.75
315.00
$2,126.25
432.00
$2,916.00
438.00
$2,956.50
106
107
2573.502
SILT FENCE, TYPE HEAVY DUTY
LIN FT
$2.00
300.00
$600.001
0.00
$0.00
326.00
$652.00
107
108
2575.505
SODDING TYPE LAWN
SO YD
$1.58
18970.00
$29,972.601
$0.00
21,220.00
$33,527.60
108
Total Schedule A 1
$785,221.16
$75,565.04
$836,490.20
Total $785,221.16 1 $75,565.04 $836,490.20