HomeMy WebLinkAbout6.c. Fee Amendments ResolutionCITY OF ROSEMOUNT
EXECUTIVE SUMMARY FOR ACTION
CITY COUNCIL MEETING DATE: FEBRUARY 20, 2001
AGENDA ITEM: FEES AMENDMENTS
AGENDA SECTION:
CONSENT
PREPARED BY: LINDA JENTINK, CITY CLERK
AGEND440:
r ��
fJ ' 't
tr
ATTACHMENTS: RESOLUTION
APPROVED BY:
J
City Council has reviewed and approved these amendments by motion at their last meeting. A resolution was
not presented with the amendments that night, so it has been brought to you this evening for approval and
execution. A resolution provides a better paper trail for our record keeping. Sorry for the inconvenience.
RECOMMENDED ACTION: Motion to approve A RESOLUTION AMENDING THE RATES AND
FEES FOR 2001, RESOLUTION 2000 -139.
COUNCIL ACTION:
r
r
CITY OF ROSEMOUNT
DAKOTA COUNTY, MINNESOTA
RESOLUTION 2001
AMENDING THE RATES AND FEES FOR 2001, RESOLUTION 2000 -139
WHEREAS, the City Council has reviewed the 2000 fee schedule and recognizes the need to amend
certain rates and fees for 2001; and
WHEREAS, staff has found three areas where further amendments are recommended; and
WHEREAS, City Council did review and approve these amendments at the February 6, 2001,
regular meeting by motion.
NOW, THEREFORE, BE IT RESOLVED, that the City Council of the City of Rosemount hereby
approved the rates and fees for 2001 as outlined in Appendix I and Appendix II and further approves
the addition of language in the water, sanitary sewer and storm water capital charges section to insure
collection of connection charges; to include charges for window replacement under Building Fees;
and increase fees for the auditorium with the banquet room and adjoining lobby for Class 2, 3, and
4. See attachment.
ADOPTED this 20th day of February, 2001.
Cathy Busho, Mayor
ATTEST:
Motion:
Voted In Favor:
Second:
Voted Against:
Linda Jentink, City Clerk
Members Absent:
4. Water, Sanitary Sewer and Storm Water Capital Charges
A. Metropolitan Council Environmental Services Availability Charge (Metro SAC)
Per Sac Unit, as determined by the MCES, $1,150.00
collected by the City with the building permit
B. City Sanitary Sewer Availability Charges
a.) For all developments with final plat approval prior to January 1, 2000:
Per Sac Unit as determined by the MCES and
collected with the building permit per the schedule as follows:
Single Family (SF) Detached $1,442
Mobile Homes $1,442
SF Attached with Individual Laundry $1,442
Apartments, Condo, & SF Attached with Central
Laundry Facilities $1,164
Public /Institutional, Industrial, Commercial $1,442
b.) For all developments with final plat approval after January 1, 2000.
CITY SANITARY
Trunk Area Assessments
Per SAC Unit as determined by
SEWER CHARGES
collected with final
the MCES and collected with the
lat/subdivision agreement
Building Permit
Single Family Residential
$927.00 per acre
$1,030.00
Multi- Family Residential
$927.00 per acre
$1,030.00
Institutional
$927.00 per acre
$1,030.00
Commercial
$927.00 per acre
$1,030.00
Industrial
$927.00 per acre
$1,030.00
Any part of the Trunk Area Assessment that is not collected with a plat /subdivision agreement will be collected
as a connection charge, in addition to any other connection charge established by this resolution, prior to
connection to the sanitary sewer system.
C. City Water Availability Charges
a.) For all developments with final plat approval prior to January 1, 2000:
Per Sac Unit as determined by MCES and collected with the Building Permit as follows:
Single Family (SF) Detached $ 2,266
Mobile Homes $ 2,266
SF Attached with Individual Laundry $ 2,266
.6
OR:
1"
Meter
$ 5,150
1 %Z —
Meter
$ 7,725
2
Meter
$10,300
2%i —
Meter
$12,875
3
Meter
$15,450
4
Meter
$18,025
6"
Meter
$20,600
b.) For all developments with final plat approval after January 1, 2000:
1. Trunk area assessments collected with final plat/subdivision agreement as follows:
All zoning types $3,465.00 per acre
Any part of the Trunk Area Assessment that is not collected with a plat /subdivision
agreement will be collected as a connection charge, in addition to any other connection
charge established by this resolution, prior to connection to the water system.
2. And Water Access Charge collected with the Building Permit as follows:
Single Family Res.
Trunk Area
Assessments to be
collected from
Developers on all
newly developed
Multi - Family Res.
1
Meter
1 %2"
Meter
2
Meter
2% "—
Meter
3"
Meter
4
Meter
6"
Meter
$ 1,155.00
$ 1,155.00
$ 5,250.00
$ 7,875.00
$10,500.00
$13,125.00
$15,750.00
$18,375.00
$21,000.00
D. Storm Water Charges
a. For this charge, Newly Developed Properties are defined as any property, including platted or
unplatted parcels, which are improved with buildings, grading, or otherwise creating an impervious
surface.
STORM WATER
CHARGES
Trunk Area
Assessments to be
collected from
Developers on all
newly developed
Connection Charges (STAG) collected
with the Building Permit on all Newly
Developed properties
properties
Single Family (Urban)
$2,970 per acre*
$ 935 per lot
Single Family (RR)
$ 440 per acre*
$ 935 per lot
Multiple Family
$3,850 per acre*
$ 660 per housing unit (4 plex =4 units)
Public/Institutional
$3,850 per acre*
$3,850 per acre of impervious surface
Commercial
$4,070 per acre*
$4,070 per acre of impervious surface
Industrial
$4,070 per acre*
$4,070 per acre of impervious surface
`Acres are defined as gross acres of developable property minus pond acreage (at high water level) and wetlands
at delineation line, rounded to the nearest one tenth (1 /10th) of an acre.
A
Any part of the Trunk Area Assessment that is not collected with a plat /subdivision agreement will be collected
as a connection charge, in addition to any other connection charge established by this resolution, prior to
issuance of a Certificate of Occupancy for use of any property.
b. Connection Charges (STAG) Collected with the Building Permit on all newly developed properties that
have not paid trunk area assessments listed below (Gross Area):
Single Family
Multiple Family
Public/Institutional
Commercial
Industrial
$1,870 per lot
$7,700 per acre
$7,700 per acre
$8,140 per acre
$8,140 per acre
BUILDING PERMITS AND FEES (pg. 17)
Window Replacement (same size for same size) $47.50
Altered size based on remodel project cost
Community Center Auditorium Fees (pg 3 of Appendix II)
1. Auditorium
Auditorium with the banquet room and adjoining lobby *: (all day fee)
Fee Class Saturday Friday Weekday (Sun- Thurs) **
Fee Fee Fee
Class 1 Fees based upon directly cleaning and set -up costs and other costs directly
associated with the event.
Class 2 $650 $600 $300
Class 3 $750 $700 $350 4-
Class 4 $850 $800 $600
* A $10.00 per hour fee will be assessed if using additional audio visual
equipment other than microphones and standard lighting.
* * Add $100 for Sunday - Thursday rentals scheduled past 10 :00 p.m.
E
CITY OF ROSEMOUNT
EXECUTIVE SUMMARY FOR ACTION
CITY COUNCIL MEETING DATE: FEBRUARY 6, 2001
AGENDA ITEM: PROPOSED FEES AMENDMENT
AGENDA SECTION:
NEW BUSINESS
PREPARED BY: Thomas D. Burt, City Administrator
AGENDA NO:
ATTACHMENTS: DRAFT, LETTER FROM CITY ATTORNEY
APPROVED BY:
Assessment Clarification
Our City Attorney, Charlie LeFevere, suggested changes to the City's fee resolution to allow for collection of
trunk area assessments that are not collected with the subdivision agreement. This is additional language (noted
by italics) in the draft of pages 5 to 7.
Staff agrees with Attorney LeFevere that it would be in our best interest to incorporate this language into the
2001 Fee Resolution.
Building Fees
Building Official Kaehler believes that all window replacements in residential housing need an inspection to
insure they are installed correctly. Staff requests that a fee of $47.50 be required for window replacement (same
size for same size) and that if the size is altered, the fee would be based on the project cost. Several (or all)
windows could be replaced for the fee of $47.50 if none of the sizes are altered.
This change would be added to page 16.
Community Center Auditorium Fees
The weekday fees (Sunday — Thursday) were missed for an increase for 2001 for the auditorium with the
banquet room and adjoining lobby found on page 3 of Appendix II, the Rosemount Parks & Recreation Fees
and Fee Policy.
Class 2 from $225 to $300
Class 3 from $275 to $350
Class 4 from $550 to $600
RECOMMENDED ACTION: Motion to add additional language to pages 5, 6, and 7 for Trunk Area
Assessments, Appendix I; and add a fee of $47.50 for window replacement on page 16 of Appendix I; and
increase Weekday Fee for use of the auditorium with the banquet room and adjoining lobby on page 3 of
Appendix II; for the 2001 Fee Resolution.
COUNCIL ACTION: