The Utility Commission has been working through stormwater issues related to the July, 2000
storm since last July. Through this process it was determined that the Stormwater
Management Plan should be updated to address policy and financial issues that are facing the
City in regard to stormwater. Because of Rosemounts rolling terrain, providing positive outlets
to the City's numerous ponds is very expensive. Further, the financial analysis of how these
improvements will be funded is not currently based on the available developable property.
These and many other policy issues need to be addressed to better set the course for how the
City deals with stormwater into the future. This work plan involves significant policy
development that should involve the City Council, but will help serve the City's goals for
stormwater management.
The Utility Commission has recommended moving forward with the update and is requesting
Council authorization.
The financial analysis is proposed to be completed by Springsted and will include a 20 -year
financing plan and a recommendation for short and long -term trunk and utility fees.
RECOMMENDED ACTION: MOTION TO APPROVE THE WORK PLAN AS ADAPTED AND
AUTHORIZE THE EXPENDITURE OF FUNDS FROM STORM SEWER UTILITY OR CORE FUND.
COUNCIL ACTION:
4
?1
iV1ir
s A I
a
763
February 5, 20001
Rosemount Utility Commission and
Honorable Mayor and City Council
City of Rosemount
2875145 Street West
Rosemount, MN 55068 -4997
Re: Work Plan Associated with Update of City's Stormwater Management Plan
WSB Project No. 1275 -00
Dear Utility Commission Members and Honorable Mayor and City Council:
As requested by the Utility Commission at theirmeeting on January 8, 2001, outlined below is a work
plan that outlines the activities associatedwith updating selectedportions of the City's Stormwater
Management Plan. The tasks associated with this work plan are focused on:
2.
3.
4.
5.
6.
Updating the City's policies regarding storm water management.
Providing a detailed review and analysis of the flood problem areas not previously
addressed and developing proposed solutions. based on updated City policies.'
Updating the City's trunk storm water drainage system design and layout to reflect the
updated policies and allow for the construction of proj ects that address drainage needs
throughout the City in the future.
Updating the costs associated with the future construction of the trunk storm drainage
system.
Developing a fundh*financing plan that will assurethe City has adequate financial resources
to construct, in a timely manner, the future trunk system improvements that are necessary.
Developing an implementation plan.
Outlined below, please find a more detailed description of the work plan.
Task 1:
Update the City's policies regarding storm water management:
As part of this task, WSB will review the policies and design standards that were utilized
to develop the City's current Storm Water Management Plan and define whether or not
those standards are currently adequate to meet the City's needs. As part of this effort,
policies will be presented to the Commission and/or Council that outline options for
managing water quality, water quantity, storm water runoff volumes, the funding of
improvements, and other related issues. Trade -offs will be discussed concerning the
benefits and impacts associated with increasing discharge rates, decreasing discharge rates,
acquiring storm water storage are;, purchasing property and/or homes as opposed to
building improvements to protectmuc=es. Policies regarding how the City should address
the loss of vegetation aroundponding systems and other related issues will also be defined
Minneapolis - S_ C oud - Equal Opportunity EmFioVT�W1275- 00\020701 tail comethmc.wpd
Rosemount Utility Commission and
Honorable Mayor and City Council
February 5, 2001
Page 2
Task 2: Provide a detailed review and analysis of the flood problem areas not previously
analyzed and develop proposed solutions based on updated City policies:
Once the City Council's and Utility Commission's perspectives regarding storm water
management policies are formulated, an updated analysis ofthe City's flood problem areas
will be undertaken, paying specific attention to addressing the flood problem areas in light
of the updated policies.
Task 3: Update the City's trunk storm water drainage system design and layout to reflect
the updated policies and flood problem area analyses:
Based on the updatedpolicies and analysis of problem areas, the trunk system design and
layout will be updated as necessary to reflect existing and future needs for the City.
Task 4: Update the costs associated with the future construction of the trunk storm
drainage system:
The costs associated with constructing the future segments ofthe trunk drainage system will
be estimated as part of this task.
Task 5: Develop a funding/financing plan that will assure the City has adequate financial
resources to construct future trunk system improvements that are required in a
timely manner:
Based on the costs developed in Task 4 that are associated with the construction of the
trunk drainage system, and the development of a plan that will specify when the various
improvements will be constructed, a funding/financing plan will be prepared with the
assistance ofthe City's financial consultant. This plan will identify the specific sources of
revenue that will be utilized to fund the various capital improvements and/or maintenance
costs, as well as identify to what extent bonding will be needed to implement these
improvements.
Task 6. Develop implementation plan:
As part of this task, information developed from Tasks 1 through 5 will be compiled and
summarized In addition, the implementation plan will clearly define or outlinethefollowing:
A prioritized listing ofthe projects that will need to be constructedthroughout the City
of Rosemount between now and when it is fully developed.
Preliminary estimate of cost for each of these projects.
The anticipated date for which the prof ect is anticipatedto be constructed and/or the
activities that would need to be undertaken to trigger the need for the project.
F: \WPWM1275- 00\020701 utilcommhmcwpd
Rosemount Utility Commission and
Honorable Mayor and City Council
February 5, 2001
Page 3
• A description ofhowthe City intends to address drainage problems m areas for which
capital improvement projects are not able to be constructed in the short term.
• The revenue sources and financing plan for the implementation of these projects.
The cost associated with the preparation of the information outlined above is estimated at $45, 740.
A breakdown of the hours and costs associated with this. work plan is attached, along with an
anticipated schedule for completion of this work.
We look forward to discussing this work plan with you further. If you have any questions, please do
not hesitate to contact me at (763) 287 -7188.
Sincerely,
WSB & Associates, Inc.
Peter R. Willenbring, P.E.
Vice President
nm
FAWPVMAI2 00\020701 util comet hmc wpd
t
City of Rosemount
Stormwater Management Plan Update
Estimate of Cost
Project Principal
pproxtmate
$99
Task Estimated Hours
Billing Rate
Subtotal
40
$0
Project Principal 40
$99
$3,960
Project Manager
$83
$0
Project Engm
$72
$0
Engineering Tecbni ' 20
$65
51.300
Project Principal
60
$99
$99
$5,940
Project Mang
40
$0
$83
$3,320
Project Engineer
$0
Engineering Technician
$72
$0
Engineering Technician
60
40
$65
$3,900
subtotal
160
1
Project Principal
$13,160
4
$5,940
Project Manager
$83
$0
Project Engineer
$72
$0
Engineering Techni '
$65
Project Principal
411
60
$99
$3,960
Project Mang
40
$83
$3,320
Project Engineer
$72
$0
Engineering Technician
40
$65
$2,600
Subtotal
120
$9,880
X 20
Project Principal
$99
$1,980
Project Manager
20
$83
$1,660
Project Eagin
$72
$0
En ' eerie Teclmici
60
$65
$3,900
subtotal
80
1 17 sIn
Project Principal
40
$99
$3,960
Project Mgt
$83
$0
Project Engineer
$72
$0
Engineering Technician
$65
$0
Subtotal
40
$3,960
. _.,
>� w
Project Principal
60
$99
$5,940
Project Manager
$83
$0
Project Engineer
$72
$0
Engineering Techni '
$65
$0
Subtotal
60
$5
ESTIMATED PROJECT HOURS & COST 520 $45,740
W: 001CostEst020501 /Cost Est
City of Rosemount
Stormwater. Management Plan Update
Schedule
WA 275- 00 /CostEW20501 rrimellne