CITY OF ROSEMOUNT
�9 EXECUTIVE SUMMARY FOR ACTION
CITY COUNCIL MEETING DATE: March 20, 2001
AGENDA ITEM: Payment #3 & Final — Trunk Highway 3
AGENDA SECTION:
Commercial Area Design Enhancement Plan, City Project #314
Consent
PREPARED BY: Rich Lonnquist, Senior Engineering Technician
AGEN
6
ATTACHMENTS: Payment Voucher #3 and Final
APPROVED BY:
This item requests the third and final payment to McNamara Contracting, in the amount of
$31,037.63 for City Project #314, Trunk Highway 3 Commercial Area & Design Enhancement
Plan.
This project is now 100% complete, only punch list items remain and will be done in the
spring. The job was about $3,000 under budget.
Upon final payment a two -year warranty period begins. The City also accepts these facilities
for perpetual maintenance.
Attached is Construction Pay Voucher #3 and Final for your information. Staff and WSB
recommends approval of this payment and perpetual maintenance.
RECOMMENDED ACTION: MOTION TO APPROVE PAYMENT #3 AND FINAL TO
McNAMARA CONTRACTING IN THE AMOUNT OF $31,037.63 FOR TRUNK HIGHWAY NO. 3
COMMERCIAL AREA AND DESIGN ENHANCEMENT PLAN, CITY PROJECT #314 AND
ACCEPT THE STREETS AND UTILITIES FOR PERPETUAL MAINTENANCE.
COUNCIL ACTION:
1
a .w .y {q;Q Gll'.+a•T`�'�',35�:,
Voucher No. 3 (Final)
WSB Project No: 1191 -00
Date: March 2, 2001
Period Ending: March 2, 2001
Project: TRUNK HIGHWAY NO.3 COMMERCIAL AREA & DESIGN ENHANCEMENT PLAN
CITY OF ROSEMOUNT PROJECT NO. 314
S.P. 1921 -72
MCNAMARA CONTRACTING
5001 160TH ST W
Contractor. ROSEMOUNT, MN 55068
Contract Date:
Completion Date:
Work Started:
Work Completed:
OI'
rgrnal Contract Amount
5365,177.60
Total Additions
$0. 00
Total Deductions
$0.00
Total Funds Encumbered
$365.177.60
Total Work Cert'if'ied to Date
Less Retalned Percentage
0.00
$362,248.22
Less Previous Payments
$0.00
Total Payments Incl. This Voucher
$362,24822
$331,210.59
Balance Carried Forward
$2,92938
Approved for Payment This Voucher
1 37.63
Approvals
WSB & Associates, Inc.
In accordance with field observation, as performed in accordance with industry standards, and based on our professional opinion, the
materials installed are satisfactory and the work properly performed in accordance with the plans and specifications.
The total work estimated to be completed as of March 2. 2001 is as indicated herein and we hereby recommend
payment of this voucher. 9e E
Signed: Signed:
Construction Observer Project Manager /Engineer
McNamara Contracting
This is to certify that to the best of my knowledge, information, and belief, the quantities and values of work certified herein is a fair
approximate estimate for the period covered by this voucher.
Contractor: Signed:
Tide:
Cantr2ctor. Signed:
Date:
Title:
City of Rosemount
Checked by: Approved for Payment;
Authorized Representative
Date:
Data: