HomeMy WebLinkAbout7.b. Receive Bids/Award Contract for Marcotte Pond Lift Station Improvements, City Project #338CITY OF ROSEMOUNT
EXECUTIVE SUMMARY FOR ACTION
CITY COUNCIL MEETING DATE: November 20, 2001
AGENDA ITEM: Receive Bids /Award Contract - Marcotte Pond
AGENDA SECTION:
Lift Station Improvements City Project #338
Old Business
PREPARED BY: Bret Weiss, Interim City Engineer
AGENT
,4 ,
ATTACHMENTS: TENTATIVE BID RESULTS, f Ina Is on
APPROVED BY:
Nov. 20
r N
On Friday, November 16, 2001, bids for the above referenced project will be received and read aloud
publicly.
The tabulation of bidders, resolution and letter of award recommendation will be provided at the
Council meeting.
RECOMMENDED ACTION: MOTION TO ADOPT A RESOLUTION RECEIVING BIDS AND
AWARDING CONTRACT FOR MARCOTTE POND LIFT STATION IMPROVEMENTS CITY
PROJECT #338.
COUNCIL ACTION:
i
Page 1 of 2 '
Ten vC, IOAM
Bidders List 01323 -00 Contractor Count: 22
Client: Rosemount MN Bid Date:
Project Descr: Marcotte Pond Lift Station
and Forcemain Feasibility Study Project Engineer: Mark A Erichson Bid Time:
Engineer's Estimate: $0.00
Thursday, November 15, 20012:33:52 PM
Contractor
Bid Bond 5%
Addendum O
Total Base Bid
Automatic Systems Co.
Barbarossa & Sons, Inc.
Braun Pump & Controls, Inc:
Davies Water Equipment
Electric Pump Co.
Electrical Installation & Maintenance
Elk River Concrete
Great Western Corp.
Jay Brothers
Landwehr Cosntruction, Inc.
Magney Construction, Inc.
Minnesota Pipe & Equipment
Moorhead Construction Co, Inc.
Municipal Contracting Services
Quality Flow Systems, Inc.
Richard Knutson, Inc.
Ryan Contracting Co.
/
V
o O
S. M. Hentges & Sons, Inc.
Telemetry & Process Controls
0
J
� I I
http:// wsb3/ RtCivil /ph_EngBidder.a,sp ?WorkOrderld =373 11 /15 /O1
Contractor
Total Bid Price
Adjustment for
Accepted Alternates
Total Adjusted
Bid Price
Barbarossa and Sons, Inc.
$294,085.00
Zero
$294,085.00
Landwehr Construction, Inc.
$282,136.00
Zero
$282,136.00
Magney Construction, Inc.
$328,970.00
Zero
$328,970,00
Richard Knutson, Inc.
$320,864.00
None Offered
$320,864.00
Barbarossa and Sons, Inc. and Richard Knutson, Inc. were considered non - responsive, as
:hey did not complete the proposal form as stipulated in the project manual. Neither would
lave been the low bidder.
Minneapolis • St. Cloud • Equal Opportunity Employer FAWPWINV323- 00112001- hmcc.doc
Honorable Mayor and City Council
November 20, 2001
Page 2
The total project includes the forcemain that was previously designed, bid, and constructed
for a construction cost of $156,500. Added to'this bid are miscellaneous controller costs of
$15,000 and the yet undetermined cost to get electrical power to the site. Currently with
this bid the estimated construction cost is $64,000 under the feasibility report cost.
The bid format on the project allowed the contractors to propose various "alternate"
equipment items for consideration. The attached bid tabulation summarizes the alternate
equipment offerings and shows deducts, if any, for incorporating them into the project.
Based upon the information we have reviewed, we recommend the City of Rosemount
make a contract award to Landwehr Construction, Inc. as the apparent low, responsive,
responsible bidder.
Sincerely,
WSB & Associates, Inc.
Is
UJ; MI
Bret A. Weiss, P.E.
President
Enclosure
sb
F: \WPWINV 323-00 112001 -hmcc. doc
Extension of
Bids
• }............v:.....,.::v:. v. �.v.� :•.� h; :......::. v::•. � :.� }k::• }::v?•: ?:? ^ } }:? + } }•y >;: } :M , ':v: %w:.•: v •::::::, }•• % � %: }iii: : e ... nv.:::, ;+ .. /...:..,. n. } ...
LINE
PROJECT: Marcotte Pond Lift Station and Appurtenant Work
Landwehr Construction
LOCATION: Rosemount, Minnesota
UNIT
PRICE
CHECKED: S. Buckley
UNIT
PROJECT NO(S).: 1323 -00
NUMBER
DATE: November 19, 2001
UNIT
ESTIMATED
QUANTITY
DENOTES CORRECTED FIGURE.
COST
PRICE
$282,136.00
$294,085.00
i
{
LOW BIDDER
2ND LOW BIDDER
_ 1
_ _
2021 501
._....
.
MOBILIZATION
. .. ......... ........... ..........._.... .........._ ...._ ._ . ....._._
LUMP SUM
_ ..... . .._-
. 1.00
$6,000.00
$6,000.00
$5,500.00
$5,500.
2
2104.501
REMOVE CONCRETE CURB AND GUTTER
LIN FT
, _._... _,_
70.00
-
$5.00
_ . ._- - - --
$350.0
- ... �.
$5.00
.. ....__ - ._..
$350.00
3
2105.521
GRANULAR BORROW (LV)
I CU YD
50.00
GRAND TOTAL $282,136.00 $204,085.00
FAW PW INV 323- 00'EXCELSd Tab\Bid Detail Page l of 2
LINE
ITEM
Landwehr Construction
Barbarossa and Sons
UNIT
PRICE
UNIT
NO
NUMBER
DESCRIPTION
UNIT
ESTIMATED
QUANTITY
COST
PRICE
COST
i
{
_ 1
_ _
2021 501
._....
.
MOBILIZATION
. .. ......... ........... ..........._.... .........._ ...._ ._ . ....._._
LUMP SUM
_ ..... . .._-
. 1.00
$6,000.00
$6,000.00
$5,500.00
$5,500.
2
2104.501
REMOVE CONCRETE CURB AND GUTTER
LIN FT
, _._... _,_
70.00
-
$5.00
_ . ._- - - --
$350.0
- ... �.
$5.00
.. ....__ - ._..
$350.00
3
2105.521
GRANULAR BORROW (LV)
I CU YD
50.00
$15.00
$750.0
$20.00
$1,000.00
4
2105
__ _..._.. .
}TOPSOIL BORROW (LV)
_ ___.
CU YD
50.00
$20.00
$1,000.
$16.00 '
$800.00
5
2112.602
_.. _. ..__. _ ..._..
ISUBGRADE PREPARATION
1
SQ YD
350.00
$3.00
$1,050.0
$2.00
$700.0
6
2331.601
BITUMINOUS DRIVEWAY PAVEMENT
SQ YD
350.00
$20.00
$7,000.0
$29.00
$10,150.00
7
I DIV 2
-
36 RC PIPE
- ........ ..... ..... . ......_ -_.. ., ......._ _ . ....__�_ . -__-- -
LIN FT
..... - _..
130.00
_.... _
$93.00
$12,090.
$80.00
$10,400.00
8
2503.603
12" CORRUGATED PE PIPE SEWER
LIN FT
.... --
100.00
- . __ . .. . . .
$26
, 00
$2600.
$48.00
I $4,800.0
9
' 2511.501
RANDOM RIP RAP CLASS IV (WIFABRIC)
CU YD
8.00
$70.00
$560.0
$95.00
$760.
10
DIV 2
STORM WATER LIFT STATION, VALVE MANHOLE, AND
LUMP SUM
1.00
$237,241.00
IAPPURTENTANT WORK
I
$237,241.00
$224,000.00
$224,000.00
11
2531.501
CONCRETE CURB AND GUTTER, TYPE 8618
LIN FT
70.00
$16.00
$1,120.0
$35.00
$2,450.00
12 I
2563 601 !TRAFFIC
CONTROL
LUMP SUM
1.00
$675.00
$675.00
$2,500.00
$2,500.00
13
2573.502
SILT FENCE, TYPE HEAVY DUTY
LIN FT
200.00
$2.50
$500.0
_ $4.00 I
$800.0
14
2575.501
SEEDING, MIX 130B (INCL TOPSOIL, TYPE 1 MULCH & ANCHOR)
ACRE
0.50
$3,000.00
$1,500.0
$1,750.00
$875.00
15
2575.505
SODDING TYPE LAWN (INCL TOPSOIL, FERTILIZER, AND, DISK
(ANCHORING)
SQ YD
800.00
$5.50
$4,400.0
$5.00
$4,000.00
16
DIV 2 jINTAKE
SKIMMER STRUCTURE WITH RIP RAP
LUMP SUM
1.00
$5,300.00
$5,300.00
$25,000.00
$25,000.0
TOTAL
$282,136.0
�
$294,085.00
FAW PW INV 323- 00'EXCELSd Tab\Bid Detail Page l of 2
Extension of Bids
.r.•F.:..... «..::. .•. .... r: :::•:::'. r..: :•1i. .:.': � • }:. }:. }: }:S•: } }}.5::,:r S +..,;� ;., ...... S:•: {..:..vv•
v..:..:•.:::r..... C.:. xvw.: v:. rv:• �:• i i::' is ii: • : • i' i< �}:•}}}: 4:•: 4: i:• ii::.: w::. 4iSS. hv. � :Yi }:.k..:.:......:.. v.:xv::: >.•.i•:x::.:::: i�: v}: r:•:-::. 6 : {: { {S<4 ?x{•: {• }: :.. } }; :.{.
PROJECT: Marcotte Pond Lift Station and Appurtenant Work
LOCATION: Rosemount, Minnesota CHECKED: S. Buckley
PROJECT NO(S).: 1323-00 DATE: November 19, 2001
°,x DENOTES CORRECTED FIGURE. $320,864.00 $328,970.00
3RD LOW BIDDER
GRAND TOTAL $320,864.00 $328,970.00
FAW PW IN11323- 00\EXCEL\Bid Tab\Bid Detail Page 2 of 2
4TH LOW BIDDER
LINE
ITEM
Richard Knutson, Inc.
Magney Construction; Inc.
UNIT
PRICE
COST
UNIT
PRICE
COST
NO
NUMBER
DESCRIPTION
UNIT
ESTIMATED
QUANTITY
Y
2021 501
__. ..... .
MOBILIZATION
....._ _ ... _ ......._.._.. -
LUMP SUM
... . _..
1.00
$4,000.00
$4,000.00
$16,000.00
$16,000.00
2
2104.501
REMOVE CONCRETE CURB AND GUTTER
LIN FT
70.00
_ _
$10.00
$700.00
$10.00
$700.0
3
2105,521
GRANULAR BORROW (LV)
CU YD
50.00
$15.00
$750.0
$17.00
$850.0
4
2105.525
_. .
TOPSOIL BORROW (LV)
. _- ...... ..__ ......._ ... ....... --- --_. . . -
CU YD
.,. __. __......
50.00
_ ._
$15,00
$750.00
$21.00
$1,050.00
5
2112.602
SUBGRADE PREPARATION
SQ YD
.
350.00
r
$2.00
_ - - _
$700.00
-- ----
$4.00
$1,400.00
6
2331.601
BITUMINOUS DRIVEWAY PAVEMENT
SQ YD
350.00
$22.00
$7,700.0
$23.00
$8,050.0
7
DIV 2
36 RC PIPE
LIN FT
130.00
8
2503.603
12" CORRUGATED PE PIPE SEWER
LIN FT
100.00
.
$25.00
$2,500.00
$40.00
$4,000.0
9
2511.501
RANDOM RIP RAP CLASS IV (W /FABRIC)
CU YD
8.00
$90.00
$720.00
$70.00
$560.0
10
DIV 2
STORM WATER LIFT STATION, VALVE MANHOLE, AND
APPURTENTANT WORK
LUMP SUM
1.00
$257,884.00
$257,884.00
$263,000.00
$263,000.0
11
2531.501
CONCRETE CURB AND GUTTER, TYPE B618
LIN FT
70.00
$15.00
$1,050.00
$20.00
$1,400.00
12
2563.601
........... -
TRAFFIC CONTROL
- ---. . . .... ......... . ............... ...
_. .. . ... _. .. - ..._ ..... - _....:._
LUMP SUM
_._ ......
1.00
$4,500.00
$4,500.00
$500.00
$500.00
13
2573.502
SILT FENCE, TYPE HEAVY DUTY
LIN FT
_
200.00
- ..... _.. -
$5.00
- _
$1,000
_ - ._.:_ -
$4.00 ...
._ __.... .
$800.0
14
2575.501
SEEDING, MIX 130B (INCL TOPSOIL, TYPE 1 MULCH & ANCHOR)
ACRE
0.50
$3,000.00
$1,500.00
- $6,000.00
$3,000.00
15 2575.505 SODDING TYPE LAWN (INCL TOPSOIL, FERTILIZER, AND DISK
ANCHORING) SQ YD 800.00
$4.00
$3,200.0
$3.50
$2,800.0
16 DIV 2 INTAKE SKIMMER STRUCTURE WITH RIP RAP LUM UM 1.00
$10,250.00
$10,250.0
$3,800.00
$3,800.0
TOTAL
$320,864.00
$328,970.0
Basis of Bid Evaluation Form
for
Rosemount, Minnesota
Marcotte Pond Lift Station and Appurtenant Work
Bid Date: November 16, 2001
City of Rosemount Project No. 338
WSB Project No. 1323-00
1. Contractor: Barbarossa and Sons, Inc.
t
2. Proposed Alternate Equipment Stormwater Lift Station
Non -clog Centrifugal Pumps
(Fairbanks Morse)
Division 2 — Section 11
3. Relevant Specifications and/or Comments: Pump size and horsepower do not
meet minimums specified. No
further review made.
4. Installed Price: $43,000.00
5. Increase/ to Total Bid Price: $5,000.00
6. Accepted/Rejected Rejected
7. Revised Total Bid Price: None
Basis of Bid Evaluation Form'
for
Rosemount, Minnesota
Marcotte Pond Lift Station and Appurtenant Work
Bid Date: November 16, 2001
City of Rosemount Project No. 338
WSB" Project No. 1323-00
1. Contractor: Landwehr Construction, Inc.
2. Proposed Alternate Equipment: Stormwater Lift Station
Non -clog Centrifugal Pumps
(Fairbanks Morse)
Division 2 — Section 11
3. Relevant Specifications and/or Comments: Pump size and horsepower do not
meet minimums specified. No
further review made.
4. Installed Price: $44,622.00
5. Increase/ to Total Bid Price: $6,708.00
6. Accepted/Rejected Rejected
7.- Revised Total Bid Price: None
FAWPWIMI323 -OMOB Evaluation Form- Landwehr.doc
Basis of Bid Evaluation Form
for
Rosemount, Minnesota
Marcotte Pond Lift Station and Appurtenant Work
Bid Date: November 16, 2001
City of Rosemount Project No. 338
WSB Project No. 1323-00
1. Contractor: - Magney Construction, Inc.
2. Proposed Alternate Equipment: Stormwater Lift Station
Non -clog Centrifugal Pumps
(Fairbanks Morse)
Division 2 — Section 11
3. Relevant Specifications and/or Comments: Pump size and horsepower do not
meet minimums specified. No
further review made.
4. Installed Price: $45,000.00
5. Increase/ to Total Bid Price: $5,000.00
6. Accepted/Rejected Rejected
7. Revised Total Bid Price: None
FAWPWIM1323- 001BOB Evaluation Form- Magney.doc
CITY OF ROSEMOUNT
DAKOTA COUNTY, MINNESOTA
RESOLUTION 2001 —
A RESOLUTION RECEIVING BIDS AND AWARDING CONTRACT
FOR MARCOTTE POND LIFT STATION IMPROVEMENTS
CITY PROJECT #338
BE IT RESOLVED, by the City Council of the City of Rosemount, Minnesota, as follows:
1. All bids on construction of the Marcotte Pond Lift Station Improvements are hereby
received and tabulated.
2. The bid of Landwehr Construction, Inc., in the amount of $282,136.00 for the
construction of said improvements are in accordance with the plans and specifications
and advertisement forbids is the lowest responsible bid and shall be and hereby is
accepted.
3. The Mayor and Clerk are hereby authorized and directed to enter into a contract with said
bidder for the construction of said improvements for and on behalf of the City of
Rosemount.
4. The City Clerk is hereby authorized and directed to return forthwith to all bidders the
deposits made with their bids, except that the deposit of all successful bidder and the next
two lowest bidders shall be retained until a contract has been executed.
ADOPTED this 20 day of November, 2001.
Cathy Busho, Mayor
ATTEST:
Linda Jentink, City Clerk
Motion by: Seconded by:
Voted in favor:
Voted against: