Loading...
HomeMy WebLinkAbout7.b. Receive Bids/Award Contract for Marcotte Pond Lift Station Improvements, City Project #338CITY OF ROSEMOUNT EXECUTIVE SUMMARY FOR ACTION CITY COUNCIL MEETING DATE: November 20, 2001 AGENDA ITEM: Receive Bids /Award Contract - Marcotte Pond AGENDA SECTION: Lift Station Improvements City Project #338 Old Business PREPARED BY: Bret Weiss, Interim City Engineer AGENT ,4 , ATTACHMENTS: TENTATIVE BID RESULTS, f Ina Is on APPROVED BY: Nov. 20 r N On Friday, November 16, 2001, bids for the above referenced project will be received and read aloud publicly. The tabulation of bidders, resolution and letter of award recommendation will be provided at the Council meeting. RECOMMENDED ACTION: MOTION TO ADOPT A RESOLUTION RECEIVING BIDS AND AWARDING CONTRACT FOR MARCOTTE POND LIFT STATION IMPROVEMENTS CITY PROJECT #338. COUNCIL ACTION: i Page 1 of 2 ' Ten vC, IOAM Bidders List 01323 -00 Contractor Count: 22 Client: Rosemount MN Bid Date: Project Descr: Marcotte Pond Lift Station and Forcemain Feasibility Study Project Engineer: Mark A Erichson Bid Time: Engineer's Estimate: $0.00 Thursday, November 15, 20012:33:52 PM Contractor Bid Bond 5% Addendum O Total Base Bid Automatic Systems Co. Barbarossa & Sons, Inc. Braun Pump & Controls, Inc: Davies Water Equipment Electric Pump Co. Electrical Installation & Maintenance Elk River Concrete Great Western Corp. Jay Brothers Landwehr Cosntruction, Inc. Magney Construction, Inc. Minnesota Pipe & Equipment Moorhead Construction Co, Inc. Municipal Contracting Services Quality Flow Systems, Inc. Richard Knutson, Inc. Ryan Contracting Co. / V o O S. M. Hentges & Sons, Inc. Telemetry & Process Controls 0 J � I I http:// wsb3/ RtCivil /ph_EngBidder.a,sp ?WorkOrderld =373 11 /15 /O1 Contractor Total Bid Price Adjustment for Accepted Alternates Total Adjusted Bid Price Barbarossa and Sons, Inc. $294,085.00 Zero $294,085.00 Landwehr Construction, Inc. $282,136.00 Zero $282,136.00 Magney Construction, Inc. $328,970.00 Zero $328,970,00 Richard Knutson, Inc. $320,864.00 None Offered $320,864.00 Barbarossa and Sons, Inc. and Richard Knutson, Inc. were considered non - responsive, as :hey did not complete the proposal form as stipulated in the project manual. Neither would lave been the low bidder. Minneapolis • St. Cloud • Equal Opportunity Employer FAWPWINV323- 00112001- hmcc.doc Honorable Mayor and City Council November 20, 2001 Page 2 The total project includes the forcemain that was previously designed, bid, and constructed for a construction cost of $156,500. Added to'this bid are miscellaneous controller costs of $15,000 and the yet undetermined cost to get electrical power to the site. Currently with this bid the estimated construction cost is $64,000 under the feasibility report cost. The bid format on the project allowed the contractors to propose various "alternate" equipment items for consideration. The attached bid tabulation summarizes the alternate equipment offerings and shows deducts, if any, for incorporating them into the project. Based upon the information we have reviewed, we recommend the City of Rosemount make a contract award to Landwehr Construction, Inc. as the apparent low, responsive, responsible bidder. Sincerely, WSB & Associates, Inc. Is UJ; MI Bret A. Weiss, P.E. President Enclosure sb F: \WPWINV 323-00 112001 -hmcc. doc Extension of Bids • }............v:.....,.::v:. v. �.v.� :•.� h; :......::. v::•. � :.� }k::• }::v?•: ?:? ^ } }:? + } }•y >;: } :M , ':v: %w:.•: v •::::::, }•• % � %: }iii: : e ... nv.:::, ;+ .. /...:..,. n. } ... LINE PROJECT: Marcotte Pond Lift Station and Appurtenant Work Landwehr Construction LOCATION: Rosemount, Minnesota UNIT PRICE CHECKED: S. Buckley UNIT PROJECT NO(S).: 1323 -00 NUMBER DATE: November 19, 2001 UNIT ESTIMATED QUANTITY DENOTES CORRECTED FIGURE. COST PRICE $282,136.00 $294,085.00 i { LOW BIDDER 2ND LOW BIDDER _ 1 _ _ 2021 501 ._.... . MOBILIZATION . .. ......... ........... ..........._.... .........._ ...._ ._ . ....._._ LUMP SUM _ ..... . .._- . 1.00 $6,000.00 $6,000.00 $5,500.00 $5,500. 2 2104.501 REMOVE CONCRETE CURB AND GUTTER LIN FT , _._... _,_ 70.00 - $5.00 _ . ._- - - -- $350.0 - ... �. $5.00 .. ....__ - ._.. $350.00 3 2105.521 GRANULAR BORROW (LV) I CU YD 50.00 GRAND TOTAL $282,136.00 $204,085.00 FAW PW INV 323- 00'EXCELSd Tab\Bid Detail Page l of 2 LINE ITEM Landwehr Construction Barbarossa and Sons UNIT PRICE UNIT NO NUMBER DESCRIPTION UNIT ESTIMATED QUANTITY COST PRICE COST i { _ 1 _ _ 2021 501 ._.... . MOBILIZATION . .. ......... ........... ..........._.... .........._ ...._ ._ . ....._._ LUMP SUM _ ..... . .._- . 1.00 $6,000.00 $6,000.00 $5,500.00 $5,500. 2 2104.501 REMOVE CONCRETE CURB AND GUTTER LIN FT , _._... _,_ 70.00 - $5.00 _ . ._- - - -- $350.0 - ... �. $5.00 .. ....__ - ._.. $350.00 3 2105.521 GRANULAR BORROW (LV) I CU YD 50.00 $15.00 $750.0 $20.00 $1,000.00 4 2105 __ _..._.. . }TOPSOIL BORROW (LV) _ ___. CU YD 50.00 $20.00 $1,000. $16.00 ' $800.00 5 2112.602 _.. _. ..__. _ ..._.. ISUBGRADE PREPARATION 1 SQ YD 350.00 $3.00 $1,050.0 $2.00 $700.0 6 2331.601 BITUMINOUS DRIVEWAY PAVEMENT SQ YD 350.00 $20.00 $7,000.0 $29.00 $10,150.00 7 I DIV 2 - 36 RC PIPE - ........ ..... ..... . ......_ -_.. ., ......._ _ . ....__�_ . -__-- - LIN FT ..... - _.. 130.00 _.... _ $93.00 $12,090. $80.00 $10,400.00 8 2503.603 12" CORRUGATED PE PIPE SEWER LIN FT .... -- 100.00 - . __ . .. . . . $26 , 00 $2600. $48.00 I $4,800.0 9 ' 2511.501 RANDOM RIP RAP CLASS IV (WIFABRIC) CU YD 8.00 $70.00 $560.0 $95.00 $760. 10 DIV 2 STORM WATER LIFT STATION, VALVE MANHOLE, AND LUMP SUM 1.00 $237,241.00 IAPPURTENTANT WORK I $237,241.00 $224,000.00 $224,000.00 11 2531.501 CONCRETE CURB AND GUTTER, TYPE 8618 LIN FT 70.00 $16.00 $1,120.0 $35.00 $2,450.00 12 I 2563 601 !TRAFFIC CONTROL LUMP SUM 1.00 $675.00 $675.00 $2,500.00 $2,500.00 13 2573.502 SILT FENCE, TYPE HEAVY DUTY LIN FT 200.00 $2.50 $500.0 _ $4.00 I $800.0 14 2575.501 SEEDING, MIX 130B (INCL TOPSOIL, TYPE 1 MULCH & ANCHOR) ACRE 0.50 $3,000.00 $1,500.0 $1,750.00 $875.00 15 2575.505 SODDING TYPE LAWN (INCL TOPSOIL, FERTILIZER, AND, DISK (ANCHORING) SQ YD 800.00 $5.50 $4,400.0 $5.00 $4,000.00 16 DIV 2 jINTAKE SKIMMER STRUCTURE WITH RIP RAP LUMP SUM 1.00 $5,300.00 $5,300.00 $25,000.00 $25,000.0 TOTAL $282,136.0 � $294,085.00 FAW PW INV 323- 00'EXCELSd Tab\Bid Detail Page l of 2 Extension of Bids .r.•F.:..... «..::. .•. .... r: :::•:::'. r..: :•1i. .:.': � • }:. }:. }: }:S•: } }}.5::,:r S +..,;� ;., ...... S:•: {..:..vv• v..:..:•.:::r..... C.:. xvw.: v:. rv:• �:• i i::' is ii: • : • i' i< �}:•}}}: 4:•: 4: i:• ii::.: w::. 4iSS. hv. � :Yi }:.k..:.:......:.. v.:xv::: >.•.i•:x::.:::: i�: v}: r:•:-::. 6 : {: { {S<4 ?x{•: {• }: :.. } }; :.{. PROJECT: Marcotte Pond Lift Station and Appurtenant Work LOCATION: Rosemount, Minnesota CHECKED: S. Buckley PROJECT NO(S).: 1323-00 DATE: November 19, 2001 °,x DENOTES CORRECTED FIGURE. $320,864.00 $328,970.00 3RD LOW BIDDER GRAND TOTAL $320,864.00 $328,970.00 FAW PW IN11323- 00\EXCEL\Bid Tab\Bid Detail Page 2 of 2 4TH LOW BIDDER LINE ITEM Richard Knutson, Inc. Magney Construction; Inc. UNIT PRICE COST UNIT PRICE COST NO NUMBER DESCRIPTION UNIT ESTIMATED QUANTITY Y 2021 501 __. ..... . MOBILIZATION ....._ _ ... _ ......._.._.. - LUMP SUM ... . _.. 1.00 $4,000.00 $4,000.00 $16,000.00 $16,000.00 2 2104.501 REMOVE CONCRETE CURB AND GUTTER LIN FT 70.00 _ _ $10.00 $700.00 $10.00 $700.0 3 2105,521 GRANULAR BORROW (LV) CU YD 50.00 $15.00 $750.0 $17.00 $850.0 4 2105.525 _. . TOPSOIL BORROW (LV) . _- ...... ..__ ......._ ... ....... --- --_. . . - CU YD .,. __. __...... 50.00 _ ._ $15,00 $750.00 $21.00 $1,050.00 5 2112.602 SUBGRADE PREPARATION SQ YD . 350.00 r $2.00 _ - - _ $700.00 -- ---- $4.00 $1,400.00 6 2331.601 BITUMINOUS DRIVEWAY PAVEMENT SQ YD 350.00 $22.00 $7,700.0 $23.00 $8,050.0 7 DIV 2 36 RC PIPE LIN FT 130.00 8 2503.603 12" CORRUGATED PE PIPE SEWER LIN FT 100.00 . $25.00 $2,500.00 $40.00 $4,000.0 9 2511.501 RANDOM RIP RAP CLASS IV (W /FABRIC) CU YD 8.00 $90.00 $720.00 $70.00 $560.0 10 DIV 2 STORM WATER LIFT STATION, VALVE MANHOLE, AND APPURTENTANT WORK LUMP SUM 1.00 $257,884.00 $257,884.00 $263,000.00 $263,000.0 11 2531.501 CONCRETE CURB AND GUTTER, TYPE B618 LIN FT 70.00 $15.00 $1,050.00 $20.00 $1,400.00 12 2563.601 ........... - TRAFFIC CONTROL - ---. . . .... ......... . ............... ... _. .. . ... _. .. - ..._ ..... - _....:._ LUMP SUM _._ ...... 1.00 $4,500.00 $4,500.00 $500.00 $500.00 13 2573.502 SILT FENCE, TYPE HEAVY DUTY LIN FT _ 200.00 - ..... _.. - $5.00 - _ $1,000 _ - ._.:_ - $4.00 ... ._ __.... . $800.0 14 2575.501 SEEDING, MIX 130B (INCL TOPSOIL, TYPE 1 MULCH & ANCHOR) ACRE 0.50 $3,000.00 $1,500.00 - $6,000.00 $3,000.00 15 2575.505 SODDING TYPE LAWN (INCL TOPSOIL, FERTILIZER, AND DISK ANCHORING) SQ YD 800.00 $4.00 $3,200.0 $3.50 $2,800.0 16 DIV 2 INTAKE SKIMMER STRUCTURE WITH RIP RAP LUM UM 1.00 $10,250.00 $10,250.0 $3,800.00 $3,800.0 TOTAL $320,864.00 $328,970.0 Basis of Bid Evaluation Form for Rosemount, Minnesota Marcotte Pond Lift Station and Appurtenant Work Bid Date: November 16, 2001 City of Rosemount Project No. 338 WSB Project No. 1323-00 1. Contractor: Barbarossa and Sons, Inc. t 2. Proposed Alternate Equipment Stormwater Lift Station Non -clog Centrifugal Pumps (Fairbanks Morse) Division 2 — Section 11 3. Relevant Specifications and/or Comments: Pump size and horsepower do not meet minimums specified. No further review made. 4. Installed Price: $43,000.00 5. Increase/ to Total Bid Price: $5,000.00 6. Accepted/Rejected Rejected 7. Revised Total Bid Price: None Basis of Bid Evaluation Form' for Rosemount, Minnesota Marcotte Pond Lift Station and Appurtenant Work Bid Date: November 16, 2001 City of Rosemount Project No. 338 WSB" Project No. 1323-00 1. Contractor: Landwehr Construction, Inc. 2. Proposed Alternate Equipment: Stormwater Lift Station Non -clog Centrifugal Pumps (Fairbanks Morse) Division 2 — Section 11 3. Relevant Specifications and/or Comments: Pump size and horsepower do not meet minimums specified. No further review made. 4. Installed Price: $44,622.00 5. Increase/ to Total Bid Price: $6,708.00 6. Accepted/Rejected Rejected 7.- Revised Total Bid Price: None FAWPWIMI323 -OMOB Evaluation Form- Landwehr.doc Basis of Bid Evaluation Form for Rosemount, Minnesota Marcotte Pond Lift Station and Appurtenant Work Bid Date: November 16, 2001 City of Rosemount Project No. 338 WSB Project No. 1323-00 1. Contractor: - Magney Construction, Inc. 2. Proposed Alternate Equipment: Stormwater Lift Station Non -clog Centrifugal Pumps (Fairbanks Morse) Division 2 — Section 11 3. Relevant Specifications and/or Comments: Pump size and horsepower do not meet minimums specified. No further review made. 4. Installed Price: $45,000.00 5. Increase/ to Total Bid Price: $5,000.00 6. Accepted/Rejected Rejected 7. Revised Total Bid Price: None FAWPWIM1323- 001BOB Evaluation Form- Magney.doc CITY OF ROSEMOUNT DAKOTA COUNTY, MINNESOTA RESOLUTION 2001 — A RESOLUTION RECEIVING BIDS AND AWARDING CONTRACT FOR MARCOTTE POND LIFT STATION IMPROVEMENTS CITY PROJECT #338 BE IT RESOLVED, by the City Council of the City of Rosemount, Minnesota, as follows: 1. All bids on construction of the Marcotte Pond Lift Station Improvements are hereby received and tabulated. 2. The bid of Landwehr Construction, Inc., in the amount of $282,136.00 for the construction of said improvements are in accordance with the plans and specifications and advertisement forbids is the lowest responsible bid and shall be and hereby is accepted. 3. The Mayor and Clerk are hereby authorized and directed to enter into a contract with said bidder for the construction of said improvements for and on behalf of the City of Rosemount. 4. The City Clerk is hereby authorized and directed to return forthwith to all bidders the deposits made with their bids, except that the deposit of all successful bidder and the next two lowest bidders shall be retained until a contract has been executed. ADOPTED this 20 day of November, 2001. Cathy Busho, Mayor ATTEST: Linda Jentink, City Clerk Motion by: Seconded by: Voted in favor: Voted against: