HomeMy WebLinkAbout5.a. Proposed TH52/117th Street Interchange Constuction and U.P. Rail Grade Separation Municipal Layout ApprovalCITY OF ROSEMOUNT
EXECUTIVE SUMMARY FOR ACTION
CITY COUNCIL MEETING DATE: July 17, 2001
AGENDA ITEM: Proposed TH52/117 Street Interchange
AGENDA SECTION:
Construction and UP Rail Grade Separation - Municipal Layout
Department Heads Report
Approval
PREPARED BY: Bret Weiss, Interim City Engineer
ATTACHMENTS: Layouts, Resolution
APPROVED BY:
i
LOCATION: Along TH 52 at 138t Street and at the northeast
'
corner of Rosemount at TH 52• and 1 17t Street
Mn /DOT identified the construction of an interchange at TH 52 and 1 17 Street in the City of
Inver Grove Heights just north of Rosemount as a priority interchange on their system and it
received interregional corridor special funding in 2000. Since the beginning of the year
MN /DOT and their Consultant have been working on the plans for this interchange, which
includes the elimination of the at -grade rail crossing just north of 1 17t' Street. The elimination
of the at -grade or rail crossing will require the reinstituting the abandoned railroad line at 138"
Street in the City of Rosemount.
MN /DOT is planning to revise TH 52 in this area to raise the grade over the top of the railroad
and reconstructing the railroad line underneath TH52. There are significant other railroad
improvements that will be incorporated as a part of this project in order to change the railroad
operations from what currently exists to allow for closing the 1 17 Street at -grade crossing. I
attended a July 11 meeting with the railroad and inquired about the rumored intermodal
railroad siding near Koch. The railroad, Koch and Mn /DOT all stated that no plans are in place
for such a facility. One had been discussed, but the proposer decided against it.
MN /DOT is requesting that the City of Rosemount approve the preliminary layouts for the
proposed improvements with respect to work being completed in and around the City of
Rosemount. This approval is required due to the right -of -way purchase within the City.
Representatives from MN /DOT and Strger, Roscoe Fausch will be on hand to answer any
questions you may have. Attached are 11 x 17 plans of the proposed improvements.
RECOMMENDED ACTION: MOTION TO ADOPT A RESOLUTION APPROVING THE LAYOUT
FOR THE TH 52/117 STREET INTERCHANGE AND THE UP RAIL GRADE SEPARATION.
COUNCIL ACTION:
1
CITY OF ROSEMOUNT
DAKOTA COUNTY, MINNESOTA
RESOLUTION 2001 —
A RESOLUTION APPROVING THE LAYOUT FOR THE
TH 52/117 T11 STREET INTERCHANGE AND THE UP RAIL GRADE SEPARATION
WHEREAS, the Commissioner of the Department of Transportation has prepared a preliminary layout
for the improvements of a part of Trunk Highway Number 52/117 1h Street Interchange Construction and
UP Rail Grade Separation, and
WHEREAS, the relocation and grade separation of the Union Pacific spur line at 117 Street to the old
road bed located at approximately 138 Street located on the northern border of the City of Rosemount,
and
WHEREAS, said preliminary layouts are on file in the Office of the Department of Transportation,
Saint Paul, Minnesota, being marked, labeled and identified as S. P. 1907 -63.
NOW THEREFORE BE IT RESOLVED, that said preliminary layouts for the improvement of said
Trunk Highway 52/117 1h Street Interchange and UP Rail Grade Separation are hereby approved.
ADOPTED this 17 th day of July, 2001.
ATTEST:
Linda Jentink, City Clerk
Cathy Busho, Mayor
CERTIFICATION
I hereby certify that the foregoing is a true and correct copy of a resolution presented to and adopted by
the City Council of Rosemount at a duly authorized meeting thereof, held on the 19 th day of July, 2001,
as disclosed by the records of said City in my possession.
(SEAL)
Linda J. Jentink, Rosemount City Clerk
Motion by:
Voted in favor:
Seconded by:
Voted against:
�NNESp
D o Minnesota Department of Transportation
A
Metropolitan Division
OF Ta'" Waters Edge
1500 West County Road 132
Roseville, MN 55113
July 2, 2001
Mr. Brett Weiss
WSB & Associates
8441 Wayzata Blvd
Golden Valley, MN 55426
Office Tel: 651 - 634 -2340
Fax: 651 - 634 -2162
RLE C-',7i�..', 1
I IVSB & ,ASSOCIATES
Subject: Proposed TH 52/117` Street Interchange Construction
and UP Rail Grade Separation (SP 1907 -63)
Municipal Layout Approval — City of Rosemount
Dear Brett:
As discussed in our recent phone conversation, I'm enclosing the proposed layout for
construction of the TH 52/117` Street Interchange and UP railroad grade separation. Also
enclosed is a sample resolution, for your reference in preparing the necessary council resolution.
As shown on the layout, under SP 1907 -63 iVInDOT will regrade TH 52 in the vicinity of 138`"
Street, as needed to accommodate the relocation and grade separation of the Union Pacific spur
line. That line is proposed to be relocated by the Union Pacific Railroad, from it's current at-
grade crossing north of 117` Street to the old road bed located at approximately 138` Street.
TH 52 will be elevated over the proposed rail line. Because the remaining railroad relocation
work will be done by the U.P. Railroad, under a separate project, that work is not shown on
MnDOT's layout. However, as we previously discussed, Ron Rauchle (SRF Consulting Group,
Inc.) will provide you with the latest rail relocation schematic, prepared by Union Pacific.
A meeting will be held with Union Pacific Railroad representatives (based out of U.P.'s Omaha,
Nebraska office) on July 11` It will be held at MnDOT's Waters Edge Building in Roseville, at
2:00. The intent of that meeting will be to discuss U.P.'s current operations, the proposed
relocation work, and potential funding. As we previously discussed, your attendance at that
meeting would be greatly appreciated.
Ron Rauchle and I will attend the City Council Meeting on Tuesday, July 17` to present
information regarding the project and to answer any questions the City might have. If you need
any additional information for the council packets, please contact either Ron or myself.
Thank you for your assistance in this matter.
Sincerely,
Susan M. Klein, P.E.
Metro Division Area Engineer
cc: Tom Burt — Rosemount City Administrator
Lezlie Vermillion — Metro Area Manager
Ron Rauchle — SRF Consulting Group, Inc.
Gary Johnson — Inver Grove Heights
r
An equal opportunity employer
1.
S.P. 1907 -63 TH 52
117th Street Interchange and
138th Street Union Pacific Railroad grade separation
PROJECT DESCRIPTION
The proposed project includes the construction of a grade- separated interchange
at T.H 52 and 117 Street in the City of Inver Grove Heights. The new
interchange will replace an existing at -grade intersection. The project also
includes reconstruction of TH 52, raising the profile, to accommodate a grade -
separation with a Union Pacific Railroad (UPRR) spur track at 138 Street in the
City of Rosemount, proposed for relocation from its present at -grade crossing
with TH 52, 1/3 mile north of 117 Street. TH 52 will be reconstructed to bridge
over the relocated spur track.
The new 117 St. interchange will be a "folded diamond" design on the east side
and a "standard diamond" design on the west side of TH 52. 117 St. will be
reconstructed to bridge over TH 52 with no reconstruction of TH 52 necessary in
this area. The design speed for 117 St. will be 50 mph. The limits of the 117
St. reconstruction will extend from approximately 2400 feet west to 1200 feet
east of TH 52. The 117 St. roadway will be a rural four -lane design with right
and left turn lanes at the signalized ramp intersections. Double left turn lanes
will be required for the northbound TH 52 to westbound 117 St. and the
southbound TH 52 to eastbound 117 St. traffic movements. The four -lane
section of 117 St. will transition back to the existing two -lane section west of
the project /interchange area. A raised median will separate east and westbound
traffic on 117 St. through the interchange area.
The proposed project will construct a frontage road along the east side of TH 52,
extending from approximately 1800 feet south of 117 St., north to 111 St.,
located approximately 3200 feet north of 117 St. The frontage road, both north
and south of 117 Street, will be connected to the east TH 52 ramp intersection.
The construction of the east frontage road will allow for the closing of the
following direct access points to TH 52 (right - in/right -out to northbound TH 52):
- the existing east frontage road connection located approximately 1800 feet
south of 117 th .
- the Conoco driveway located approximately 1100 feet north of 117 St.
- the existing 111 St. connection located approximately 3200 feet north of
117 St.
Storm water retention ponds, located within the interchange area, will be
constructed to treat the interchange and highway runoff. The discharge rate of
the ponds will be controlled to that less than or equal to existing runoff rates.
Approximately 4600 feet of TH 52 will be reconstructed to accommodate the
potential relocation of the UPRR spur track to 138 St. The elevation of TH 52
will be raised approximately 16 feet to provide for the grade separation. A 70
mph design speed will be used for the TH 52 roadway design. Limits and extent
of potential rail track construction/reconstruction have yet to be determined.
Construction of the 117 St./TH 52 interchange and the TH 52 reconstruction at
138 St. is scheduled to begin in early Summer 2002. Project completion is
anticipated in Fall 2003.
o.tyT �`�o
� w
r � r�ti�
z
r-
0
`k
W CC ^I IL
"^ �
(L I
Ln
F.
I i
U " rn,
CL
C� Z
F
:I LL CC
r i a,
•i �"
— Tp..
Z
w
t
Z W
Q ��I lug p H-
? CD
O
r z
0 0
�d
r�
LU
d U U) r�
j
rr
LO
Cc
LLI
LIJ
h• C
:
:
"
r
1
i
R
C
c a-
r M O LU
II F
I 4n i
'����
� a �1
O
z yp
Cc —
• KOCH ACID
:
I � I
Y
a
CL
.r tix Q
i G
ftn�Ea'•. �. - �
O
4
1af aa,
4 1
Nov
0
I
10, 1
%
uj
Ir
(n
ti
Imu
r
LLww vLovva
3mm v3m go wo
iWaymm A A113
AlW= nova