Loading...
HomeMy WebLinkAbout6.c. Receive Bids/Award Contract-Evermoor 8th Street & Utility Improvements, City Project #337n CITY OF ROSEMOUNT EXECUTIVE SUMMARY FOR ACTION CITY COUNCIL MEETING DATE: September 4, 2001 AGENDA ITEM: Receive Bids /Award Contract- Evermoor 8t Street & Utility Improvements, City Project #337 AGENDA SECTION: Consent PREPARED BY: Bret Weiss, Interim City Engineer - AGEN � 6 LP ATTACHMENTS: Resolution, Bid Tabulation APPROVED BY: On Wednesday, August 29, 2001, bids for the referenced project were received and read aloud publicly. Four (4 ) bids were received on the project. The apparent low bidder for the project is Ryan Contracting Co. of Shakopee, MN in the amount of $430,449.15. The bids ranged from the low bid to a high bid of $563,765.81 and the Engineer's Estimate was $442,000.00. Considering the current bidding climate, we would recommend award of the contract to Ryan Contracting Co. in the amount of $430,449.15. RECOMMENDED ACTION: MOTION TO ADOPT A RESOLUTION RECEIVING BIDS AND AWARDING CONTRACT FOR EVERMOOR 8 STREET AND UTILITY IMPROVEMENTS, CITY PROJECT #337. COUNCIL ACTION: 1 V CITY OF ROSEMOUNT DAKOTA COUNTY, MINNESOTA RESOLUTION 2001— A RESOLUTION RECEIVING BIDS AND AWARDING CONTRACT FOR EVERMOOR 8 TH STREET AND UTILITY IMPROVEMENTS CITY PROJECT #337 BE IT RESOLVED, by the City Council of the City of Rosemount, Minnesota, as follows: 1. All bids on construction of the Evermoor 8 Street and Utility Improvements are hereby received and tabulated. 2. The bid of Ryan Contracting Company, in the amount of $430,449.15 for the construction of said improvements are in accordance with the plans and specifications and advertisement for bids is the lowest responsible bid and shall be and hereby is accepted. 3. The Mayor and Clerk are hereby authorized and directed to enter into a contract with said bidder for the construction of said improvements for and on behalf of the City of Rosemount. 4. The City Clerk is hereby authorized and directed to return forthwith to all bidders the deposits made with their bids, except that the deposit of all successful bidder and the next two lowest bidders shall be retained until a contract has been executed. ADOPTED this 4th day of September, 2001. Cathy Busho, Mayor ATTEST: Linda Jentink, City Clerk Motion by: Voted in favor: Seconded by:_ Voted aeai WS B & Associates, Inc. August 30, 2001 Honorable Mayor and City Council City of Rosemount 2875 145` Street West Rosemount, MN 55068 -4997 Re: Evermoor 8 th Addition Street & Utility Construction & Appurtenant Work City of Rosemount Project No. 337 WSB Project No. 1344 -00 Dear Mayor and Council Members: - Bids were received for the above- referenced project at 10:00a.m., August 29, 2001, and. were opened and read aloud. A total of four (4) bids were received. The bids were checked for mathematical accuracy and tabulated. Please find enclosed the bid tabulation indicating the low bidder as Ryan Contracting Co., in the amount of $430,449.15. We recommend award of the contract to Ryan Contracting Co. in this amount. Sincerely, MinnPannlic . rf r'l—,4 . r,­1 r WSB & Associates, Inc. Mark Erichson, P.E. Project Manager Enclosures c: Ryan Contracting Co. 4150 Olson Memorial Highway ao Suite 300 Minneapolis Minnesota 55422 ' 763.541.4800 763 - 541.1700 FAX C: \W[tiDOWS \TENiPrecmmdtn itr.doc MinnPannlic . rf r'l—,4 . r,­1 r n EVERMOOR 8TH ADDITION STREET & UTILITY CONSTRUCTION & APPURTENANT WORK CITY OF ROSEMOUNT, MN CITY PROJECT NO. 336 WSB PROJECT NO. 1344 -00 BIDS OPENED: AUGUST 29, 2001 -10:00 A.M. Contractor Bid Security Total Bid 1 Ryan Contracting Co. X $430,449.15 2 Erickson Contracting, Inc. X $431,072.16 3 Richard Knutson, Inc. X $480,384.50 4 Northdale Const. Co., Inc. X $563,765.81 Engineer's Estimate $442,000.00 1 hereby certify that this is a true and correct tabulation of the bids as received on August 29, 2001. Mark A. Erichson, P. E. ** Denotes corrected figure