CITY OF ROSEMOUNT
EXECUTIVE SUMMARY FOR ACTION
CITY COUNCIL MEETING DATE: September 19, 2000
AGENDA ITEM: Receive Feasibility Report /Set. Public Hearing-
East Side Watermain Improvements, City Project #320
AGENDA SECTION:
Consent
PREPARED BY: Bret Weiss, Interim City Engineer
AGENM 6
ATTACHMENTS: Resolution, Feasibility Report
APPROVED BY:
Attached please find a copy of the Feasibility Report for the East Side Watermain project, City
Project #320. This project consists of the extension of the trunk watermain system from 140"
Street along Trunk Highway 52 to Koch Refining, then along Pine Bend Trail to Trunk Highway
55, then southeast to Doyle Path. This project is expanded from the original plan due to the
requirement to provide fire protection to Spectro Alloys.
An option to complete the looping of the system by extending the pipe to 140" Street adjacent
to the Rosemount Waste Water Treatment Plant is also discussed.
Much of the cost of this project will be funded through the Water Core Fund, with assessments
levied against the benefited properties.
A second phase of this project, connecting this line to the rural wells along CSAH 42 is
proposed to be constructed in the near future.
Staff and Interim City Engineer recommend that City Council receive the Feasibility Report and
set the public hearing for October 3, 2000.
RECOMMENDED ACTION: MOTION TO ADOPT A RESOLUTION RECEIVING THE
FEASIBILITY REPORT AND SETTING THE PUBLIC HEARING FOR THE EAST SIDE
WATERMAIN IMPROVEMENTS, CITY PROJECT #320.
COUNCIL ACTION:
7
f CITY OF ROSEMOUNT
' DAKOTA COUNTY, MINNESOTA
RESOLUTION 2000 -
A RESOLUTION RECEIVING THE FEASIBILITY REPORT AND SETTING THE PUBLIC HEARING
FOR THE EAST SIDE WATERMAIN IMPROVEMENTS
CITY PROJECT #320
WHEREAS, the City Council deemed it necessary and expedient that the City of Rosemount, Minnesota, construct
certain improvements, to -wit: City Project #320, East Side Watermain Improvements, in the City as described in-and
in accordance with the feasibility report prepared by the City Engineer, and
WHEREAS, the City Council has been advised by the City Engineer that said utility and street improvements, City
Project #320 is feasible, and should best be made as proposed, and the City Engineer's report'to this effect has
heretofore been received by Council, and filed with the City Clerk on September 19, 2000; and
WHEREAS, the statute provided that no such improvements shall be made until the Council has held a public hearing
on such improvements following mailed notice and two publications thereof in the official newspaper stating time and
place of the hearing, the general nature of the improvement, the estimated costs thereof, and the area proposed to be
assessed, in accordance with the law.
NOW THEREFORE BE IT RESOLVED, the City Council of the City of Rosemount accepts the feasibility report for City
Project #320 and places it on file.
NOW THEREFORE IT BE FURTHER RESOLVED, by the City Council of the City of Rosemount that the public hearing
be scheduled to consider City Project #320, East Side Watermain Improvements to be held on Tuesday, October 3,
2000 at 8:00 o'clock p.m. or as soon thereafter as possible, in the Council Chambers of the City Hall.
ADOPTED this 19th day of September, 2000.
ATTEST:
Cathy Busho, Mayor
Linda Jentink, City Clerk
Motion by: Seconded by:
Voted in favor
Voted against
0
o
• N
rmvs�
'J
Eastside Watermain Extension
City Project Number :320
for the City of
WSB Proj. No. 1252 -002
September 19, 2000
Submitted to:
City of Rosemount
2875 145th Street West
Rosemount, Minnesota 55068
A 350 Westwood Lake Office
WSB 8441 Wayzata Boulevard
Minneapolis, MN 55426
-_ 612 - 541 -0800
& Associates, Inc. FAX 541 -1700
INFRASTRUCTURE - ENGINEERS - PLANNERS
FEASIBILITY REPORT
EAST SIDE WATERMAIN EXTENSION
AND APPURTENANT WORK
CITY OF ROSEMOUNT
CITY PROJECT NO. 320
SEPTEMBER 19, 2000
Prepared By:
WSB & Associates, Inc.
350 Westwood Lake Office Park
8441 Wayzata Boulevard
Minneapolis, MN 55426
(763) 541 -4800
(763) 541 -1700 (Fax)
City of Rosemount Ar East Side Watermain Extension and Appurtenant Work A
Feasibility Report - City Project No. 320 WSB
WSB Project No. 1252 -00
B.A. Mittelsteadt, P.E.
8441 Wayzata Boulevard, Suite 350
14/46' � Minneapolis, MN 55426 Bret A. Weiss, P.E.
' Peter R. Willenbring, P.E.
Donald W. Sterna, P.E.
tel: 763 - 541 -4800 Ronald B. Bray, P.E.
& Associates, Inc. fax: 763 - 541 -1700
September 19, 2000
Honorable Mayor and City Council
' City of Rosemount
2875 145th Street West
Rosemount, MN 55068 -4997
' Re: Feasibility Report
East Side Watermain Extension and Appurtenant Work
' City Project No. 320
WSB Project No. 1252 -00
' Dear Mayor and City Council Members:
' Transmitted herewith is a feasibility report which addresses the east side watermain extension
along Trunk Highway (TH) 52 and Trunk Highway 55, serving adjacent properties.
' We would be happy to discuss this report with you at your convenience. Please don't hesitate
to contact me at (763) 277 -5790 if you have any questions regarding this report.
' Sincerely,
WSB & Associates, Inc.
' Bret A. Weiss, P.E.
President
' Enclosure
I bba/jw
Minneapolis St. C l o u d
' Infrastructure Engineers Planners
EQUAL OPPORTUNITY EMPLOYER
CERTIFICATION
I hereby certify that this plan, specification or report was prepared by
me or under my direct supervision and that I am a duly Registered
Professional Engineer under the laws of the State of Minnesota.
Bret A. Weiss, P.E.
Date: September 19, 2000
City of Rosemount Ar East Side Watermain Extension and Appurtenant Work
Feasibility Report - City Project No. 320
WSB Project No. 1252 -00
Reg. No. 20753
,A A
YrSB
&A-
TABLE OF CONTENTS
TITLE SHEET
LETTER OF TRANSMITTAL
CERTIFICATION SHEET
TABLE OF CONTENTS
1. EXECUTIVE SUMMARY ................ ............................... 1
2. INTRODUCTION ........................ ..............................2
2.1 Authorization 2
2.2 Scope 2
2.3 Data Available 2
3. GENERAL BACKGROUND .............. ............................... 3
3.1 Project Location 3
3.2 Existing Conditions 3
4. PROPOSED IMPROVEMENTS ........... ............................... 4
4.1 Watermain 4
4.2 Permits / Approvals 5
5 FINANCING ............................ ..............................6
5.1 Opinion of Cost 6
5.2 Funding 6
6. PROJECT SCHEDULE .................. ............................... 8
7. FEASIBILITY AND RECOMMENDATION ............................... 9
APPENDIX .................................. .............................10
FIGURES 10
APPENDIX ................................. .............................14
OPINION OF COST 14
City of Rosemount Ar East Side Watermain Extension and Appurtenant Work
Feasibility Report - City Project No. 320
WSB Project No. 1252 -00
A
WSB
& Assoemrrs /x.
1. EXECUTIVE SUMMARY
■ City Proj ect No. 320 involves the extension of a trunk watermain to serve existing businesses
seeking potable water service and fire protection along Trunk Highway(TH) 52, north of
' 140 " Street and along TH 55, east of TH 52 to just beyond Doyle Path. This project is the
second part of the East Side water system improvements, with the proposed water tower
project as the first part. The final part of the improvements would involve the connection
' of this water system to the rural wells with a new larger trunk watermain system located
along CSAH 42. A map showing the project location is shown on Figure 1.
' The east side watermain extension will connect to the existing rural water system and the
proposed new water tower site located south of County Road 42 and east of TH 52. The
proposed improvements include the construction of approximately 12,700 lineal feet of 12-
inch DIP watermain and 2,400 lineal feet of 8 -inch DIP watermain and appurtenances to
provide potable water service and fire protection to facilities adjacent to the watermain,
' namely the Koch administration building, Continental Nitrogen, Spectro Alloys, and Dixie
Petro Chemical (DPC). An additional option analyzed in this report includes a continuation
of the watermain to the south, to 140 ' Street and a connection to the existing rural water
system, to provide a looped system.
' City of Rosemount AFEast Side Watermain Extension and Appurtenant Work
Feasibility Report - City Project No. 320
WSB Project No. 1252 -00 Page 1
■
The project cost for the watermain improvements is estimated at $1,127,198 and $1,396,252
'
for the base project and the base project including the looping option, which includes a
10% contingency and 30% indirect costs. The project is proposed to be funded through
assessments of the adjacent properties and by the City of Rosemount Water Core Fund.
This ro'ect is proposed to be completed b June of 2001 to coincide with a Jul 2001
p J p p P Y Y
'
completion date of the new water tower site.
This project is feasible, necessary and cost - effective from an engineering standpoint and
'
should be constructed as proposed herein.
' City of Rosemount AFEast Side Watermain Extension and Appurtenant Work
Feasibility Report - City Project No. 320
WSB Project No. 1252 -00 Page 1
■
r
1
u
2. INTRODUCTION
2.1 Authorization
On May 2, 2000, the Rosemount City Council authorized the preparation of a Feasibility
Report to address the extension of watermain to provide potable water service to adjacent
properties along TH's 52 and 55. This project has been designated as City Project No. 320.
2.2 Scope
This report addresses the construction of a trunk watermain along TH 52 from 140' Street
to TH 55 and along TH 55 from TH 52 to just beyond Doyle Path to provide potable water
service and fire protection to adjacent properties. This project will include the construction
of approximately 12,700 lineal feet of 12 -inch DIP and 2,400 lineal feet of 8 -inch DIP
watermain and appurtenances. An additional option to this project includes the continuation
of the 12 -inch DIP watermain to the south along the railroad right -of -way and MCES
property to connect to the rural water system at 140`' Street, providing a looped system. The
project as proposed will connect to the existing rural water system, and new water tower
located south of County Road 42 and east of TH 52. Installation of the trunk watermain is
anticipated to be within the Mn/DOT right -of -way or private easements.
2.3 Data Available
Information and materials used in the preparation of this report include the following:
• City of Rosemount Record Plans
• Site Topography by WSB & Associates, Inc.
• City of Rosemount Topography Maps
• Preliminary Feasibility Report for City of Rosemount East Side Water Supply and
Distribution Plan by Bonestroo Rosene Anderlik & Associates
• As -built plans for the Conley Avenue Street and Utility construction prepared by
WSB & Associates, Inc.
• Plans for the City of Rosemount 500,000 Gallon Elevated Water Reservoir prepared
by Bonestroo Rosene Anderlik & Associates
City of Rosemount Ar East Side Watermain Extension and Appurtenant Work
Feasibility Report - City Project No. 320
WSB Project No. 1252 -00
Page 2
3. GENERAL BACKGROUND
' 3.1 Project Location (See Figure 1)
' The proposed watermain improvements are located north of 140 Street along TH 52 to
Koch's East side complex and along TH 55, east of TH 52 just beyond Doyle Path to Spectro
' Alloys.
3.2 Existing Conditions
The primary area where the trunk watermain is proposed to be installed is within the right -of-
ways of TH's 52 and 55. The terrain in this area consists of road ditches, several areas of
' trees and brush, and other vegetation.
Numerous private utilities exist within and adjacent to the right -of -way. Sprint has several
' fiber optic cables located along the south side of Pine Bend Trail from TH 52 to TH 55,
within the right -of -way. Sprint also has telephone cables located along and crossing TH's
52 and 55. These are all copper cables and are critical communication lines for the
' surrounding businesses. Northern Natural Gas (Enron) has a 12 -inch diameter high pressure
steel line crossing TH 52. Peoples Natural Gas has pipelines along TH's 52 and 55 in
parallel alignment with the proposed watermain. NSP has two TH 52 crossings along with
i a distribution pole line along the east right -of -way and a transmission pole line along the
west side of TH 52. Koch Pipeline has a 6 -inch propane line, two 16 -inch crude oil lines,
' a 12 -inch and 8 -inch refined product line all along and crossing TH 52. Coordination with
these private utility companies is crucial to the safe installation of the watermain. Exact
locations of all these utilities is being verified and may have an impact to the alignment of
the proposed watermain, as well as construction within the highway right -of -way.
The existing properties currently are not served by City water and exist on private water
' systems. The existing rural water system and the new water tower site are designed to
provide domestic water supply service and fire protection to this eastern service area. The
existing businesses that currently need service include Koch Refinery, Continental Nitrogen,
' Dixie Petro Chemical (DPC), and Spectro Alloys Corporation. Koch Refinery has extreme
fire protection demands and will need to maintain a separate fire protection system, but will
use the City water for potable water needs. Continental Nitrogen needs City water for
' potable water use only. DPC needs City water for processing and potable water only.
Spectro Alloys has a sprinkler system installed in their facility and is required to hook up to
City water for fire protection. Based on projected pressures in the area, it is likely that
' Spectro Alloys will need to install a booster pump to meet their internal sprinkler system
requirements.
City of Rosemount Ar East Side Watermain Extension and Appurtenant Work
Feasibility Report - City Project No. 320
WSB Project No. 1252 -00 Page 3
4.
PROPOSED IMPROVEMENTS
Watermain (See Figure 2)
The proposed trunk watermain will connect to the existing 12 -inch DIP stub located at
140" Street and TH 52, west of Conley Avenue, and will extend north along the east side of
TH 52 for approximately 6,000 feet and continue along Pine Bend Trail to TH 55 for
approximately 900 feet, while providing service to Continental Nitrogen. The watermain
will then extend along the south side of TH 55 for approximately 1,200 feet, and will cross
TH 55 and extend east along the north side of TH 55 for approximately 4,000 feet to just
beyond Doyle Path to provide service to Spectro Alloys. The proposed watermain will also
cross TH 52 with 12 -inch DIP line just south of Pine Bend Trail with an 8 -inch DIP line to
serve Koch Refinery's east side complex. The watermain will extend through jacked casing
pipe at crossings under TH's 52 and 55. Water service lines from the trunk watermain will
be extended to the individual properties as required. An 8 -inch DIP water line will service
Koch Refinery's east side complex, a 4 -inch DIP pipe will serve Continental Nitrogen and
a 12 -inch DIP water line will serve Spectro Alloys and DPC. Hydrants with six -inch leads
and gate valves will be placed at high and low elevation points along the proposed watermain
line along with other locations to maintain an approximate 1,200 -foot spacing. Gate valves
will be placed every 1,200 feet and at crossing and services.
The proposed watermain includes installation in the Mn/DOT right -of -ways of TH 52 and
TH 55, pending permit approval. As described in the existing conditions section, there are
several private utilities located in the Mn /DOT right -of -way. Their exact location is being
verified and potentially poses tight construction limits for installation of the proposed
watermain. Use of a trench box, supporting the private utilities and protection of the
proposed watermain is anticipated to be needed during construction. Private easements may
need to be acquired to work around all the utility conflicts. These costs were not included
in the cost opinion, however it appears that the adjacent property owners would be agreeable
to provide easements if necessary. There is a rectifier present near Koch's site and most
likely the trunk watermain will need to be connected to Koch's cathodic protection system
to avoid damage to the pipe. Using PVC pipe may be an option instead of using DIP to
further protect the watermain from any degradation. These details will be worked out during
design. For this feasibility report we will consider using 8 -inch DIP, as it is more costly than
PVC pipe.
The system as proposed consists of a long dead end line, which can create issues with water
quality and possible inconsistent service. In an effort to accommodate a looped system, a
possible option would be to continue the extension of the 12 -inch DIP watermain for
approximately 5,000 feet from TH 55 south to 140' Street along the railroad right -of -way
and adjacent to the Rosemount wastewater treatment plant. This system would connect into
the existing 4 -inch PVC line along 140" Street, which is part of the City of Rosemount's
Rural Water System. While connection to the 4 -inch system is not ideal, it would provide
City of Rosemount Ar East Side Watermain Extension and Appurtenant Work
Feasibility Report - City Project No. 320
WSB Project No. 1252 -00
Page 4
consistency in the system which is essential for many of the benefitted businesses. This
proposed 12 -inch optional line will include auguring under railroad tracks at TH 55.
Hydrants and gate valves will be placed along this line to maintain an approximate 1,200 foot
spacing. Private easements will need to be acquired for this option and are not included in
' the cost opinion.
' This proposed system is considered to be the second part of the East Side water system
improvements plan, following the proposed water tower project. It is anticipated that this
project can be constructed in time to connect with the new water tower site, which is to be
completed by July of 2001. The timely completion of this project will allow the third phase
to proceed, which includes the extension of a trunk watermain along County Road 42 to the
rural well system. This third phase will provide a larger and more efficient water system,
' increasing the rate at which the new water tower can be filled and providing a more reliable
water source.
' 4.2 Permits / Approvals
Permits will be required for this project from the Minnesota Department of Health for the
' watermain extension.
' Permits from the Mn/DOT will be required for any work performed within TH 55 and TH 52
rights -of -way.
Railroad permits will be required for crossings and work performed within the rights -of -way.
1
City of Rosemount ArEast Side Watermain Extension and Appurtenant Work
Feasibility Report - City Project No. 320
WSB Project No. 1252 -00 Page 5
FINANCING
Opinion of Cost
Detailed opinions of cost can be found in Appendix B of this report. The opinions of cost
incorporate 2000 construction costs and include a 10% continency factor and all related
indirect costs. The indirect costs are estimated at 30% and include legal, engineering,
administrative, and financing items. The summary of the project cost is as follows:
Total'
• Watermain Improvements $1,127,198
Subtotal $1,127,198
• Watermain Improvements — Loop Option 1
5.
'
$1,396,252
5.1
FINANCING
Opinion of Cost
Detailed opinions of cost can be found in Appendix B of this report. The opinions of cost
incorporate 2000 construction costs and include a 10% continency factor and all related
indirect costs. The indirect costs are estimated at 30% and include legal, engineering,
administrative, and financing items. The summary of the project cost is as follows:
Total'
• Watermain Improvements $1,127,198
Subtotal $1,127,198
• Watermain Improvements — Loop Option 1
$269,054
Grand Total
$1,396,252
' 5.2 Funding
The City's policy for assessments is to assess the cost of a 12 -inch watermain in commercial
or industrial zoning areas and 8 -inch watermain in residential areas. These assessments are
figured out at $18 /front foot or at a rate of half the cost of installation per benefitting side.
Funding for the project will be collected from special assessments to the benefitting
properties and through the City's Water Core Fund. Much of the property adjacent to the
proposed watermain is undeveloped, with no immediate development plans. Further,
because properties across the highway from the watermain installation are difficult and
expensive to service, the assessments are figured for the length of adjacent property. In the
case of Continental Nitrogen, the front footage is considered the shorter of the two sides.
Koch Material is being served by an 8 -inch service line, and will not be charged the same
rate as the other properties, instead they will be charged for 100% of the costs to service
them. Service costs for Koch, DPC, Continental Nitrogen and Spectro Alloys are included
in the following table. Yearly costs are estimated at an 8% interest rate for 10 years.
City of Rosemount Ar East Side Watermain Extension and Appurtenant Work
Feasibility Report - City Project No. 320
WSB Project No. 1252 -00
Page 6
t
CITY OF ROSEMOUNT - EAST SIDE WATERMAIN
EXTENSION
CITY PROJECT NO. 320
WSB PROJECT NO. 1252 -00
PID No.
Property Owner
Front Footage
LF
Mainline
Rate
Service
Cost
Assessment
Yearly
Cost
340190001057
Koch Refining
995
$18 / ft.
$17,910
$2,669.12
Company
340190001067
Koch Refining
1,130
$18 / ft.
$20,340
$3,031.26
Company
340190001040
Koch Refining
1,250
$18 / ft.
$22,500
$3,353.16
Company
340190001112
Continental Nitrogen
1,300
$18 / ft.
$23,400
$3,487.29
340190001112
Continental Nitrogen
900
$18 / ft.
$1,200
$17,400
$2,593.11
340130001075
Great Northern Oil
2,400
$81,600
$81,600
$12,160.81
340180001888
Dixie Petro -Chem 1
800
$18 / ft.
$14,300
$28,700
$4,277.15
340180001588
Walbon Partnership
2,000
$18 / ft.
$36,000
$5,365.06
343340008001
Hollenback & Nelson
800
$18 / ft.
$14,400
$2,146.02
343340003102
Eagle Sanitation 1
300
$18 / ft.
$5,400
$804.76
343340003102
Eagle Sanitation 1
450
$18 / ft.
$8,100
$1,207.14
347215001001
Spectro Alloys Corp.
750
$18 / ft.
$2,000
$15,500
$2,309.96
Total Assessments
$291,250
A breakdown of the special assessmen is as follows:
Base Base Project plus
Project Looping Option
Assessments $291,250 $291,250
Water Core Fund $835,948 $1,105,002
Total $1,127,198 ! $1,396,252
�ioure 3 shows the locations of the adiacent brouerties alone the proposed watermain.
City of Rosemount ArEast Side Watermain Extension and Appurtenant Work
Feasibility Report - City Project No. 320
WSB Project No. 1252 -00
Page 7
r�
6. PROJECT SCHEDULE
The proposed project schedule for this improvement is as follows:
Receive Feasibility Report / Order Public Hearing ............. September 19, 2000
Public Hearing / Order Plans and Specifications .................... October 3, 2000
Approve Plans and Specifications / Order Ad for Bid .............. November 7, 2000
Receive Bids .............. ............................... December 1, 2000
Award Contract ............ ............................... December 5, 2000
Begin Construction ........ ............................... December 15, 2000
Construction Completion ........... ............................... June, 2001
Assessment Hearing ............. ............................... August, 2001
City of Rosemount AF East Side Watermain Extension and Appurtenant Work
Feasibility Report - City Project No. 320
WSB Project No. 1252 -00
Page 8
7. FEASIBILITY AND RECOMMENDATION
City Project No. 320 consists of the extension of a trunk watermain and appurtenant work
in accordance with the City of Rosemount's Comprehensive Plans.
It is the recommendation of WSB & Associates, Inc. that City Project No. 320 is feasible,
necessary and cost - effective from an engineering standpoint. We recommend construction
of the proposed improvements as detailed in this report.
City of Rosemount Ar East Side Watermain Extension and Appurtenant Work
Feasibility Report - City Project No. 320
WSB Project No. 1252 -00
Page 9
F]
APPENDIX A
FIGURES
' City of Rosemount ArEast Side Watermain Extension and Appurtenant Work
Feasibility Report - City Project No. 320
WSB Project No. 1252 -00 Page 10
N
N
w
0
0
N
I
0 ,ODD 2000
350 Westwood Lake Office
- Eastside Watermain Extension WS6 Project No. 1252 -D02 Date: September 19, 2000
8441 Wayzata Boulevard
WSB Minneapolis, MN 55426 Project Location
J Figure Number
� e,z- sa, <eoo
&A —iw-, Inc. FAX 541 -1700 Rosemount Minnesota
INFRASTRUCTURE - ENGINEERS - PLANNERS 1
;OCH — -
-, -- IN`
--
[ C O N L E y ,y,�A TCOSED �B" PVC WATERMAIN
w i
NEW WATER F
TOWER SITE I I L
Q
LN i
ao�� l
O
U
EXISTIN� -
WATERMAII
0
.
i
ro
N
o
350 Westwood Lake Office
8441 Wayzata Boulevard
u
'w SB
S
Minneapolis, MN 55426
N
rr
'
612.541800
& Associates, Inc.
FAX 541-1700
INFRASTRUCTURE - ENGINEERS - PLANNERS
I� I
� I
I
I �
I j
i
i
3B Project No. 1252 -002
0 500 1000
Date: September 19, 2000
Figure
2
r
i
i
340130001
GREAT NORTHE
1000 0 1000 Feet
/SB Project No. 1252 -002 Date: September 19, 2000
35(7 Westwood Lake Office •
8441 Wayzata Boulevard •
r�, Minneapolis. MN 55426 a
�Y B Figure
612 -54 4900
w t.ur:curev, r :.: FAX 541.1too 3
INFRASTRUCTURE - ENGINEERS - PLANNERS
i
Fi
APPENDIX B
OPINION OF COST
City of Rosemount mEast Side Watermain Extension and Appurtenant Work
Feasibility Report - City Project No. 320
WSB Project No. 1252 -00 Page 14
Engineer's Opinion of Probable Cost
East Side Watermain Extension & Appurtenant Work
' City of Rosemount
City Project No. 320
Schedule A - Water Improvements
Item Description
Total Cost
1
MOBILIZATION
LUMP SUM
1
$40,000.00
$40,000.00
2
TRAFFIC CONTROL
LUMP SUM
1
$50,000.00
$50,000.00
3
CONNECT TO EXISTING WATERMAIN
EACH
1
$500.00
$500.00
4
12" WATERMAIN -- DUCT IRON CL 52
LIN FT
12,700
$30.00
$381,000.00
5
8" WATERMAIN — DUCT IRON CL 52
LIN FT
2,400
$25.00
$60,000.00
6
6" WATERMAIN — DUCT IRON CL 52
LIN FT
500
$20.00
$10,000.00
7
4" WATERMAIN — DUCT IRON CL 52
LIN FT
50
$15.00
$750.00
8
20" CASING FOR JACKING 12" WATERMAIN
LIN FT
400
$220.00
$88,000.00
9
FURNISH AND INSTALL HYDRANT
EACH
16
$1,600.00
$25,600.00
10
12" GATE VALVE AND BOX
EACH
17
$1,200.00
$20,400.00
11
8" GATE VALVE AND BOX
EACH
2
$700.00
$1,400.00
12
6" GATE VALVE AND BOX
EACH
16
$500.00
$8,000.00
13
4" GATE VALVE AND BOX
EACH
1
$400.00
$400.00
14
DUCTILE IRON FITTINGS
POUND
10,000
$1.00
$10,000.00
15
SODDING
SY
8,000
$2.00
$16,000.00
16
SEEDING
ACRE
8.0
$1,500.00
$12,000.00
17
CLEARING AND GRUBBING
LUMP SUM
1.0
$5,000.00
$5,000.00
18
GRAVEL RESTORATION
TON
100
$10.00
$1,000.00
19
STREET /DRIVEWAY REPLACEMENT
SY
700
$30.00
$21,000.00
20
REMOVE AND REPLACE CULVERT PIPE
LIN FT
800
$40.00
$32,000.00
21
SALVAGE AND REINSTALL APRON
EACH
13
$400.00
$5,200.00
Subtotal
$788,250.00
+10% Contingencies
$78,825.00
Subtotal
$867,075.00
30% Indirect Costs
$260,122.50
Schedule A - Watermain Improvements
$1,127,197.50
* Note: Private easements may be required and are not included in cost opinion.
City of Rosemount a East Side Watermain Extension and Appurtenant Work
Feasibility Report - City Project No. 320
WSB Project No. 1252 -00 Page 15
Engineer's Opinion of Probable Cost
East Side Watermain Extension & Appurtenant Work
City of Rosemount
City Project No. 320
Schedule B - Watermain Improvements — Option I
I t e m
Description
Unit
Quanti Unit C
Total Cost
1
CONNECT TO EXISTING WATERMAIN
EACH
1
$500.00
$500.00
2
12" WATERMAIN — DUCT IRON CL 52
LIN FT
5000
$30.00
$150,000.00
3
20" CASING FOR JACKING 12" WATERMAIN LIN FT
75
$220.00
$16,500.00
(UNDER RAILROAD)
4
6" WATERMAIN — DUCT IRON CL 52
LIN FT
100
$20.00
$2,000.00
5
FURNISH AND INSTALL HYDRANT
EACH
4
$1,500.00
$6,000.00
6
12" GATE VALVE AND BOX
EACH
4
$1,000.00
$4,000.00
7
6" GATE VALVE AND BOX
EACH
4
$500.00
$2,000.00
8
4" GATE VALVE AND BOX
EACH
1
$400.00
$400.00
9
DUCTILE IRON FITTINGS
POUND
3,000
$1.00
$3,000.00
10
SEEDING
ACRE
2.5
$1,500.00
$3,750.00
Subtotal
$188,150.00
+10% Contingencies
$18,815.00
Subtotal
$206,965.00
30% Indirect Costs
$62,089.50
Schedule B — Watermain Improvements — Option 1
$269,054.50
GRAND TOTAL
$1,396,252.00
* Note: Private easements may be required and are not included in cost opinion.
City of Rosemount N East Side Watermain Extension and Appurtenant Work
Feasibility Report - City Project No. 320
WSB Project No. 1252 -00
Page 16