CITY OF ROSEMOUNT
EXECUTIVE SUMMARY FOR ACTION
CITY COUNCIL MEETING, DATE: February 15, 2000
AGENDA ITEM: Receive Feasibility Report /Set Public
AGENDA SECTION:
Hearing -2000 Street & Utility Reconstruction Improvements,
Old Business
City Project #316
PREPARED BY: Bret Weiss, Consulting Engineer /WSB &
AGENDfM -01 n A
Associates
ATTACHMENTS: Resolution, Executive Summary, Funding
APPROVED BY:
Summary, Drawing
On November 2, 1999 City Council authorized preparation of a Feasibility Heport'to 'c)ddress
street and utility reconstruction for Dodd Boulevard from Chippendale Avenue to Shannon
Parkway and Cimarron Avenue from Dodd Boulevard to 145 Street West. At a later date the
Council added to the project the construction of sanitary sewer and water improvements to
several lots located west of Shannon Parkway on Dodd Boulevard and the consideration of
parking lot improvements at Fire Station #1.
The project will involve street and storm sewer construction that will replace the existing rural
street section and ditches. Some minor utility improvements will be completed along Cimarron
Avenue and watermain will be completed along Dodd Boulevard. The project includes
reconstruction of approximately 3,580 feet of existing streets to a design of a 28 foot wide
street with concrete curb & gutter and storm sewer, an 8 foot wide bike trail will be developed
on the south side of Dodd Boulevard from Shannon Parkway to Chippendale Avenue along with
a connection piece of pathway between Dodd Boulevard and 145" Street at Chippendale
Avenue.
The utility improvements located west of Shannon Parkway involve constructing sanitary sewer
and watermain as necessary to provide sewer and water services to a number of properties
that are in current need or have non - complying septic systems. The parking lot improvements
for Fire Station #1 include providing options for additional parking stalls at the facility to
accommodate the use of the existing meeting room. The options have been identified in the
Feasibility Report.
The funding for the project will be provided from various sources including Municipal State Aid,
assessments, 2000 Capital Improvement funds and utility funds as necessary. The total
estimated project cost is $ 1,161,000. Staff will provide a brief overview of the project and
open up to any questions you may have. If the project is approved by the Council and moves
forward, a public hearing will be set for March 6, 2000 to consider the improvements. Staff
proposes an informational meeting be held the week of February 21, 2000 for the affected
operty owners. 5tatt recommenas aaopung ule dudcneu IdbUI
RECOMMENDED ACTION: MOTION TO ADOPT A RESOLUTION RECEIVING THE
FEASIBILITY REPORT AND SETTING A PUBLIC HEARING FOR THE 2000 STREET AND
UTILITY RECONSTRUCTION IMPROVEMENTS, CITY PROJECT #316.
COUNCIL ACTION:
3
.1-k
CITY OF ROSEMOUNT
DAKOTA COUNTY, MINNESOTA
RESOLUTION 2000 -
A RESOLUTION RECEIVING THE FEASIBILITY REPORT AND SETTING THE PUBLIC HEARING
FOR THE 2000 STREET AND UTILITY RECONSTRUCTION IMPROVEMENTS
CITY PROJECT #316
WHEREAS, the City Council deemed it necessary and expedient that the City of Rosemount, Minnesota, construct
certain improvements, to -wit: City Project #316, 2000 Street & Utility Reconstruction Improvements, in the City as
described in and in accordance with the feasibility report prepared by the City Engineer; and
WHEREAS, the City Council has been advised by the City Engineer that said utility and street improvements, City
Project #316 is feasible, and should best be made as proposed, and the City Engineer's report to this effect has
heretofore been received by Council, and filed with the City Clerk on February 15, 2000; and
WHEREAS, the statute provided that no such improvements shall be made until the Council has held a public hearing
on such improvements following mailed notice and two publications thereof in the official newspaper stating time and
place of the hearing, the general nature of the improvement, the estimated costs thereof, and the area proposed to be
assessed, in accordance with the law.
NOW THEREFORE BE IT RESOLVED, the City Council of the City of Rosemount accepts the feasibility report for City
Project #316 and places it on file.
NOW THEREFORE IT BE FURTHER RESOLVED, by the City Council of the City of Rosemountthat the public hearing
be scheduled to consider City Project #316, 2000 Street & Utility Reconstruction Improvements to be held on Tuesday,
March 6, 2000 at 8:00 o'clock p.m. or as soon thereafter as possible, in the Council Chambers of the City Hall.
ADOPTED this 15th day of February, 2000.
Cathy Busho, Mayor
ATTEST:
Linda Jentink, City Clerk
Motion by:
Voted in favor:
Seconded by:
Voted again
EXECUTIVE SUMMARY
City Project No. 316 provides for the reconstruction of Dodd Boulevard from Shannon Parkway to
Chippendale Avenue and Cimarron Avenue from Dodd Boulevard to 145 Street West. This project
also includes providing sanitary sewer and/or watermain service to homes on Dodd Boulevard
between Danville Avenue and Shannon Parkway, as well as considering the construction of
additional parking within the fire station property located at the intersection of Dodd Boulevard and
Shannon Parkway.
The project includes the reconstruction of approximately 3,580 feet of 24 -foot rural section streets
to 28 -foot wide urban- section streets, including bituminous paving, B -618 concrete curb and gutter,
storm sewer, watermain, and sidewalks /pathways. The project may include sanitary sewer and
watermain improvements along Dodd Boulevard west of Shannon Parkway. The street improvement
project is separated into three segments:
Segment 1 - Dodd Boulevard (Shannon Parkway to Chippendale Avenue):
This segment will consist of an upgrade from a rural roadway to a 28 -foot wide urban
roadway. This street will consist of one through traffic lane in each direction with no on-
street parking.
This portion of the improvement project will consist of the complete reconstruction of the
roadway and will include the addition of an eight -foot wide bike trail on the south side of
Dodd Boulevard. Dodd Boulevard is part of the City's state -aid roadway system, and the
roadway design is subject to all current state -aid standards.
Segment 2 - Cimarron Avenue (Dodd Boulevard to 145 Street West):
This segment will be reconstructed to a 28 -foot wide urban section. The street will have one
through traffic lane in each direction with no on- street parking available. This portion of the
improvement project will include a complete reconstruction of the street section. Portions
of the eight -inch sanitary sewer line will be replaced as necessary to correct structural or
infiltration problems.
City of Rosemount — Feasibility Report
Dodd Boulevard Improvements and Appurtenant Work , /'��
City Project No. 316 �/�/
S.A.P. No. 208- 112-01 d ,�,�r
WSB Project No. 1210.00
�� I T r — r - '-)KIT G7 I H T ^1nCCl -I �r aim as • c� c�c�a� —G A —R� a
FEB -09 -2000 09 Oe WSB & ASSOCIATES INC. 6125411700 P.03iO4
00'olzi - ON pafo -id gSM
'"� "'°'''°`^• v TO T 'ou 'd "d'S
Q 9T£'oN pa!old � ?J
O- KaoM insaapnddd puv sivawaeoldmT p.iBnalnog ppoq
uodag ,yplgissa3 — lunoarasog jo )4!J
•u!2joq posodold se- palonilsuoo
aq pinogs put? luTodpuels SuuanuiSua ue uio.J anpoaJJa - lsoo PU8 f.Tessaoau `ajgjm;3 si ioafoid sTTIZ
'OOOZ3o IM au} ut Plau oq llTm guueaq
luauissasse oqs '0002 UT suulT uoTxesoisal puE SuTnEd llE SuTpnlouT `pa1alduzoo oq mo loofosd
OLU Xnssaoau n spun] X111nn put? spun] (jo) ueld Juaulanoadurl IelTdvo OOOZ `SuTPur3 vsw
`sIuauissasseJo IsTsuoo llt^% IoaCordat ion SuTpun3 '001`191`1$ sT Isoo Ioafozd polLuuiso l aLU
pienalnog PPoQ SS8bl ye uialgoid uia;sXs oTidas SumCjdwoo - uou v amIA3lle
of se llom se paau ;uo.zmo uT am 1eT41 sagiadoid jo saqumu a of sooT.nsas mlt?yy� pue iaAA,as
apTno.id of fuessooau su um =ajt?m puE lamas famms gunon nsuoo jo sIsTSUOo luoul2os S u.I,
r j :(Se,bj. vd uounggg off. anaand aCivag(l) piBnainog ppoQ - C IaaTnVa$
FEB -09 -2000 10:49 WSB & ASSOCIATES INC.
4. FIN A.N C:1N G
4.1
4.2
Cost Opinion
6125411700 P.02iO3
Detailed cost estimates can be found in the Appendix of this report. These estimates
incorporate 2000 construction costs, and include a 10% contingency factor and all
administrative costs. The administrative costs are estimated at 30% and include legal,
engineering, interest and other administrative items. A summary of the project costs is as
follows:
Funding
Funding for the project will consist of a combination of assessments, municipal state -aid,
2000 CIP funds, Stormwater Core Fund, Sanitary Sewer Core Fund, and the Water Operating
Fund.
Since this is a street reconstruction project, the benefitting property owners will be assessed
according to City Policy. Based on the policy, single - family residential properties without
existing curb and gutter are assessed $2,400 each for street improvements.
For high- density residential and commercial properties, the City has typically utilized an
assessment method based on a typical roadway cost that includes curb and gutter and storm
sewer.
In this case, the assessment is based on one -half of the cost of a typical 28 -foot wide street,
which amounts to $35.00 per front foot.
City of Rosemount — Feasibility Report
Dodd Boulevard Improvements and Appurtenant Work A
City Project No. 316 WSB
S.A.P. No. 208.112 -01 Miaiiiil
WSS Project No. 1210.00
Page 10
Dodd Boulevard
Cimarron
Avenue
Sewer Service
Water Service
Fire Station
Total I
S treets
$627,291
$95,946
$723,237
anitary Sewer
$8,637
+�... $59,724
$68,361
atermain
892,156
S43,289
$53,743
$189,188
S torm Sewer
$140,076
811,076
530,00
$151,152
$30,000
F ire Station
P arking Lot
oral
$859,523
$158,948
$59,7
$53,743
$30,000 $1,161,938
Funding
Funding for the project will consist of a combination of assessments, municipal state -aid,
2000 CIP funds, Stormwater Core Fund, Sanitary Sewer Core Fund, and the Water Operating
Fund.
Since this is a street reconstruction project, the benefitting property owners will be assessed
according to City Policy. Based on the policy, single - family residential properties without
existing curb and gutter are assessed $2,400 each for street improvements.
For high- density residential and commercial properties, the City has typically utilized an
assessment method based on a typical roadway cost that includes curb and gutter and storm
sewer.
In this case, the assessment is based on one -half of the cost of a typical 28 -foot wide street,
which amounts to $35.00 per front foot.
City of Rosemount — Feasibility Report
Dodd Boulevard Improvements and Appurtenant Work A
City Project No. 316 WSB
S.A.P. No. 208.112 -01 Miaiiiil
WSS Project No. 1210.00
Page 10
FEB -09 -2000 10:49 WSB & ASSOCIATES INC.
Funding for the project can be summarized as follows:
received at that time for the Dodd Boulevard project. They have been included as part of the total.
•• A funding source for the fire station improvements has not yet been identified.
For the properties located along Dodd Boulevard west of Shannon Parkway that will be
provided water or sewer service, the policy is to assess $12 per front foot for watermain, and
$17.50 per front foot for sanitary sewer. The cost of the service line from the main to the
property line is also assessed. In addition to the assessments, a number of fees will be
applicable to the individual properties. Typically, these are due at the time the property
owner connects to the utility. The Council could consider allowing property owners to
include the fee amounts in their assessments. The applicable changes are summarized as
b1a'J411 ron r. U-)/ U-)
follows:
Water Availability (WAC)
ater Service
SewerService
Sewer Availability
City Sewer Availability
Total
$5,000 (1" meter)
$5,000 (1" meter)
$1,100 /SAC unit
$1,400 /SAC unit ;
$2,500 /SAC unit
The sanitary sewer fees outlined in the table are based on the number of SAC units
associated with a land use. Single - family residential properties are typically equivalent to
one SAC unit. Since all of the affected properties are single- family residential, it is likely
that they will each be considered as one SAC unit.
City of Rosemount - Feasibility Report
Dodd Boulevard Improvements and Appurtenant Work Iw,�p
City Project No. 316 WSB
S.A.P. No. 208-112 -01
WSB Project No. 1210.00
Page 11
TOTAL P.03
sanitary
Water
Fire i
Stormwatcr
Sewer
Operating
Station___
Assessments
MSA
Core Fund
Core Fund
Fund
2000 C.I.P.
Total
Streets
* S 197
$455,26
—
—�_
$21,709
$674,389 ;
5200,000
Storm
$200,000
Watermain ...._._.,__M._
_
$12,246
-_ -
S 10,000
S166
_ _ $184,188
$68,361
Sanitary Sewer
$17,012
__$
$41,349
Parking Lot at
$30,000 $30,000
Total
$226,67
$455,2
$200,000
$10,000
$10,000
$230,000 530,000
$1,161,938 ;
M o. -,.oi Mt Q —, A PVP1n r%AA cc nart nfehe Wenemann V and 10 Addition moiects. Assessments totaling $86,124 were
received at that time for the Dodd Boulevard project. They have been included as part of the total.
•• A funding source for the fire station improvements has not yet been identified.
For the properties located along Dodd Boulevard west of Shannon Parkway that will be
provided water or sewer service, the policy is to assess $12 per front foot for watermain, and
$17.50 per front foot for sanitary sewer. The cost of the service line from the main to the
property line is also assessed. In addition to the assessments, a number of fees will be
applicable to the individual properties. Typically, these are due at the time the property
owner connects to the utility. The Council could consider allowing property owners to
include the fee amounts in their assessments. The applicable changes are summarized as
b1a'J411 ron r. U-)/ U-)
follows:
Water Availability (WAC)
ater Service
SewerService
Sewer Availability
City Sewer Availability
Total
$5,000 (1" meter)
$5,000 (1" meter)
$1,100 /SAC unit
$1,400 /SAC unit ;
$2,500 /SAC unit
The sanitary sewer fees outlined in the table are based on the number of SAC units
associated with a land use. Single - family residential properties are typically equivalent to
one SAC unit. Since all of the affected properties are single- family residential, it is likely
that they will each be considered as one SAC unit.
City of Rosemount - Feasibility Report
Dodd Boulevard Improvements and Appurtenant Work Iw,�p
City Project No. 316 WSB
S.A.P. No. 208-112 -01
WSB Project No. 1210.00
Page 11
TOTAL P.03
7
;a4ft
0
P44
(4)
9)
�e�
ArMF
P
UD
A
2000 Street and Utility
Reconstruction Project
Dodd Boulevard and
Cimarron Avenue
Street, Utility Improvements
and Appurtenant Work
City Project Number: 316
S.A.P. No. 208 - 112 -01
WSB Proj. No. 1210.00 February 15, 2000
Submitted to:
City of Rosemount
2875 145th Street West
Rosemount, Minnesota 55068
1
A
350 Westwood Lake Office
Bo
54 Wayzata ulevard
t
WSB
Minneapolis, 55426
612 - 541 -4800
& Associates, Inc.
FAX 541 -1700
INFRASTRUCTURE
- ENGINEERS - PLANNERS
for the City of
FEASIBILITY REPORT
2000 STREET AND UTILITY
RECONSTRUCTION PROJECT
CITY OF ROSEMOUNT
CITY PROJECT NO. 316
S.A.P. NO. 208-112-01
February 15, 2000
Prepared By:
WSB & Associates, Inc.
350 Westwood Lake Office Park
8441 Wayzata Boulevard
Minneapolis, MN 55426
(612) 541 -4800
(612) 541 -1700 (Fax)
City of Rosemount — Feasibility Report
2000 Street and Utility Reconstruction Project
City Project No. 316
S.A.P. No. 208 - 112 -01
WSB Project No. 1210.00
WSB
&
WSS
& Associates, Inc.
February 15, 2000
Honorable Mayor and City Council
City of Rosemount
2875 145 Street West
Rosemount, MN 55068 -4997
612- 541 -4800
FAX 541 -1700
Re: Feasibility Report
' 2000 Street and Utility Reconstruction Project
City of Rosemount Project No. 316
' S.A.P. No. 208 - 112 -01
WSB Project No. 12 10. 00
B.A. Mittelsteadt, P.E.
Bret A. Weiss, P.E.
Peter R. Willenbring, P.E.
Donald W. Sterna, P.E.
Ronald B. Bray, P.E.
Dear Mayor and Council Members:
Transmitted herewith is a feasibility report which addresses street and utility improvements on Dodd
Boulevard, from Shannon Parkway to Chippendale Avenue and Cimarron Avenue, from Dodd
Boulevard to 145' Street West.
' We would be happy to discuss this report with you at your convenience. Please don't hesitate to
contact me at (612) 541 -4800 if you have any questions regarding this report.
I Sincerely,
WSB & Associates, Inc.
Bret A. Weiss, P.E.
' Vice President
Encl
Minneapolis St. C l o u d
' Infrastructure Engineers Planners
EQUAL OPPORTUNITY EMPLOYER
350 Westwood Lake Office
8441 Wayzata Boulevard
Minneapolis, MN 55426
CERTIFICATION
I hereby certify that this plan, specification or report was prepared by
me or under my direct supervision and that I am a duly Registered
Professional Engineer under the laws of he State of Minnesota.
Bret A. Weiss, P.E.
Date: February 15, 2000
Reg. No. 20753
City of Rosemount — Feasibility Report
2000 Street and Utility Reconstruction Project
City Project No. 316
S.A.P. No. 208 - 112 -01
WSB Project No. 1210.00
, A
W SB
& dasocwlu, Irtc.
TABLE OF CONTENTS
' TITLE SHEET
LETTER OF TRANSMITTAL
CERTIFICATION SHEET
' TABLE OF CONTENTS
EXECUTIVE SUMMARY
r
1. INTRODUCTION .................. ............................... Pagel
1.1 Authorization
1.2 Scope
1.3 Data Available
2. GENERAL BACKGROUND ......... ............................... Page 3
2.1 Project Location (See Figure 1)
2.2 Project Zoning (See Figures 2 -3)
2.3 Project History
2.4 Existing Conditions
2.5 Traffic Analysis (See Figure 11)
3. PROPOSED IMPROVEMENTS ...... ............................... Page 6
3.1 Roadway (See Figures 6 -9)
3.2 Storm Sewer (See Figures 6 -9)
3.3 Watermain (See Figures 4 -9)
3.4 Sanitary Sewer (See Figures 4 -5, 6 -9)
3.5 Sanitary Sewer (See Figures 4, 6 - 9)
3.6 Fire Station Parking Lot Improvements (Figure 10)
3.7 Pathway / Sidewalk (Figures 6 -9)
3.8 Street Lights
3.9 Right -of -Way and Easements
3.10 Permits / Approvals
3.11 Detour Routes
4. FINANCING ..................... ............................... Page 11
4.1 Cost Opinion
4.2 Funding
5. PROJECT SCHEDULE ............ ............................... Page 13
6. FEASIBILITY AND RECOMMENDATION ......................... Page 14
City of Rosemount — Feasibility Report
2000 Street and Utility Reconstruction Project ,� A
City Project No. 316 WSB
S.A.P. No. 208 - 112 -01
WSB Project No. 1210.00
APPENDIX A ........................... ............................... Page 15
' PROJECT LOCATION MAP
APPENDIX B ........................... ............................... Page 16
' OPINION OF PROBABLE COST
APPENDIX C ........................... ............................... Page 29
I TRAFFIC COUNTS / PAVEMENT DESIGN
' APPENDIX D ........................................................... Page 31
PRELIMINARY ASSESSMENT ROLL
City of Rosemount — Feasibility Report
' 2000 Street and Utility Reconstruction Project /,/A
City Project No. 316 WSB
S.A.P. No. 208 - 112 -01
WSB Project No. 1210.00 &A. fa(es, I=
k
0
EXECUTIVE SUMMARY
City Project No. 316 provides for the reconstruction of Dodd Boulevard from Shannon Parkway to
Chippendale Avenue and Cimarron Avenue from Dodd Boulevard to 145`" Street West. This proj ect
also includes providing sanitary sewer and/or watermain service to homes on Dodd Boulevard
between Danville Avenue and Shannon Parkway, as well as considering the construction of
additional parking within the fire station property located at the intersection of Dodd Boulevard and
Shannon Parkway.
The project includes the reconstruction of approximately 3,580 feet of 24 -foot rural section streets
to 28 -foot wide urban- section streets, including bituminous paving, B -618 concrete curb and gutter,
storm sewer, watermain, and sidewalks /pathways. The project may include sanitary sewer and
watermain improvements along Dodd Boulevard west of Shannon Parkway. The street improvement
project is separated into three segments:
• Segment 1 - Dodd Boulevard (Shannon Parkway to Chippendale Avenue):
This segment will consist of an upgrade from a rural roadway to a 28 -foot wide urban
roadway. This street will consist of one through traffic lane in each direction with no on-
street parking.
This portion of the improvement project will consist of the complete reconstruction of the
roadway and will include the addition of an eight -foot wide bike trail on the south side of
Dodd Boulevard. Dodd Boulevard is part of the City's state -aid roadway system, and the
roadway design is subject to all current state -aid standards.
• Segment 2 - Cimarron Avenue (Dodd Boulevard to 145" Street West):
This segment will be reconstructed to a 28 -foot wide urban section. The street will have one
through traffic lane in each direction with no on- street parking available. Occasionally, cars
do park along the edge of Cimarron Avenue, but with the available parking for each property,
there is not a need to provide parking. This portion of the improvement project will include
a complete reconstruction of the street section. Portions of the eight -inch sanitary sewer line
will be replaced as necessary to correct structural or infiltration problems. Portions of the
eight -inch sanitary sewer line will be replaced as necessary to correct structural or infiltration
problems.
City of Rosemount — Feasibility Report
2000 Street and Utility Reconstruction Project
City Project No. 316 WSB
S.A.P. No. 208 - 112 -01
WSB Project No. 1210.00 &,u «�, °''"`
i
0
L J
• Segment 3 - Dodd Boulevard (Danville Avenue to Shannon Parkway):
This segment consists of constructing sanitary sewer and watermain as necessary to provide
sewer and water services to a number of properties that are in current need as well as to
alleviate a non - complying septic system problem at 14885 Dodd Boulevard.
The total estimated project cost is $1,173,000. Funding for the project will consist of assessments,
MSA funding, 2000 Capital Improvement Plan (CIP) funds and utility funds as necessary. The
project can be completed, including all paving and restoration items in 2000. The assessment
hearing will be held in the fall of 2000.
This project is feasible, necessary and cost - effective from an engineering standpoint and should be
constructed as proposed herein.
City of Rosemount — Feasibility Report
2000 Street and Utility Reconstruction Project
City Project No. 316
S.A.P. No. 208 - 112 -01
WSB Project No. 1210.00
WSB
& Arsocialu, !nc
s
1. INTRODUCTION
1.1 Authorization
On November 2, 1999, the Rosemount City Council authorized the preparation of an
engineering feasibility report for the 2000 Street and Utility Reconstruction Project. This
project has been designated as City Project No. 316 and State -Aid Project No. (S.A.P.) 208-
112-01.
1 1.2 Scope
P
J
This project primarily provides for the upgrading of existing Dodd Boulevard from Shannon
Parkway to Chippendale Avenue and Cimarron Avenue from Dodd Boulevard to 145 Street
West. Dodd Boulevard was previously designated as a Municipal State -Aid street due to the
projected traffic volumes and its benefit to the overall Rosemount street system.
Consequently, this project will utilize Municipal State Aid (MSA) funds and must be
designed according to state -aid standards.
Both Dodd Boulevard and Cimarron Avenue will be completely reconstructed, with the
installation of concrete curb and gutter and bituminous pavement to convert the streets into
urban roadways. Storm sewer improvements are proposed to collect stormwater runoff in
accordance with Municipal State -Aid standards and as necessary to facilitate improvements
outlined in the Rosemount Comprehensive Storm Water Management Plan. The elevation
of the roadway will be lowered in order to eliminate the existing drainage ditches.
Both watermain and sanitary sewer improvements are proposed within Dodd Boulevard
between Danville Avenue and Shannon Parkway. These improvements will provide service
to parcels 29, 30, 31, 32, 33, 34, and 35.
The fire station parking lot will be expanded due to the need for additional parking at Fire
Station No. 1. Two options were considered for increasing the number of parking stalls
available and are outlined within this report.
City of Rosemount — Feasibility Report
2000 Street and Utility Reconstruction Project /A,A
City Project No. 316 WSB
S.A.P. No. 208- 112 -01
WSB Project No. 1210.00 &A Z -1. W 1 W
Page 1
1.3 Data Available
Information and materials used in the preparation of this report include the following:
• City of Rosemount Record Plans
• City of Rosemount Topography Maps
• Field Observations of the Area
• Rosemount Stormwater Management Plan
• Rosemount Water Supply & Distribution Plan
• Field Survey
City of Rosemount — Feasibility Report
2000 Street and Utility Reconstruction Project
City Project No. 316
S.A.P. No. 208 - 112 -01
WSB Project No. 1210.00
Page 2
/�
SQ
& Associa7es, Inc.
2. GENERAL BACKGROUND
2.1 Project Location (See Figure 1)
The project location consists of Dodd Boulevard from Shannon Parkway to Chippendale
Avenue and Cimarron Avenue from Dodd Boulevard to 145" Street West. Minor
construction will occur on Dodd Boulevard between Danville Avenue and Shannon Parkway
and within the fire station property. The entire project is located within Section 30.
2.2 Project Zoning (See Figures 2 -3)
Generally, the project is zoned residential with the exception of the fire station, Kidder Park
and the commercial property located at the intersection of Dodd Boulevard and Chippendale
Avenue.
2.3 Project History
This project was initiated through the recognition of continually deteriorating street
conditions and the need for storm sewer facilities in the project area. This project is included
in the City of Rosemount Capital Improvement Plan. Additionally, the current watermain
system in the project limits has substandard "looping ". The looping of the water system will
provide the area with pressure stability, system reliability in the event of a watermain break,
and improved water circulation.
Generally, record drawings for street, storm sewer, sanitary sewer and watermain are
available.
2.4 Existing Conditions
2.4.1 Roadway Dodd Boulevard was originally a County Road but has since been turned
back to the City. The existing pavement on both Dodd Boulevard and Cimarron
Avenue is in fair to poor condition. Dodd Boulevard is currently a 24 -foot wide
rural roadway that utilizes ditches to drain the roadway surface and provide storm
water conveyance. Cimarron Avenue is a 28 -foot wide roadway without curb and
gutter. Considering the existing condition of the roadway surfaces, poor subgrade
material, and the need to lower the roadway for drainage purposes, a complete
reconstruction of these roadways is necessary.
City of Rosemount — Feasibility Report
2000 Street and Utility Reconstruction Project I A "
City Project No. 316 SB
S.A.P. No. 208 - 112 -01
WSB Project No. 1210.00
Page 3
'
There are 19 driveways within the project area, including both the residential and
commercial accesses. All driveways will be reconstructed to the right -of -way line
or as needed to match the new street grades.
'
2.4.2 Storm Sewer The proposed project is located in the Wachter Lake Drainage District
in Rosemount Comprehensive Stormwater Plan.
(WA) as noted the The existing
'
storm sewer system for the project area is limited to collection at the following
'
locations:
' A 27 -inch trunk storm sewer line within Cimarron Avenue, flowing from
north to south.
• A 12 -inch outlet from pond WA -111, located on the north side of Dodd
Boulevard at Covington Avenue. This 12 -inch outlet extends from Pond
' WA -111 to the intersection of Dodd Boulevard and Covington Avenue.
From there, the storm sewer increases to a 15 -inch pipe and flows to the
' south, draining to the trunk storm sewer system in the Carrollton 2 ° and 31d
Additions.
' Currently, all local drainage along Dodd Boulevard is collected in the roadway
ditches. The ditches flow into the existing storm sewer systems located on Cimarron
' Avenue and Covington Avenue. Cimarron Avenue has four existing catch basins at
the street's low point, where runoff is collected in the 27 -inch storm sewer pipe.
'
2.4.3 Watermain The existing watermain network consists of a six -inch watermain line
within Cimarron Avenue, a 16 -inch trunk watermain crossing Dodd Boulevard at
'
Covington Avenue, six -inch watermain in Chrome Avenue extending up to Dodd
Boulevard, and eight -inch watermain parallel to Dodd Boulevard within the fire
'
station property.
'
2.4.4 Sanitary Sewer The existing sanitary sewer within Dodd Boulevard consists of an
line from Damask Avenue Dallara Avenue,
eight -inch sewer to and an 18 -inch RCP
sewer line from Dallara Avenue to Shannon Parkway, which then flows to the south.
Cimarron Avenue has an eight -inch sewer line flowing from south to north. Closed
circuit televising of the existing sanitary sewer lines has been completed. Portions
of the existing sewer line currently exhibit structural or infiltration problems.
' City of Rosemount — Feasibility Report
2000 Street and Utility Reconstruction Project ,� A
City Project No. 316 WSB
S.A.P. No. 208 - 112 -01 AMMMMINIML
' WSB Project No. 1210.00 &Amy ia/ ,1w.
Page 4
2.4.5 Sidewalk The existing eight -foot bituminous pathway along Dodd Boulevard from
Shannon Parkway to Chrome Avenue is in fair condition. The pathway is located on
' the south side of Dodd Boulevard at varying distances between the edge of the
roadway and the right -of -way.
' 2.5 Traffic Analysis (See Figure 11)
' The project area generally supports typical residential vehicular traffic with the exception of
the fire station traffic. The intersection of Dodd Boulevard with Shannon Parkway is at a
' skewed angle, which created difficult turning movements. City records indicate that there
have been several minor accidents at this intersection in the past. Specifically, 12 minor
accidents have occurred between January 1, 1997 and March 19, 1999. Ideally, Dodd
' Boulevard would meet at right angles on both sides with Shannon Parkway. Because of the
current angle of the roadway, it is not possible to create a perpendicular intersection without
' purchasing additional right -of -way and creating severe impacts on adjoining properties. As
part of this project, the existing free right -turn lanes will be modified slightly to improve the
' operation of the intersection.
City of Rosemount — Feasibility Report
2000 Street and Utility Reconstruction Project lA,A
City Project No. 316 ' SB
S.A.P. No. 208 - 112 -01
' WSB Project No. 1210.00 &Associates, Im
Page 5
3. PROPOSED IMPROVEMENTS
3.1 Roadway (See Figures 6 -9)
The proposed reconstruction of Dodd Boulevard and Cimarron Avenue consists of lowering
the existing grade, modifying the roadway profile, removing poor subgrade soils, and
widening the existing section to the proposed width. Once grading is completed, bituminous
surfacing and B -618 curb and gutter will be constructed. Dodd Boulevard, from Danville
Avenue to Shannon Parkway, will be patched as necessary to accommodate the proposed
water and sewer service improvements. The proposed street sections will generally consist
of 28 -foot wide roadways with no parking and include four inches of bituminous surface and
eight inches of Class 5 aggregate.
3.2 Storm Sewer (See Figures 6 -9)
The storm sewer improvements include the construction of lateral storm sewer lines to serve
the project area and accommodate state -aid standards. Specifically, lateral storm sewer
facilities will be designed to carry the storm water runoff from a 10 -year rainfall event.
Catch basin spacing will be designed in accordance with current state -aid standards. The
proposed storm water collection facilities are as follows:
• Dodd Boulevard:
The storm water from 380 feet west of Cimarron Avenue to Chippendale Avenue
will be collected and discharge into the existing 27 -inch pipe located within
Cimarron Avenue. The storm water from Shannon Parkway to 380 feet west of
Cimarron Avenue will be collected and discharge into Pond No. WA -111.
• Cimarron Avenue:
The storm water on Cimarron Avenue will be collected at the street's low point by
catch basins and discharge into the existing 27 -inch storm sewer.
3.3 Watermain (See Figures 4 -9)
The existing watermain within the project limits ranges from six -inch to 16 -inch diameter.
The pipe is generally cast iron material, however, some of the newer pipes are ductile iron
City of Rosemount — Feasibility Report
2000 Street and Utility Reconstruction Project l A YY
City Project No. 316 SB
S.A.P. No. 208 - 112 -01
WSB Project No. 1210.00 &Am- iw...1-
Page 6
material. Generally, the watermain system is not looped very well. It is proposed that an
' eight -inch watermain be installed within Dodd Boulevard from the 16 -inch watermain at
Chippendale Avenue to the 16 -inch watermain located at Covington Avenue. The new
watermain along Dodd Boulevard will be connected to existing dead -end watermain systems
at Chrome Avenue, Cimarron Avenue, Covington Avenue, and the watermain system
through Parcel No. 3. Construction of the watermain will improve the overall circulation of
' the area's water system. The existing six -inch watermain within Cimarron Avenue will be
replaced with an eight -inch watermain to improve the function of the system.
' Parcels 29, 30, and 35 Fi ure 3) located on Dodd Boulevard just west of Shannon Parkway
( g J Y
' currently do not have water service. It is proposed that an eight -inch watermain be
constructed from the existing eight -inch watermain at the southwest corner of the fire station
property to approximately 530 feet west. This eight -inch line will be extended further west
' in the future when Dodd Boulevard west of Shannon Parkway is reconstructed. The
watermain crossing of Shannon Parkway will be jacked in order to minimize the degradation
t of the roadway. A water service for Parcel 34 will be extended into the property from an
existing watermain on the north side of Dodd Boulevard.
' 3.4 Sanitary Sewer (See Figures 4 -5, 6 -9)
' The existing sanitary sewer systems within the project have been televised to determine their
condition. The televising videos indicate that the sanitary sewer within Dodd Boulevard and
' Cimarron Avenue are in good condition with the exception of some minor deficiencies with
the sanitary sewer within Cimarron Avenue. These deficiencies consist of fractured vitrified
' clay pipe outside each manhole, poor manhole condition, and a partially blocked service line.
These problems will be corrected by replacing the manholes, fractured pipe, and partially
blocked service line to the right -of -way.
On D Boulevard, west of Shannon Parkway, sanitary sewer will e
O odd ou y, ry b constructed as
' required to provide service to parcels 31, 32, 33, and 34 (Figure 3). These parcels either have
non - complying septic systems or are not now connected to the City system. These four
parcels can be served by extending 800 lineal feet of eight -inch PVC westward from the
existing sanitary sewer system located within Damask Avenue.
1
City of Rosemount — Feasibility Report
' 2000 Street and Utility Reconstruction Project ,, A YY
City Project No. 316 SB
S.A.P. No. 208 - 112 -01
' WSB Project No. 1210.00
Page 7
I
3.5 Fire Station Parking Lot Improvements (Figure 10)
City Staff and Council have identified a need for additional parking at Fire Station No. 1 to
accommodate the parking needs during training or seminars held at the fire station.
Currently, there are 40 parking stalls available within the property. For an average fire call,
there is a need for 25 -35 parking spaces. If the training room is in use, up to 35 additional
spaces are needed, resulting in an overall need of approximately 70 spaces.
As part of this study, three options were considered for increasing the amount of available
parking. The options are detailed as follows:
• Option 1 - Expand the existing parking lot Additional parking could be constructed
by expanding the existing parking lot to the south. This would result in up to 18
additional parking stalls. In order to construct the parking lot in this manner, a
variance to the setback requirements is necessary. To accommodate the parking
needs, an additional 12 spaces would be constructed along the east side of the
property.
Option 2 - On- street PaddM Dodd Boulevard could be constructed to allow for
diagonal parking along the north side of the roadway adjacent to the station. This
would result in the addition of 25 parking stalls. A sidewalk would be constructed
adjacent to the parking area and connect to the existing entrance. An advantage to
this concept is the ability to fund the improvements using state -aid dollars.
Disadvantages include vehicle conflicts on Dodd Boulevard and a lack of
connectivity with the fire station property.
Generally, the cost of the additional parking will be similar regardless of the option. Adding
parking adjacent to Dodd Boulevard would result in a slightly lower cost.
3.6 Pathway / Sidewalk (Figures 6 -9)
Pathway construction will consist of an eight -foot wide bituminous pathway located on the
south side of Dodd Boulevard from Shannon Parkway to Chippendale Avenue. There will
also be a sidewalk constructed on the west side of Chippendale Avenue from Dodd
Boulevard to 145` Street West, where it will connect to the existing six -foot concrete walk
along 145 Street West.
City of Rosemount — Feasibility Report
2000 Street and Utility Reconstruction Project ,,/A
City Project No. 316 WSB
S.A.P. No. 208 - 112 -01
WSB Project No. 1210.00
Page 8
1
1
The existing bituminous pathway on the north side of Dodd boulevard from 140 feet east of
Cimarron Avenue to the chrome Avenue area will be removed and not replaced.
3.7 Street Lights
The existing street lights within the project limits are adequate and will remain in place.
3.8 Right -of -Way and Easements
Currently, Dodd Boulevard consists of a right -of -way (ROW) varying in width between 70
and 90 feet that will be adequate to construct this project with the exception of temporary
easements required to match the existing driveways with the new roadway.
It will be necessary to acquire a roadway easement for Cimarron Avenue across the property
located at 14619 Dodd Boulevard. The easement needs to be approximately 20 feet in width
along the west side of the property. City Staff will work with the property owner to acquire
the easement.
3.9 Permits / Approvals
The following permits will be necessary as part of this project.
• Minnesota Department of Health permit for the watermain extensions;
• Minnesota Pollution Control Agency (MPCA) permit for sanitary sewer extensions;
' 0 MPCA National Pollutant Discharge Elimination System (NPDES) permit;
• Metro State -Aid approval of Dodd Boulevard construction plans.
3.10 Detour Routes
' Detour signing will be required to minimize traffic congestion in the construction area and
to route residents and patrons to their destinations. All business and residences will have
access during construction, however, some inconvenience is expected. Directional signing
will be provided, including advance notice signing for the start of construction. Detour
routes will be discussed with affected property owners during the informational meeting.
City of Rosemount — Feasibility Report
2000 Street and Utility Reconstruction Project ,,/A
City Project No. 316 WSB
S.A.P. No. 208 - 112 -01
t WSB Project No. 1210.00 &.'g`°"°„,
Page 9
4.
1
1
FINANCING
Cost Opinion
Detailed cost estimates can be found in the Appendix of this report. These estimates
incorporate 2000 construction costs, and include a 10% contingency factor and all related
administrative costs. The administrative costs are estimated at 30% and include legal,
engineering, interest and other administrative items. A summary of the project costs is as
follows:
Funding
Funding for the project will consist of a combination of assessments, municipal state -aid,
2000 CIP funds, Stormwater Core Fund, Sanitary Sewer Core Fund, and the Water Operating
Fund.
Since this is a street reconstruction project, the benefitting property owners will be assessed
according to City Policy. The preliminary assessment roll is included in Appendix D.
Based on the policy, single - family residential properties without existing curb and gutter are
assessed $2,400 each for street improvements. For high- density residential and commercial
properties, the City has typically utilized an assessment method based on a typical roadway
cost that includes curb and gutter and storm sewer. In this case, the assessment is based on
one -half of the cost of a typical 28 -foot wide street, which amounts to $35.00 per front foot.
City of Rosemount — Feasibility Report
2000 Street and Utility Reconstruction Project A
City Project No. 316 WSB
S.A.P. No. 208 - 112 -01
WSB Project No. 1210.00
Page 10
Dodd Boulevard
Cimarron
Avenue
Sewer Service
Water Service
Fire Station Total
Streets
$628,449
$95,946
$724,3951
Sanitary Sewer
$8,637
$59,724
$68,361
atermain
$92,156
$43,289
$53,743
$189,188
Storm Sewer
$140,076
$11,076
$151,152
ire Station
Parking Lot
$39,890
$39,890
otal
$860,681
$158,948
$59,72
$53,743
$39,8901
$1,172,986
Funding
Funding for the project will consist of a combination of assessments, municipal state -aid,
2000 CIP funds, Stormwater Core Fund, Sanitary Sewer Core Fund, and the Water Operating
Fund.
Since this is a street reconstruction project, the benefitting property owners will be assessed
according to City Policy. The preliminary assessment roll is included in Appendix D.
Based on the policy, single - family residential properties without existing curb and gutter are
assessed $2,400 each for street improvements. For high- density residential and commercial
properties, the City has typically utilized an assessment method based on a typical roadway
cost that includes curb and gutter and storm sewer. In this case, the assessment is based on
one -half of the cost of a typical 28 -foot wide street, which amounts to $35.00 per front foot.
City of Rosemount — Feasibility Report
2000 Street and Utility Reconstruction Project A
City Project No. 316 WSB
S.A.P. No. 208 - 112 -01
WSB Project No. 1210.00
Page 10
Fi
Funding for the project can be summarized as follows:
Funding Summary
' * Parcel No. 8 was developed as part of the Wensmann 9' and 10 Addition projects. Assessments totaling $86,124 were
received at that time for the Dodd Boulevard project. They have been included as part of the total.
** A funding source for the fire station improvements has not yet been identified.
�l
n
For the properties located along Dodd Boulevard west of Shannon Parkway that will be
provided water or sewer service, the policy is to assess $12 per front foot for watermain, and
$17.50 per front foot for sanitary sewer. The cost of the service line from the main to the
property line is also assessed. In addition to the assessments, a number of fees will be
applicable to the individual properties. Typically, these are due at the time the property
owner connects to the utility. The Council could consider allowing property owners to
include the fee amounts in their assessments. The applicable changes are summarized as
follows:
Fee
Assessments
j MSA
Stormwater
Core Fund
Sanitary . Water Fire
Sewer i Operating ! Station **
Core Fund ! Fund ! 2000 C.I.P. Total
Streets $165 86 �
$487 97
$1,100 /SAC unit
City Sewer Availability (SAC)
$21,709 $67 5,547
Storm
Total
$2,200 ( meter)
$200,000
! $200,000
W atermain
$12,246
$10,000
$166,942 $189,
Sanitary Sewer
$17,01
$10,000
$41,349
$ 68,361
Parking Lot at
$39,890 $39,890
Total
$195,122
$487,97
$200,000
$10,000
$10,000
$230,000
$39,890 $1,172,986
i
' * Parcel No. 8 was developed as part of the Wensmann 9' and 10 Addition projects. Assessments totaling $86,124 were
received at that time for the Dodd Boulevard project. They have been included as part of the total.
** A funding source for the fire station improvements has not yet been identified.
�l
n
For the properties located along Dodd Boulevard west of Shannon Parkway that will be
provided water or sewer service, the policy is to assess $12 per front foot for watermain, and
$17.50 per front foot for sanitary sewer. The cost of the service line from the main to the
property line is also assessed. In addition to the assessments, a number of fees will be
applicable to the individual properties. Typically, these are due at the time the property
owner connects to the utility. The Council could consider allowing property owners to
include the fee amounts in their assessments. The applicable changes are summarized as
follows:
Fee
Water Service
Sewer Service
Water Availability (WAC)
$2,200 (%" meter)
Met Council Sewer Availability (SAC)
$1,100 /SAC unit
City Sewer Availability (SAC)
$1,400 /SAC unit
Total
$2,200 ( meter)
$2,500 /SAC unit
The sanitary sewer fees outlined in the table are based on the number of SAC units
associated with a land use. Single - family residential properties are typically equivalent to
one SAC unit. Since all of the affected properties are single - family residential, it is likely
that they will each be considered as one SAC unit.
' City of Rosemount — Feasibility Report
2000 Street and Utility Reconstruction Project /A,-
City Project No. 316 ' SB
S.A.P. No. 208 - 112 -01
WSB Project No. 1210.00 &'�a' °'u r ^°
Page 11
5. PROJECT SCHEDULE
The proposed project schedule for this improvement is as follows:
'
Receive Feasibility Report .... ...............................
February 15, 2000
Informational Meeting ....... ...............................
February 22, 2000
Public Hearing ................ ............................... March 6, 2000
'
Order Plans and Specifications ... ...............................
March 6, 2000
'
Receive Plans and Specifications / Order Ad for Bids ................ May 16, 2000
'
Receive Bids ................. ...............................
June 14, 2000
'
Award Contract ............... ............................... June 20, 2000
Begin Construction .............. ...............................
July 1, 2000
Substantial Construction Completion ...........................
September, 2000
1
1
'
City of Rosemount — Feasibility Report
2000 Street and Utility Reconstruction Project
A
City Project No. 316
/,
' SB
S.A.P. No. 208 - 112 -01
'
WSB Project No. 1210.00
Page 12
6. FEASIBILITY AND RECOMMENDATION
Project costs are estimated at $1,173,000. This cost includes the total street and utility
' reconstruction of Dodd Boulevard from Shannon Parkway to Chippendale Avenue and
Cimarron Avenue from Dodd Boulevard to 145 ' Street West, as well as the utility work on
Dodd Boulevard from Danville Avenue to Shannon Parkway.
Due to the deteriorating condition of the existing streets and some utilities, insufficient
' watermain looping and the need of improving the local drainage system. City Project
No. 316 is feasible, necessary and cost - effective from an engineering standpoint. We
' recommend the reconstruction of the streets, sidewalks and utility improvements as outlined
in this report.
' City of Rosemount — Feasibility Report
2000 Street and Utility Reconstruction Project
City Project No. 316 WSB
S.A.P. No. 208 - 112 -01
' WSB Project No. 1210.00 &ASS"i w. Inc.
Page 13
n
I APPENDIX A
I PROJECT LOCATION MAP
' City of Rosemount — Feasibility Report
2000 Street and Utility Reconstruction Project /AA
City Project No. 316 WSB
S.A.P. No. 208 - 112 -01
' WSB Project No. 1210.00 &
Page 14
LEGEND:
9 PARCEL NO.
URBAN RESIDENTIAL
u HIGH DENSITY RESIDENTIAL
COMMERCIAL
PUBLIC /INSTITUTIONAL
- PARKS AND OPEN SPACE
WIN
Q
X
0 200 400
i
a
0
c;
N
2000 Street and Utility WSB Project No. 1210.00 Date: February 15, 2000
350 Westwood Lake Office
8441 Wayzata Boulevard Reconstruction Project
Minneapolis, MN 55428
W Figure Number
e12- 541 -1900 PARCEL IDENTIFICATION
& FAX 541 -1700 ^
INFRASTRUCTURE - ENGINEERS - PLANNERS Ros emount, Minnesota L
E
- 350 Westwood Lake Office
2000 Street and Utility WSB Project No. 1210.00 Date: February 15, 2000
�//�SB
6441 Wayzata Boulevard Reconstruction Project
Minneapolis, MN 55426 Figure Number
612 - 541 -4800
! � TM FAX 541 -1700 PARCEL IDENTIFICATION
\ INFRASTRUCTURE - ENGINEERS - PLANNERS Rose mount, Minnesota 3
r
1�
- ------ - - - - --
I -
1
DODD 4 I' / 7 /
8 "PVC SANITARY SEWER
BITUMINOUS
RESTORATION
-INSTALL 1" WATERMAIN SERVICE
8 "PVC SANITARY SEWER
LEGEND:
—> PROPOSED SANITARY SEWER
l— PROPOSED WATERMAIN
—» PROPOSED STORM SEWER
PROPOSED STREET CONSTRUCTION
C� PROPOSED BITUMINOUS TRAIL
PROPOSED CONCRETE DRIVEWAY APRON
REMOVE /REPLACE BITUMINOUS
O
- 2000 Street and Utility WSB Project No. 1210.00 Date: February 15, 2000
350 Westwood Lake Office
8441 Wayzata Boulevard Reconstruction Project
l A t
Minneapolis, MN 55426
era
612 - 541-4800 Figure Number
& Assrxiules, Iru. FAX 541 -1700
\ INFRASTRUCTURE - ENGINEERS - PLANNERS Rosemount, Minnesota 4
14930
---- -rDODD BLVD
- 2000 Street and Utility WSB Project No. 1210.00 Date: February 15, 2000
350 Westwood Lake Office
8441 Wayzata Boulevard Reconstruction Project
l A t
Minneapolis, MN 55426
era
612 - 541-4800 Figure Number
& Assrxiules, Iru. FAX 541 -1700
\ INFRASTRUCTURE - ENGINEERS - PLANNERS Rosemount, Minnesota 4
14930
---- -rDODD BLVD
/ 7
e \
PVC SANITARY .SANITARY SEWER
VICINITY MAP
! — " EX. 18"
� 14785
DODD BLVD
14800
DODD ',BLVD
SEWER I
LEGEND:
—> PROPOSED SANITARY SEWER
— PROPOSED WATERMAIN
®' —» PROPOSED STORM SEWER
PROPOSED STREET CONSTRUCTION
a`� 0 PROPOSED BITUMINOUS TRAIL
PROPOSED CONCRETE DRIVEWAY APRON
_ T, REMOVE /REPLACE BITUMINOUS
pl501
0 50 100
- 350 Westwood Lake Office
2000 Street and Utility WSB Project No. 1210.00 Date: February 15, 2000
8441 Wayzata Boulevard Reconstruction Project
W S B Minneapolis, MN 55426 Figure Number
— 612 - 5444800
& Assrx:iates, Imc. FAX 541 -1700
INFRASTRUCTURE - ENGINEERS - PLANNERS Rosemount, Minnesota 5
B _SIGN �� — SIGN
r,
GB
j
i 1 PR POSED PARKING 0
i ,• IMP OVEMENTS `od
00 i I SEE F I G. 10 S�P�
Y n l EX- .16 "WATERMA.IN
I
1 Q
I 0
CASING PIPE PROPOSED
f a, g 3 x/ pp 2 F –FW /8618 CONC.
URB
-- — C AND _ GUTTER
-- — - — -
y 2� ] �ea? - --
(/ �C J 1 I y o/ EX.8 "WATERMAIN
i
i
I
W
0
0
i
� I
�--8 "DIP WATERMAII
LEGEND:
-> PROPOSED SANITARY SEWER
i- PROPOSED WATERMAIN
->> PROPOSED STORM SEWER
PROPOSED STREET CONSTRUCTION
PROPOSED BITUMINOUS TRAIL
PROPOSED CONCRETE DRIVEWAY APRON
— 1 REMOVE /REPLACE BITUMINOUS
X
0 50 100
C� 350 Westwood Lake Office
2000 Street and Utility WSB Project No. 1210.00 Date: February 15 2000
8441 Wayzata Boulevard Reconstruction Project
' SB Minneapolis, MN 55428 Figure Number
rr -- 612-541 aeoo
& Ammiares, lx. FAX 541 -1700 6
INFRASTRUCTURE - ENGINEERS - PLANNERS Ro semount, Minnesota
i
i
I
� 8 "DI
r— EX.8 "WATERMAIN
L
r
EXISTING POND \
WA —P111
NWL =954.5
I
WATERMAIN
H WL =9 5 9. 8�
PROPOSED
28' F —F W /B618 CONC.
CURB AND GUTTER
EX.12 "STORM SEWER
e »r7
N
EX.16 "WATER
LEGEND:
—> PROPOSED SANITARY SEWER
1— PROPOSED WATERMAIN
—» PROPOSED STORM SEWER
PROPOSED STREET CONSTRUCTION
[� PROPOSED BITUMINOUS TRAIL
PROPOSED CONCRETE DRIVEWAY APRON
REMOVE /REPLACE BITUMINOUS
X
0 50 100
350 Westwood Lake Office
2000 Street and Utility WSB Project No. 1210.00 Date: February 15, 2000
6441 Wayzata Boulevard Reconstruction Project
INS+B Minneapolis, MN 55426 Figure Number
- 612- 541-48M
& Associu(es, !x. FAX 541 -1700
\ INFRASTRUCTURE - ENGINEERS - PLANNERS Rosemount, Minnesota 7
IN
s� L 0
IBM
LEGEND:
—> PROPOSED SANITARY SEWER
1— PROPOSED WATERMAIN
—» PROPOSED STORM SEWER
PROPOSED STREET CONSTRUCTION
[� PROPOSED BITUMINOUS TRAIL
PROPOSED CONCRETE DRIVEWAY APRON
REMOVE /REPLACE BITUMINOUS
X
0 50 100
350 Westwood Lake Office
2000 Street and Utility WSB Project No. 1210.00 Date: February 15, 2000
6441 Wayzata Boulevard Reconstruction Project
INS+B Minneapolis, MN 55426 Figure Number
- 612- 541-48M
& Associu(es, !x. FAX 541 -1700
\ INFRASTRUCTURE - ENGINEERS - PLANNERS Rosemount, Minnesota 7
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
145TH STREET V\k
------------ ------- ------
LEGEND:
W --- - ----- PROPOSED SANITARY SEWER
Q PROPOSED WATERMAIN
--------- - - - - -- V - - PROPOSED STORM SEWER
PROPOSED STREET CONSTRUCTION
PROPOSED BITUMINOUS TRAIL
ITARY
REPLACE SAN PROPOSED CONCRETE DRIVEWAY APRON
SEWER MANHOLE REMOVE/REPLACE BITUMINOUS
2
REMOVE SANITARY
SEWER MANHOLE
EX-SANITARY SEWER
AND WATER SERVICE
(TYP)
REPLACE SANITARY
SEWER MANHOLE
.PLACE EX.6"WATERMAIN
ITH 8"DIP WATERMAI
EX.8"SANITARY SEWER
PROPOSED
28' F–F W/B618 CONC.
CURB AND GUTTER
2i w 0
EX.6"WATERMAIN 0 0
EX.8"SANI TARY SEWER
B"DIP WATERMAIN
> & I
<
3492 SF EASEMENT
Z I AQUISITION
0
rY � � I ��
0
0
O
0 0
� PR OPOSED ''
28' F-F W/B618 CONC.
CURB AND GUTTER
0
'60 RGP
/ �, �Gp E 7 \ � G"WATERMAIN
0 50 100
I VICINITY MAP I
350 Westwood Lake Office 2000 Street and Utility WSB Project No. 1210.00 Date: February 15, 2000
A 8441 Wayzata Boulevard Reconstruction Project
WSB Minneapolis, IVIN 55426 Figure Number
612-541-4800
iTMT� FAX 541-1700
INFRASTRUCTURE - ENGINEERS - PLANNERS Rosemount, Minnesota 8
f
L�
u
-kZ /
G;-
8 "DIP WATERMAIN
N
� -/ PROPOSED
E W /8618 CONC.
;oo ,�yGQ ��� CURB AND GUTTER
VICINITY MAP
LEGEND:
—> PROPOSED SANITARY SEWER
— PROPOSED WATERMAIN
—» PROPOSED STORM SEWER
0 PROPOSED STREET CONSTRUCTION
PROPOSED BITUMINOUS TRAIL
PROPOSED CONCRETE DRIVEWAY APRON
REMOVE /REPLACE BITUMINOUS
x
0 50 too
- 350 Westwood Lake Office
2000 Street and Utility WSB Project No. 1210.00 Date: February 15, 2000
8441 Wayzata Boulevard Reconstruction Project
WSB Minneapolis, MN 55426 Figure Number
- 612 - 541 -4800
& Aaaociutea, /m;. FAX 541 -1700 ^
\ INFRASTRUCTURE - ENGINEERS - PLANNERS R osemount, Minnesota y
I
NOTE:
OPTION 2 WILL HAVE SIDEWALK
ALONG THE FRONT OF THE PARKING
STALLS WHICH WOULD THEN EXTEND
NORTHWESTERLY TO THE FIRE STATION.
ni �
LEGEND:
D OPTION 1 PARKING LOT IMPROVEMENTS
0 40 BO
OPTION 2 PARKING LOT IMPROVEMENTS
AL 8441 Westwood Lake Office
2000 Street and Utility WSB Project No. 1210.00 Date: February 15, 2000
6441 Wayzata Boulevard Reconstruction Project
Yr SB Minneapolis, MN 55426 Fig Number
-_ 612_541ASM FIRE STATION
&Associules, /x'. FAX 541 -1700 PARKING IMPROVEMENTS
\ INFRASTRUCTURE - ENGINEERS - PLANNERS Rose mount, Minnesota 10
n
APPENDIX B
I OPINION OF PROBABLE COST
' City of Rosemount — Feasibility Report
2000 Street and Utility Reconstruction Project I� A
City Project No. 316 WSB
S.A.P. No. 208 - 112 -01
' WSB Project No. 1210.00 &AU°"°'�.,�"`
Page 15
t
2000 Street & Utility Reconstruction Project Opinion of Probable Cost
City of Rosemount Project No. 316
S.A.P. 208 - 112 -01
Schedule A - Streets - Dodd Boulevard (Shannon Parkway to Chippendale Avenue)
Item No.
Description
Quantity
Unit
U
1
Mobilization
1
LS
$10 $10,000.00
2
Remove Curb & Gutter
960
LF
$2.00
$1,920.00
3
Remove CMP Culverts 365
LF
$5.00
$1,825.00
4
Remove Sewer Pie Storm
205
LF
$7.00
$1,435.00
j
5
Remove Manhole or Catch Basins
2
EA
$300.00
$600.00
6_
Remove Bituminous Pavement
12050
SY
$2
$24,100.00
7
Sawcut Bituminous Pavement
620
LF
$3.00
t $1, 860.00
8
Salvage Sign Type C
12
EA
$15.00
$180.00 '
9
Common Excavation
26500
CY
$5.00
$132,500.00
10_
Granular Borrow (LV)
3000
CY
$6.00
$18,000.00
11
Sub grade Preparation
31
Rd Sta
$170.00
$5,270.00
12
Aggregate Base 100% Crushed 8"
5150
TN
$8.00
$41,200.00
13
Type 41 Wearing Course 2"
1160
TN
$24.00
$27,84
14
1 Type 31 Base Course Mix 2"
1160
TN
$23.00
' $26,680.00
15
Bituminous Driveway Pavement
415
SY
$17.00
$7,055.00
16
18
Tack Coat
Concrete Curb & Gutter Design B -618
525
6500
Gal
LF
$1.20
$7.00
$630.00
$45,500.00
20
Traffic Control
1
LS
$5,000.00
$5,000.00
21
8" Concrete Driveway Pavement
625
SY
$35.00
$21,875.00
22
F &I Sign Panels Type C
75
SF
$20.00
$1, 500.00
23
F &I Sign Panels, Type D
8
EA
$225.00
$1,800.
24 1
25
4" Solid Double Line - Yellow Epoxy
12" Solid Double Line - White Paint
2900
2900
LF
LF
$0.
$0.35
$2,32 0.00
$1,015.00
26
12" Crosswalk Line - White Epoxy
160
LF
$5.00
$800.00
27
12" Solid Double Line - White Paint
160
LF
$2.00
$320.00
28
8" Bituminous Trail
2625
SY
$10.00 $26,250.00
29
Sodding w /4" Topsoil)
16000
SY
$2.00 ! $32,000.00
Subtotal
+10% Contingencies
Subtotal
+30% Administrative
$439,475.00
$43,947.50
$483,422.50
$145,026.75
Grand T otal
$628,449.25
City of Rosemount - Feasibility Report
2000 Street and Utility Reconstruction Project
City Project No. 316
S.A.P. No. 208 - 112 -01
WSB Project No. 1210.00
YY x B
Aiiiiiink
2000 Street & Utility Reconstruction Project
Street & Utility Improvements and Appurtenant Work
City of Rosemount Project No. 316
S.A.P. 208 - 112 -01
Schedule A - Streets - Cimarron Avenue (Dodd Boulevard to 145 " Street West
Opinion of Probable Cost
Item No. Description Quantity
Unit
Unit
Cost Total
1 Mobilization
1
LS
$5,000.0
$5,000.0
- 2
Remove Curb & Gutter
120
LF
$2.00
$240.00
3
I Remove Sewer Pie Storm
50
LF
$7.00
$350.00
4
Remove Manhole or Catch Basins
5
EA
$300.00
$1,500.
5
Remove Bituminous Pavement
2100
SY
$2.00
$4,200.00
6
Sawcut Bituminous Pavement
200
LF
$3.00
$600.00
7
Salvage Sign Type C
1
EA
$15.00
$15.00
8
1 Common Excavation
1500
CY
$5.00
$7,500.00 J
9
Granular Borrow (LV)
825
CY
$6.00
$4,95
10
Sub grade Preparation
6
Rd Sta
$75.00
$450.00
11
Aggregate Base 100% Crushed 8"
950
TN
$8.00
$7,600.00
12
Type 41 Wearing Course 2"
200
TN
$24.00
$4,800.00
13
Type 31 Base Course 2"
200
TN
$23.00
$4,600.00
14
15
Bituminous Driveway Pavement
Tack Coat
100
100
SY
Gal
$17.00
$1.20
$1,700.00
$120.0
16 ! Concrete Curb & Gutter Desi B -618
17 Traffic Control
1280
1
LF
LS
$7.00
$1,000.0
$8,960.00
$1,000.00
18
8' Concrete Driveway Aron
75
SY
$35.00
$2,625.00
19
F &I Sign Panels, Type C
6.25
SF
$20.00
$125.00
20
F&I Sign Panels, Type D
1
EA
$225.00
$225.00
21
22
4" Solid Double Line - Yellow Epoxy
4" Solid Double Line - Yellow Paint
600
600
LF
LF
$0.80
$i 0 35
$480.00
$210.00
23
Sodding w /4" Topsoil)
1350
SY
$2.00
r $2,700.00
24
Easement Acquisition
1 I
LS
$7,000.0
$7,000.00
Subtotal
+10% Contingencies
$66,950.00
$6,695.00
Subtotal ! $73,645.00
+30% Administrative $22,093.50
Grand Total $95,738.50
City of Rosemount - Feasibility Report
2000 Street and Utility Reconstruction Project A
City Project No. 316 WSB
S.A.P. No. 208- 112 -01
WSB Project No. 1210.00 &°'°.'"c.
2000 Street & Utility Reconstruction Project
Street & Utility Improvements and Appurtenant Work
City of Rosemount Project No. 316
S.A.P. 208-112-01
Schedule B - Sanitary Sewer - Dodd Boulevard (West of Shannon Parkway)
Opinion of Probable Cost
Item No. Description
Quantity
Unit
V WL I.VJ.
Total
1
Remove Bit. Pavement
710
SY
$2.00
$1,420.00
2
Salvage CMP Culverts
3
EA
$200.00
$600.00
3
Sawcut Bituminous Pavement
160
LF
! $3.00
$480 .00
4
Irregular Width Paving
535
SY
I $20.00
5
Bituminous Driveway Pavement
175
SY�
$17.00
_$10,700.00
$2,975.00
6
Connect to Existing Sanitary Manhole
1
EA
$500.00
$500.00
7
4" PVC Sewer Pipe - SDR 26
205
LF
$12.00
$2,460.00
8
8" PVC Sewer Pipe SDR 35
830
LF
$15.00
$12,450.00
9
Construct 48" Dia. Sanitary Manhole
26
LF
$ 130.00
$3,380.00
10 Casting Assembly
2
EA $300.00 $600.00
11
8" x 4" PVC W es
4
EA
$50.00
$200.00
12
Sodding w /4" Topsoil)
2500
SY
$2.00
$5,000.00
13
Traffic Control
1
LS
$1,000.00
$1,000.00
Subtotal
+10% Contingencies
Subtotal
+30% Administrative
$41,765.00
$4,176.50
$45,941.50
$13,782.45
Grand Total
$59,723.95
City of Rosemount — Feasibility Report
2000 Street and Utility Reconstruction Project A
City Project No. 316 WSB
S.A.P. No. 208 - 112 -01
WSB Project No. 1210.00
2000 Street & Utility Reconstruction Project
Street & Utility Improvements and Appurtenant Work
City of Rosemount Project No. 316
S.A.P. 208-112-01
Opinion of Probable Cost
Schedule B - Sanitary Sewer - Cimmaron Avenue (Dodd Boulevard to 145 ' Street West)
Item No.
Description
Quantity
Unit Cost
Unit Total
1
Remove Sanitary Manhole
3
EA
$300.00 $900.00
2 _ Remove Sewer Pie
100
LF
$7.00
$700.0
3
8" PVC Sewer Pipe SDR 35
100
LF
$15.00
$1,500.00
4
5
Construct 48" Dia. Sanitary Manhole
Castin Asseibly
18
2
LF
EA
$130.00 $2,340
$300.00 i $600.00
Subtotal
$6,040.00
+10% Contingencies
$604.00
Subtotal
$6,644.00
+30% Administrative
$1,993.20
Grand Total
$8,637.20
City of Rosemount — Feasibility Report
2000 Street and Utility Reconstruction Project ,,/,�
City Project No. 316 ' SB
S.A.P. No. 208 - 112 -01
WSB Project No. 1210.00 �n :rocrmu,r�.
C'
1
1
2000 Street & Utility Reconstruction Project
Street & Utility Improvements and Appurtenant Work
City of Rosemount Project No. 316
S.A.P. 208-112-01
Schedule C - Watermain - Dodd Boulevard (Shannon Parkway to Chippendale Avenue)
Opinion of Probable Cost
Item No.
Description
Quantity
Unit
1
Unit
Cost Total
1
8" DIP Class 52
2230
LF
$19.00 ! $42,37 y
2
6" DIP Class 52
150
LF
$17.00
$2,550.00
3
8" Gate Valve
3
EA
$600.00
$1,800.00
4
6" Gate Valve
6
EA
$450.00
$2,700.00
5
16" x 8" Wet Tap w/Tapping Valve
2
EA
$2,000.0
$4,000.00
6
' Hydrant
5
EA
$1,400.0
$7,000.00
7
Connect to Existing Watermain
2
EA
$500.00
$1,000.00
8
Ductile Iron Fittings
1750 1
LB
$1.50
$2,625.00
9
4" Polystyrene Insulation
20
SY
$20.00
$400.00
Subtotal
+10% Contingencies
Subtotal
+30 % Administrative
$64,445.00
$6,444.50
$70,889.50
$21,266.85
Grand Tot
$92,156.35
City of Rosemount — Feasibility Report
2000 Street and Utility Reconstruction Project
City Project No. 316
S.A.P. No. 208 - 112 -01
WSB Project No. 1210.00
WSB
AnimiiiiiL
& Amd .I=
t
2000 Street & Utility Reconstruction Project
Street & Utility Improvements and Appurtenant Work
City of Rosemount Project No. 316
S.A.P. 208-112-01
Schedule C - Watermain - Cimarron Avenue (Dodd Boulevard to 145 Street West)
Opinion of Probable Cost
Item No. Description _ _
Quantity
Unit
Unit Cost
Total
1
Remove 6" Watermain
700
LF
$7.00
$4,900.00 y
2
3
Remove Copper Service
Remove Hydrant
56
1
LF
EA
$2.00
$400.00
$112.00
$400.00
4
Remove Gate Valve
2
EA
$100.00
$200.00
5
Remove Curb Stop & Box
4
EA
$25.00
$100.00
6
7
1 8" DIP CL 52
8" Gate Valve
680
3
LF
EA
$19.00
$600.00
$12,920.00
$1,800.00
8
Connect to Existing Watermain
3
EA
$500.00
$1,500.00
9
Connect to Existing Service
4
EA
$250.004
$1,000.00
10
1" Corporation Stop
1
EA
$50.00
$50.00
11
2" Corporation Stop
3
EA
$100.00
$300.0
12
1" Curb Stop & Box
1
EA
$90.00
$90.00
13
2 "Curb Stop & Box
3
EA
$200.00
$600.00
14
1" T e K Copper
14
LF
$8.00
$1 12.00
15
2" Type K Copper
42
LF
$14.00
$588.00
16
Ductile Iron Fittings
400
LB
$1.50
$600.00
17
Temporary Water Service
1
LS
$5,000.00
$5,000.00
Subtotal
+10% Contingencies
Subtotal
+30% Administrative
$30,272.00
$3,027.20
$33,299.20
$9,989.76
Grand Tot
$43,288.96
City of Rosemount — Feasibility Report
2000 Street and Utility Reconstruction Project
City Project No. 316
S.A.P. No. 208 - 112 -01
WSB Project No. 1210.00
YY SB
2000 Street & Utility Reconstruction Project
Street & Utility Improvements and Appurtenant Work
City of Rosemount Project No. 316
S.A.P. 208 - 112 -01
Schedule C - Watermain - Dodd Boulevard (House No's 14785,14793,14800)
Opinion of Probable Cost
Item No.
Description
Quantity
Unit Unit Cost Total
1
8" DIP Class 52
360
LF
$19.00 $6,840.00
2
6" DIP Class 52
5
LF
$17.00
$85.00
3
Jack or Auger 16" Casing Pie
80
LF
$250.00
$20,000.00
4
6" Gate Valve
1
EA
$450.00
$450.00
5
Hydrant
I
EA
$1,400.00
$1,400.00
6
Connect to Existing Watermain
1
EA
$500.00
$500.00
7
8
Ductile Iron Fittings
1" Type K Copper
315
115
LB
LF
$1.50
$8.00
$472.50
$920.00
9
1" Corporation
3
EA
$50.00
$150.00
10
1" Curb Stop & Box
3
EA
$90.00
$270.00
11
Sawcut Bituminous Pavement
110
LF
$3.00
$33 0.00
12
Remove Bituminous Pavement
165
SY
$2.00
$330.00
13
Irregular Width Paving
80
SY
$20.00
$1,600.00
14
Bituminous Driveway Pavement
85
SY
$17.00
$1,445.00
15
Remove and Replace Rock Garden
1
LS
$500.00
$500.00
' F 16
Sodding w /4" Topsoil)
775
SY
$2.00
$1,550.00
Subtotal
+10% Contingencies
Subtotal
+30% Administrative
$36,842.50
$3,684.25 !
$40,526.75
$12,158.03
Grand Total 1 $52,684.7
City of Rosemount — Feasibility Report
2000 Street and Utility Reconstruction Project /,/,�
City Project No. 316 WSB
S.A.P. No. 208 - 112 -01 Aiiiiii-
WSB Project No. 1210.00 &Assm1wes. Im
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2000 Street & Utility Reconstruction Project
Street & Utility Improvements and Appurtenant Work
City of Rosemount Project No. 316
S.A.P. 208-112-01
Schedule C - Watermain - Dodd Boulevard (House No. 14888)
Opinion of Probable Cost
City of Rosemount — Feasibility Report
2000 Street and Utility Reconstruction Project
City Project No. 316
S.A.P. No. 208 - 112 -01
WSB Project No. 1210.00
W B
.........._._._.
sass «•fares, ice.
Unit
Item No.
Description
Quantity
Unit Cost
Total
1
1" Type K Copper
75
LF
$8.00
$600.00
2
1" Corporation
1
EA
$50.00
$50.00
3
1" Curb Stop & Box
1
EA
$90.00
$90.00
Subtotal
1 $740.00
+10% Contingencies
$74.00
Subtotal
$814.00
+30% Administrative
$244.20
Grand To tal
$1,058.20
City of Rosemount — Feasibility Report
2000 Street and Utility Reconstruction Project
City Project No. 316
S.A.P. No. 208 - 112 -01
WSB Project No. 1210.00
W B
.........._._._.
sass «•fares, ice.
' 2000 Street & Utility Reconstruction Project
Street & Utility Improvements and Appurtenant Work
City of Rosemount Project No. 316
S.A.P. 208-112-01
Schedule D - Storm Sewer - Dodd Boulevard (Shannon Parkway to Chippendale Avenue)
Opinion of Probable Cost
Item No. Description
Quantity
Unit
Unit Cost
Total
1 15" RC Pipe Apron w /Trash Guard
1
EA
$600.00
$600.00
2 18" RC Pipe Apron w /Trash Guard
1
EA
$700.00
$700.00
3 15" RC Pipe Sewer Des. 3006 CL V
1432
LF
$21.0
$30,072.00
4 _18" RC Pipe Sewer Des. 3006 CL III
1072
LF
$23.0
$24,656.
5 Const. Drainage Structure Des. 48 -4020
33.4
LF
$150.0
$ 5,010.00
6
Const. Drainage Structure Des. 60 -4020
15.6
LF
$200.0
$3,120.0
i
7
Const. Drainage Structure Des. 724020
8.2
LF
$275.09
$2,255.00
8
Const. Drainage Structure Des. Spec 1 2' x 3' CB
26
EA
$1,000.00
$26,000.00
9
Castin Assembl
12
EA
$300.00
$3,600.00
10
1 Connect to Existing Storm Sewer
2
EA
$500.00
$ 1,000.0 0
1 l
Random Rip Rap CL IV
15
CY
$60.0
$900.00
12
Geotextile Fabric Type IV
21
SY
$2.00
$42.00
Subtotal
$97,955.00
+10% Contingencies
$9,795.50
Subtotal I I,
$107,750.50
+30% Administrative
$32,325.15
Grand Total
$140,075.65
City of Rosemount — Feasibility Report
2000 Street and Utility Reconstruction Project
City Project No. 316 WSB
S.A.P. No. 208 - 112 -01 Aiwibilia
WSB Project No. 1210.00 &Au"Fxa, Inc.
2000 Street & Utility Reconstruction Project Opinion of Probable Cost
Street & Utility Improvements and Appurtenant Work
City of Rosemount Project No. 316
S.A.P. 208-112-01
Schedule D - Storm Sewer - Cimarron Avenue (Dodd Boulevard to 145 " Street West)
Item No. Description
Quantity
Unit
Unit Cost
Total
1 15" RC Pipe Sewer Des. 3006 CL V
48
LF
$21.0
$1,008.00
2
Const. Drainage Structure Des. 72 -4020
4.5
LF
$275.0
$1,237.50
3
Const. Drainage Structure Des. Spec. 1 (2'x T CB
4
EA
$1,000.001 $4,000.00
4
Connect to Existing Storm Sewer
3
EA
$500.001 $1,500.00
Subtotal $7,745.50
+10% Contingencies $774.55
Subtotal $8,520.05
+30% Administrative $2,556.02
Grand Total $11,076.07
City of Rosemount — Feasibility Report
2000 Street and Utility Reconstruction Project 1, A
City Project No. 316 WSB
S.A.P. No. 208 - 112 -01
WSB Project No. 1210.00 &'�" ° °""`�'"`
' 2000 Street & Utility Reconstruction Project
Street & Utility Improvements and Appurtenant Work
City of Rosemount Project No. 316
S.A.P. 208-112-01
u
Opinion of Probable Cost
Schedule E - Fire Station (Parking Lot Improvements) - Option 1
Item No.
Description
Quantity
Unit Unit Cost
Total
i
1
I Remove Curb & Gutter
440
LF
$2.0
$8 80.00
2
Remove Bituminous Pavement
510
SY
$2.00
$1,020.00 ,
3
Remove Sidewalk
50
SF
$0.80
$40.00,
4
Saw Cut Bituminous Pavement
425
LF
$3.00
$1,275.00
5
Relocate Sign
2
EA
$100.0
$200.0
fi
R elocate Light Poles (2)
1
LS
$2,000.0
$
7
Common Excavation
550
CY
$5.00
$2,750.00
8
Granular Bon ow (LV)
370
CY
$6.00
$2,220.00
9
Concrete Curb & Gutter
500
LF
$6.50
$3,250.00
10
Aggregate Base 100% Crushed 8"
360
TN
$8.09
$2,880.00
11
Bituminous Wearing Course 3"
150
TN
$24.0
$3,600.00
12
4" Concrete Walk
200
SF
$2.501
$500.00
13
4" Solid Line White - Epoxy
750
LF
$0.8
$600.00
14
Sodding w /4" topsoil)
470
SY
$2.0
$940.00
15
Landscaping
1
LS
$1,000.00
$1,000.00
16
Construct Drainage Structure Des. Spec 1
2
EA
$1,000.00
$2,000.00
17
15" RC Pipe Sewer Des. 3006 CL V
40
LF
$21.00
$840.00
18
19
Connect to Existing Storm Sewer
Transplant Tree
2 1
3
EA
EA
$500.00
$300.00
$1,0
$900.00
Subtotal
+10% Contingencies
Subtotal
+30% Administrative
$27,895.00
$2,789.50
$30,684.50
$9,205.35
Grand Total
$39,889.85
City of Rosemount — Feasibility Report
2000 Street and Utility Reconstruction Project A
City Project No. 316 WSB
S.A.P. No. 208 - 112 -01
WSB Project No. 1210.00 &.0sodawh.
F1
n
2000 Street & Utility Reconstruction Project
Street & Utility Improvements and Appurtenant Work
City of Rosemount Project No. 316
S.A.P. 208-112-01
Schedule E - Fire Station (Parking Lot Improvements) - Option 2
Opinion of Probable Cost
Item No.
Description Quantity Unit Unit Cost Total
1 Common Excavation 520 CY $5.0 $2,600.00
2 Granular Borrow V 370 CY $6.O0 $2,220.00
3 Concrete Curb & Gutter Design B -612 310 LF $6.50 $2,015.00
4 Aggregate Base 100% Crushed 8" 725 SY $0.00
5 Bituminous Wearing Course 3" 135 TN $24.00 $3,240 j
6 ! 4" Concrete Walk 1600 SF $2.50 $4,000.00
7 Sodding w /4" Topsoil) 335 SY $2.0 $670 .00
8 Landscaping 1 LS $1,000.00 $1,000.00
9 4" Solid Line White - Epoxy 600 LF $0.8 $480.00
Subtotal $16,225.00
+10% Contingencies $1,622.50
Subtotal $17,847.50
+30% Administrative $5,354.25
Grand Total $23,
City of Rosemount — Feasibility Report
2000 Street and Utility Reconstruction Project
City Project No. 316
S.A.P. No. 208 - 112 -01
WSB Project No. 1210.00
rY SB
AIMIM�
& emu. I=
City of Rosemount — Feasibility Report
2000 Street and Utility Reconstruction Project
City Project No. 316
S.A.P. No. 208 - 112 -01
WSB Project No. 1210.00
rY SB
AIMIM�
& emu. I=
Total Project Costs
Schedule A - Streets - Dodd Boulevard (Shannon Parkway to Chippendale Avenue) $628,449.25
Schedule A - Streets - Cimarron Avenue (Dodd Boulevard to 145` Street West) $95,945.85
Schedule B - Sanitary Sewer - Dodd Boulevard (West of Shannon Parkwav) 79.195
-
Schedule B - Sanitary Sewer - Cimmaron Avenue (Dodd Boulevard to 145' Street West)
I
$8,637.20
Schedule C - Watermain - Dodd Boulevard (Shannon Parkway to Chippendale Avenue)
$92,156.35
Schedule C - Watermain - Cimarron Avenue (Dodd Boulevard to 145' Street West)
$43,288.96
Schedule C - Watermain - Dodd Boulevard (House No's 14785, 14793, 14800)
$52,684.78
Schedule C - Watermain - Dodd Boulevard (House No. 14888)
$1,058.20
Schedule D - Storm Sewer - Dodd Boulevard (Shannon Parkway to Chippendale Avenue)
$140,075.65
Schedule D - Storm Sewer - Cimarron Avenue (Dodd Boulevard to 145' Street West)
$11,076.07
Schedules A - D
$1,133,096.26
Schedule E - Fire Station Parking Lot Improvements (Option 1)
$39,889.85
Total - Schedules A - E (Option 1)
$1,172,986.11
Schedule E - Fire Station Parking Lot Improvements (Option 2)
$23,201.75
Total - Schedules A - E (Option 2)
$1,156,298.01
City of Rosemount — Feasibility Report
2000 Street and Utility Reconstruction Project
City Project No. 316
S.A.P. No. 208 - 112 -01
WSB Project No. 1210.00
WSB
& Associates, lnc,
1
APPENDIX C
TRAFFIC COUNTS / PAVEMENT DESIGN
' City of Rosemount — Feasibility Report
2000 Street and Utility Reconstruction Project A /�
City Project No. 316 ' SB
S.A.P. No. 208 - 112 -01
WSB Project No. 1210.00
Page 29
1999 TRAFFIC COUNTS /`
* COUNTS TAKEN IN SEPTEMBER, 1999
ALL OTHERS TAKEN IN OCTOBER, 1999
- 2000 Street and Utility WSB Project No. 1210.00 Date: February 15, 2000
350 Westwood Lake Office
A 8441 Wayzata Boulevard — Reconstruction Project
WS B Minneapolis, MN 55426
512541 -4800 TRAFFIC COUNTS Figure Number
& Aesociules, lnc. FAX 541 -1700 11
INFRASTRUCTURE - ENGINEERS - PLANNERS Rosemount, Minnesota
i
I
Ij1-
I l,_
it' '-t
I
0 A00
800
* COUNTS TAKEN IN SEPTEMBER, 1999
ALL OTHERS TAKEN IN OCTOBER, 1999
- 2000 Street and Utility WSB Project No. 1210.00 Date: February 15, 2000
350 Westwood Lake Office
A 8441 Wayzata Boulevard — Reconstruction Project
WS B Minneapolis, MN 55426
512541 -4800 TRAFFIC COUNTS Figure Number
& Aesociules, lnc. FAX 541 -1700 11
INFRASTRUCTURE - ENGINEERS - PLANNERS Rosemount, Minnesota
i
I
Ij1-
I l,_
it' '-t
I
743,100
BITUNIINOUS PAVEMENT DESIGN
Dodd Boulevard Date:
4- Feb -00
C.P. 31
Rosemount. MN WSB Project No.:
1210.00
208 - 112 -01
Present Average Daily Traffic (ADT) :
1735
Annual Growth Factor (0 % -6 %) :
3.50%
Number of Lanes:
2
'
Design Years: 20 Design Year Projection Factor:
1.99
Time Growth Factor:
28.28
20 Year Projected ADT :
3452
'
"R" Value:
70
Bituminous Pavement Design Strength (7, 9, or 10 Ton) :
9
Design Lane AADT :
1726
PRESENT DAILY N18 CALCULATION:
Vehicle Metro Design Metro
Design Lane
Type % of ADT Distribution N18 Factor
Daily N18
'
1 83.50% 1441 0.0004
0.58
2 9.00% 155 0.007
1.09
3 1.60% 28 0.01
0.28
'
4 1.80% 31 0.25
7.77
5 0.50% 9 0.58
5.01
6 0.30% 5 0.39
2.02
7 0.40% 7 0.51
3.52
8 2.40% 41 1.13
46.81
9 * **
10 0.50% 9 0.57
4.92
11 2.40
Present Daily N18 :
71.99
'
gn (sigma N18) = 365 x (time growth factor) x (present daily N18) :
Granular Equivalent Required:
14.50
Granular Equivalence Calculation
G.E.
Granular
Inches Materia Factor
Equivalence
2 2341, 2361 Bituminous Wear 2.00
4.00
'
2331 Bituminous Wear 2.00
2331 Bituminous Binder 2.00
2 2331 Bituminous Base 2.00
4.00
'
8 Cl. 5, Cl. 6 Aggregate Base 1.00
8.00
Cl. 3, Cl. 4 Aggregate Base 0.75
Select Granular Material 0.50
'
Total G.E.
16.00
The Total G.E. Meets or Exceeds The Required G.E.
743,100
APPENDIX D
PRELIMINARY ASSESSMENT ROLL
City of Rosemount — Feasibility Report
2000 Street and Utility Reconstruction Project
City Project No. 316
S.A.P. No. 208 - 112 -01
WSB Project No. 1210.00
Page 30
W SB
& .9ssociares, lnc.
M M i M M M M M M M M M M M M M M M M
PID
34 -03010 -010-85
Fee Owner
Vernon R. Kelley
Total
Property Address Parcel Frontage
14515 Dodd Blvd ( 1 330.8
Street
Assessment
$11,578.00
Water Sewer Total
Assessment Assessment Assessment
$11,578.00
34 -03010 -010 -90
Markus N. Chouliaris & Athanasia
Braun
14537 Dodd Blvd
2
217.2
$7,602.00
$7,602.00
34- 17350-010 -01
Cimarron Village Townhouses Ltd
Ptnshp #
7900 International Drive, Sulti
210
3
927.4
$32,459.00
$32,459.00
34-03010- 016 -88
Noukune Bouthavong & Phouthone
Xayachack ##
14619 Dodd Blvd
4
313.3
$4,800.50
$4,800.50
34 -03010-010 -87
M. W. Johnson Const. Inc. #
14635 Dodd Blvd
5
316.1
$11,063.50
$11,063.50
34 -03010 -016 -86
Karl F. Hensiek
6
212.5
$7,43750
$7,437.50
34-03010 - 015-86
City of Rosemount
7
$0.00
NA
Wensmann 9th and 10th Additions ""
NA
8
$86,124.00
$86,124.00
34- 66600 -010 -01
City of Rosemount (Fire Station)
9
$0.00
34 16401 - 070 - 01
Kory M & Lynne E Halterman
14785 Crestview Ave.
10
$0.00
34- 16401 -080 -01
Virginia L Berg
3955 147th Street West
11
$0.00
34- 16401 -090-01
Thomas F & Patti J Jeffrey
3945147th Street West
12
$0.00
34- 16401 - 100 -01
Roger W & Helen T. Schmidt
3929147th Street West
13
$0.00
34 -16401 -110 -01
Robert K & Sun O Lake
3915147th Street West
14
$0,00
34- 16401 -120 -01
Orville & Jacqueline Sells
3901 147th Street West
15
$0,00
34- 16401 -130 -01
Scott A Rees
3885 147th Street West
16
$0.00
34- 16401 -140-01
Keith A & Sandra L Holm
3875 147th Street West
17
$0.00
34- 16403 -010 -01
Johnny E & Donna J Martinez
3855147th Street West
18
$0.00
34- 16403 -020 -01
Clifford D & Diana C Feiock
3835147th Street
19
$0.00
34- 16403 -030 -01
Steven L & Debra K Ferm
3815147th Street West
20
$0.00
34- 16403 -040 -01
William J & Teresa J Huebner
3795147th Street West
21
$0.00
34 -03010 -010 -75
34- 15209 -010 -01
--
� - 34 - - - 1 - 5 - 209 -010 -06
Hubert C Uitdenbo g erd
Karen A Danay
-- — -
14676 Dodd Blvd
T
22
23 i
24
- — I
$2,400.00
---- --J—j—
$2,400.00
$0.00
$0.00
1465 Cimarron Ave
Mark J & Gina D Petersen
3685146th Street West
M M M M M M M M M M M! M M M M i i M
i
Total
Street Water Sewer
Total
PID Fee Owner
Property Address
Parcel
Frontage
Assessment Assessment Assessment
Assessment
34- 15209 -010 -00 City of Rosemount (Kidder Park)
25
$0.00
1367145th Street
34- 15209 -040-05
Dakota County HRA
2496145th Street West
26
$0.00
34- 15209 -050 -04
Byron Zeeveld & Nailah H Azzam-
14566 Chrome Ave
27
$0.00
Zeeveld
34 -03010 -030 -95
Fred Uitdenbogero
14540 Dodd Blvd
28
29
166.9
$2,400.00
$2,662.80
$2,400.00
$2,662.80
34 -03010-010 -52
Katrina Walter & Kenneth Walter
14785 Dodd Blvd
34- 03010 -030 -52
Janet R. Oster
14793 Dodd Blvd
30
104.0
$1,908.00
$1,908.00
34 -03010- 050 -52
Patricia J Anderson
14875 Dodd Blvd
31
221.8
$4,641.50
$4,641.50
34-03010 - 100 -52
Jeff G Lacy & Mary A Wolfe
14885 Dodd Blvd
32
92.8
$2,384.00
$2,384.00
34 -03010 -020 -54
Wesley & Diane Rolling
14930 Dodd Blvd
33
140.6
$3,220.50
$3,220.50
34- 03010 -040 -52
Christopher Ostertag
14888 Dodd Blvd
34
343.2
$4,778.40
$6,766.00
$11,544.40
34 -03010 -020 -52
Thomas & Sharon Piekarski
14800 Dodd Blvd
35
186.4
$2,896.80
$2,896.80
Total $165,864.50 $12,246.00 $17,012.00 $195,122.50
*Street Assessments for high- density residential and Commercial property are based on one -half of the cost of a 28'- street, or $35 /front foot
* *Water assessments are based on $12 /front foot plus the cost of the service line
** *Sewer assessments are based on $17.50 /front foot plus the cost of the service
* ** *Assessments for Wensmann 9th and 10th Additions were collected at the time of development. No new assessments are proposed as part of the reconstruction project.
# Includes street frontage on both Dodd Boulevard and Cimmaron Avenue
## This property,is zoned for multi - family residential. However, considering the size of the parcel (= 15,000 SF) and the adjacent development, it is unlikely that anything more than a
town home could b d This assessmen p is for 2 residential u