Loading...
HomeMy WebLinkAbout5.a PCExSum Harmony Villas Major PUD Amdend 20170228EXECUTIVE SUMMARY Planning Commission Meeting: February 28, 2017 Tentative City Council Meeting: March 21, 2017 AGENDA ITEM: Case 17-11-PUD and 17-12-FP: Mark Elliot Homes Major Amendment to the Harmony PUD and Simple Plat for Harmony Villas AGENDA SECTION: Public Hearing PREPARED BY: Kyle Klatt, Senior Planner AGENDA NO. 5.a ATTACHMENTS: Location Map, Project Description, Home Design and Features, Harmony Villas Final Plat, Final PUD Plans: Plat, Existing Conditions, Site Plan, Grading Plan, Stormwater Plan, Utility Plan, Landscape Plan, Architectural Drawings (Twin and Quad Designs), City Engineer Review APPROVED BY: K.L. RECOMMENDED ACTION: Staff recommends the Planning Commission make the following motions: 1) Motion to recommend approval of a Major Amendment to the Harmony PUD to permit 42 attached townhouse units in place of 79 Villas and Row Townhomes within Outlot G of Harmony Addition subject to the following conditions: a. Compliance with the conditions and standards within the City Engineer’s Memorandum dated February 23, 2017. b. Final building plans shall include a minimum of three and a half (3.5) feet of brick or stone wainscoting on the front façade and any columns in front of the house, and side and rear elevations facing public right of way. 2) Motion to recommend approval of the Simple Plat application for Harmony Villas subject to the following conditions: a. Dedication of standard drainage and utility easements. b. Compliance with the conditions and standards within the City Engineer’s Memorandum dated February 23, 2017. c. Approval and execution of a subdivision agreement. d. Renaming of Lot 43 to an outlot. SUMMARY The Planning Commission is being asked to consider a request for a Major Amendment to the Harmony Planned Unit Development (PUD) and Simple Plat for Harmony Villas to revise the approved development plan for Outlot G of Harmony Addition. The proposed amendment would replace 79 Villa and Row Townhomes with 42 attached townhouse units contained in quad or two- unit residential structures for a net reduction of 37 units in this portion of the development. 2 No changes to adjacent public streets or public utilities are planned, and the proposed development will be located entirely with the existing outlot boundaries. The requested amendment is considered a major amendment because it results in a decrease of more than 5% of the original density for the area. Applicant & Property Owner(s): Mark Elliot Homes (under contract with current land owner Metro Land Holdings, LLC) Location: Outlot G, Harmony Addition – North of Connemara Trail, South of Bronze Parkway and East of Brockway Avenue Area in Acres: 7.42 Acres Comp. Guide Plan Desig: MDR – Medium Density Residential Current Zoning: R-3 – Medium Density Residential/PUD BACKGROUND Mark Elliot Homes has entered into an agreement to purchase Outlot G of Harmony Addition from the current property owner with the intent of constructing 42 townhouse dwelling units on this property. The preliminary plans for this lot were approved as part of the initial development area for the Brockway/Harmony PUD, which included a mix of single family, townhouse, and multi-family residential units, two larger city park areas, a community center, and small area of neighborhood commercial. The site under consideration, and Outlot F immediately to the north, are the only two building sites that have not yet received final plan approval within Harmony. The overall PUD for Harmony has been amended several times since it was originally approved in 2004. These amendments have reduced the overall density of the project, which initially included 624 housing units and now stands at 503 units taking into account recent amendments. The most significant change to the PUD has been the removal of 180 multi-family units from the middle portion of the development, and the conversion of these areas to 6-12 unit townhouses. The previously approved plan for Outlot G includes a mix of two-story villa townhomes and row townhomes with 3 to 10 units in each building, depending upon building style. The public improvements around the site were installed with previous Harmony additions, and the property is surrounded by three public roads and a City Park (disc golf course) to the west. The site was rough graded with earlier projects in accordance with the preliminary layout of villa and row townhomes. No access was planned from any of the surrounding roadways except for Bronze Parkway due to the parkway design of Brockway Ave and Connemara Trail. Staff is not aware of any existing planning and zoning issues with the present site, and there are presently no restrictions in place that would prevent development of the property from occurring. Mark Elliot Homes is proposing to develop the site for townhouses, and the site plan depicts quad units within the interior of the site and side-by-side units along the eastern and western property boundary. The quad units are very similar to the “garden townhomes” previously approved and built within the development. These units are one story in height with slab-on-grade construction and each home on a separate parcel. The overall architectural design of the quad-unit townhomes is similar to that of applicant’s townhouses within the Glenrose subdivision near the project site. At present, there are no two-unit townhomes within Harmony, and the applicant’s design for these particular units is intended to match the four-unit structures in appearance. 3 A major amendment to a PUD requires a public hearing and a recommendation from the Planning Commission. The applicant has submitted updated grading, utility, landscaping, and other site development plans to address the site layout changes, and these plans have been reviewed and approved by the City Engineer with conditions. In general, the replat does not require any significant revisions to public existing infrastructure; however, sewer and water will need to be brought into the site to serve each of the individual units. The Developer has submitted information (including sketches of the updated building designs) concerning the minor PUD changes, and these have been attached for consideration by the Planning Commission. Staff has found that the proposed one-level designs are generally consistent with the approved plans for the Harmony PUD, but is recommending that the final building plans be further reviewed for consistency with the materials, colors, and architectural detailing of the approved building designs through the PUD area. The applicant has indicated that a similar style of housing within the Glenrose development in Rosemount is selling very well, and he believes that the proposed site is an excellent location for this particular type of housing. The City has seen a movement away from the back-to-back multi-unit structures within Harmony, which is apparent from recent amendments brought forward by developers. Legal Authority. A simple plat (combined preliminary and final plat) request is a quasi-judicial decision for the City Council. Meaning that the City Council is acting as a judge to determine if the regulations within the Comprehensive Plan, Zoning Ordinance, and Subdivision Ordinance are being followed. The Major Amendment to the Planned Unit Development Master Development Plan is a legislative decision because of potential Code deviations being requested. Legislative decisions give the City Council more latitude, but consideration should be given to the PUD standards of the existing 2004 Brockway Area (Harmony) PUD agreement. ISSUE ANALYSIS Unit Mix/Design. The proposed site plan includes 6 four-unit buildings with 9 two-unit structures for a total unit count of 42. In contrast, the 2004 Harmony PUD plans call for a series of six back-to- back buildings with 8-10 units in each, along with single-depth row townhouses along the site perimeter for a total unit county of 79. The proposed amendment will reduce the density within Outlot G by nearly half; however, the overall arrangement of buildings follows the preliminary plans very closely, and in particular, the general north/south alignment of homes perpendicular to Connemara Trail and Bronze Parkway. Comparing the previously approved architectural plans within Harmony to the designs proposed by the applicant, staff would like to point out the following general observations:  The overall PUD plans for the Harmony stress pedestrian connectivity throughout the neighborhood. The applicant’s proposed design does not alter the orientation of any buildings to the street, and the overall site layout includes a sidewalk along the primary access roads internal to the development. Sidewalks are presently located within the Brockway Ave, Bronze Parkway, and Connemara Trail right-of-way along the exterior of three sides of the applicant’s site. 4  The building designs approved through the Harmony PUD require brick or stone wainscoting on the ends of buildings wrapping onto the front of each unit and a brick base on the columns in front of the garages. In previous approvals brick or stone wainscoting was required along public views. Therefore, additional detailing on the sides of the quads facing the right-of-way and the 2-unit row houses should be provided addressing this concern. The applicant’s preliminary architectural drawings only illustrate front elevations and therefore compliance with the anticipated condition is unclear.  The overall architectural design of the townhomes should fit in very well with the existing homes within Harmony. The proposed plans include a covered front entry/stoop area along with garages that are recessed from the main building elevation. While the side-by-side units do not show a recessed garage, they include nearly all of the other architectural treatments of the quad units. Density/Comprehensive Plan. The subject parcel, Outlot G of Harmony Addition, is guided for medium density residential development under the comprehensive plan and is zoned R-3 PUD Medium Density Residential Planned Unit Development. With the changes to the density within the Harmony PUD approved last year (Harmony 7th Addition being the most recent) the overall number of approved units stands at 498 dwelling units. With an overall project area of 91.38 acres, the approved density is 5.5 units per acre. The applicant’s proposed changes would reduce the number of units to 461, which results in an updated density of 5.04 units per acre. The proposed amendments would keep the project within the density range of 5-10 units per acre as specified in the Comprehensive Plan, but would bring this number very close to the low end of the range. Parking and Access. All streets internal to the development will be private, with two entrances off of Bronze Parkway. One of these entrances will line up with the future access to Outlot F north of the applicant’s site, while the other will be located further to the west along Bronze Parkway. The streets primarily used for circulation are designed to meet the City’s specification for public roadways at 28 feet in width, while the streets only providing access to individual units are somewhat narrower at 22 feet. The proposed street layout matches the preliminary PUD plans and will provide for adequate maneuvering space for service vehicles, residents and visitors to this neighborhood. The City’s single-family attached parking standards, which are mirrored in the overall Harmony PUD agreement, require 2.5 parking stalls per unit. The proposed plans include two garage spaces within each unit along with 21 additional surface stalls at various locations throughout the development. Consistent with the City’s expectations for units along private streets, the site layout provides a minimum of 20 feet between the front face of the garage and the curb line of the street. This garage setback from the street will provide room for all but the largest vehicles to park in the driveway without blocking the street. Landscaping. The applicant has submitted a landscape plan that demonstrates compliance with City’s landscape ordinance: one overstory tree per dwelling unit, one street tree for every 50 feet of road frontage (trees have already been installed in Brockway Ave) and one foundation planting for every 10 linear feet of structure. The proposed plan either meets or exceeds all of these requirements. 5 Storm Water. The overall plans for Harmony include a regional ponding system that was installed with earlier grading and development projects on the site. All storm water runoff from the applicant’s site is being directed into one of these regional basins, so no additional on-site retention is necessary. The development plans include a storm water plan and model that has been reviewed by the City Engineer for consistency with the Harmony plans and City’s current storm water ordinances. Utilities. Although the streets internal to the development will be private, the sanitary sewer and water lines servicing each of the individual homes will be public. The developer is proposing to dedicate drainage and utility easements over all private roads to provide the City with the required access it needs to maintain these lines. Staff is recommending a condition of approval that will require the developer to enter into an agreement with the City concerning the installation of all public infrastructure. Park Dedication. The park dedication requirements have been paid or been achieved through land dedication. There are no new Park fees created by the request. Simple Plat. The Subdivision Ordinance allows residential plats less than 10 acres in size to follow a simple platting procedure that combines the review for preliminary and final plat into one action. The Harmony Villas plat meets this requirement, and the proposed final plat will be contained entirely within the existing Outlot G, which means there will be no additional right-of-way or other public dedications necessary. Please note that staff is requesting that Lot 43 be renamed as an outlot since this parcel includes all roadway and common open space areas and will therefore be unbuildable. CONCLUSION & RECOMMENDATION Staff recommends approval of a Major Amendment to the Harmony Planned Unit Development (PUD) and Simple Plat for Harmony Villas to revise the approved plan for Outlot G of Harmony Addition. This recommendation for approval is based on the information submitted by the applicant and the findings made in this report and is subject to the conditions listed in the recommended action. HARMONY VILLAS Property Information Febru ary 14, 2017 0 450 900225 ft 0 130 26065 m 1:4,800 Disclaimer: Map and parcel data are believed to be accurate, but accuracy is not guaranteed. This is not a legal document and should not be substituted for a title search,appraisal, survey, or for zoning verification. LOUCKS Know all persons by these presents: That Mark Elliot Homes, LLC, a Minnesota limited liability company, owner of the following described property situated in the County of Dakota, State of Minnesota, to wit: Outlot G, HARMONY ADDITION, Dakota County, Minnesota. Has caused the same to be surveyed and platted as HARMONY VILLAS and does hereby dedicate to the public for public use the drainage and utility easements as created by this plat. In witness whereof said Mark Elliot Homes, LLC, a Minnesota limited liability company, has caused these presents to be signed by its proper officer this ______ day of __________________, 20____. MARK ELLIOT HOMES, LLC Signed: _______________________________________________ By: _______________________________________________, as _________________________ STATE OF MINNESOTA COUNTY OF _________________________ The foregoing instrument was acknowledged before me on this ______ day of __________________, 20____, by _____________________________________, as _________________________, of Mark Elliot Homes, LLC, a Minnesota limited liability company, on behalf of the company. _______________________________________________________________________________________ Notary Public, ____________________ County, Minnesota Notary Printed Name My Commission Expires January 31, 20____ I, Max L. Stanislowski, do hereby certify that this plat was prepared by me or under my direct supervision; that I am a duly Licensed Land Surveyor in the State of Minnesota; that this plat is a correct representation of the boundary survey; that all mathematical data and labels are correctly designated on this plat; that all monuments depicted on this plat have been, or will be correctly set within one year; that all water boundaries and wet lands, as defined in Minnesota Statutes, Section 505.01, Subd. 3, existing as of the date of this certificate are shown and labeled on this Plat; and all public ways are shown and labeled on this plat. Dated this ______ day of __________________, 20____. _______________________________________________ Max L. Stanislowski, Licensed Land Surveyor, Minnesota License No. 48988 STATE OF MINNESOTA COUNTY OF ____________________ The foregoing instrument was acknowledged before me on this ______ day of __________________, 20____, by Max L. Stanislowski, a Licensed Land Surveyor. _______________________________________________________________________________________ Notary Public, ____________________ County, Minnesota Notary Printed Name My Commission Expires _________________________ ROSEMOUNT, MINNESOTA Approved by the Planning Commission of the City of Rosemount, Minnesota this ______ day of __________________, 20____. By _____________________________________, Chair By _____________________________________, Secretary This plat was approved by the City Council of the City of Rosemount, Minnesota, this ______ day of __________________, 20____, and hereby certifies compliance with all requirements as set forth in Minnesota Statutes, Section 505.03, Subd. 2. By _____________________________________, Mayor By _____________________________________, Clerk COUNTY SURVEYOR, Dakota County, Minnesota I hereby certify that in accordance with Minnesota Statutes, Section 505.021, Subd. 11, this plat has been reviewed and approved this ______ day of __________________, 20____. By _____________________________________, Dakota County Surveyor Todd B. Tollefson DEPARTMENT OF PROPERTY TAXATION AND RECORDS, Dakota County, Minnesota Pursuant to Minnesota Statutes, Section 505.021, Subd. 9, taxes payable in the year 20___ on the land hereinbefore described have been paid. Also, pursuant to Minnesota Statutes, Section 272.12, there are no delinquent taxes and transfer has been entered on this ______ day of __________________, 20____. By _____________________________________, Department of Property Taxation and Records By _____________________________________, Deputy COUNTY RECORDER, County of Dakota, State of Minnesota I hereby certify that this plat of HARMONY VILLAS, was filed in the Office of the County Recorder for public record on this ______ day of __________________, 20____, at ______ o'clock ____ .M. and was duly filed in Book ____________ of Plats, Page ______, as Document Number ________________________. By _____________________________________, County Recorder By _____________________________________, Deputy VICINITY MAP S.E.1/4N.E.1/4S.W.1/4 N.W.1/4 N N SCALE IN FEET 0 40 SITE LOUCKSW:\2016\16430\CADD DATA\SURVEY\S16430-MASTERPlotted: 01 /30 / 2017 10:38 AM 7200 Hemlock Lane, Suite 300Maple Grove, MN 55369763.424.5505www.loucksinc.comPLANNINGCIVIL ENGINEERINGLAND SURVEYINGLANDSCAPE ARCHITECTUREENVIRONMENTALSUBMITTAL/REVISIONSPROFESSIONAL SIGNATUREQUALITY CONTROLCADD files prepared by the Consultant for this project areinstruments of the Consultant professional services for use solelywith respect to this project. These CADD files shall not be usedon other projects, for additions to this project, or for completionof this project by others without written approval by theConsultant. With the Consultant's approval, others may bepermitted to obtain copies of the CADD drawing files forinformation and reference only. All intentional or unintentionalrevisions, additions, or deletions to these CADD files shall bemade at the full risk of that party making such revisions, additionsor deletions and that party shall hold harmless and indemnify theConsultant from any & all responsibilities, claims, and liabilities.CADD QUALIFICATIONHARMONYVILLASROSEMOUNT, MINNESOTAMARK ELLIOT HOMESMARK PASVOGEL7741 147th STREET W.APPLE VALLEY, MN 5312401/10/17Preliminary Plat SubmittalC1-1PRELIMINARY PLATC2-1C3-1C3-2C3-3C4-1C8-1C8-2SITE PLANGRADING PLANSWPPP PLANSWPPP NOTESUTILITY PLANDETAILSDETAILSL1-1LANDSCAPE / TREEPRESERVATION PLANL2-1LANDSCAPE DETAILSC1-2ALTA / EXISTING CONDITIONSPUDAMENDMENT /PRELIMINARYPLATC1-1License No.Date I hereby certify that this survey, plan or report wasprepared by me or under my direct supervision and thatI am a duly Licensed Land Surveyor under the laws ofthe State of Minnesota.Field CrewMax L. Stanislowski - PLS48988Project LeadDrawn ByChecked ByLoucks Project No.SHEET INDEX16430HDNKMMMLSDJP01/09/17SCALE IN FEET03060NPRELIMINARY PLAT GENERAL NOTESSURVEYOR:OWNER/DEVELOPER:Loucks Associates, Inc.Mark Elliot Homes7200 Hemlock Lane, Suite 3007741 147 Street WestMaple Grove, MN 55330Apple Valley, MN 55124763-424-5505952-392-9227LEGAL DESCRIPTION:Outlot G, HARMONY ADDITION, Dakota County, Minnesota.DATE OF PREPARATION:January 9, 2017EXISTING ZONING:Zone R-3 (Medium Density Residential) PUDPROPOSED ZONING:Zone PUDAREA:Total Property Area = 323,222 +/- Sq.Ft. or 7.42 +/- AcresLots 1-8 and 21-30 = 2,352+/- Sq.Ft. or 0.05 +/- AcresLots 9-19 and 31-42 = 3,330 +/- Sq.Ft. or 0.08 +/- AcresLot 43 = 200,968 +/- Sq.Ft. or 4.61 +/- AcresPROPOSED BUILDING SETBACKS:Front = 20 FeetSide= 20 FeetRear= 30 FeetFLOOD ZONE DESIGNATION:This property is contained in Flood Insurance Rate Map, Community PanelNo. 27037C0115E, and is a non-printed panel (no special flood hazard areas). LOUCKSW:\2016\16430\CADD DATA\SURVEY\S16430-MASTERPlotted: 01 /10 / 2017 9:30 AM 7200 Hemlock Lane, Suite 300Maple Grove, MN 55369763.424.5505www.loucksinc.comPLANNINGCIVIL ENGINEERINGLAND SURVEYINGLANDSCAPE ARCHITECTUREENVIRONMENTALSUBMITTAL/REVISIONSPROFESSIONAL SIGNATUREQUALITY CONTROLCADD files prepared by the Consultant for this project areinstruments of the Consultant professional services for use solelywith respect to this project. These CADD files shall not be usedon other projects, for additions to this project, or for completionof this project by others without written approval by theConsultant. With the Consultant's approval, others may bepermitted to obtain copies of the CADD drawing files forinformation and reference only. All intentional or unintentionalrevisions, additions, or deletions to these CADD files shall bemade at the full risk of that party making such revisions, additionsor deletions and that party shall hold harmless and indemnify theConsultant from any & all responsibilities, claims, and liabilities.CADD QUALIFICATIONHARMONYVILLASROSEMOUNT, MINNESOTAMARK ELLIOT HOMESMARK PASVOGEL7741 147th STREET W.APPLE VALLEY, MN 5312401/10/17Preliminary Plat SubmittalC1-1PRELIMINARY PLATC2-1C3-1C3-2C3-3C4-1C8-1C8-2SITE PLANGRADING PLANSWPPP PLANSWPPP NOTESUTILITY PLANDETAILSDETAILSL1-1LANDSCAPE / TREEPRESERVATION PLANL2-1LANDSCAPE DETAILSC1-2ALTA / EXISTING CONDITIONSLicense No.Date I hereby certify that this survey, plan or report wasprepared by me or under my direct supervision and thatI am a duly Licensed Land Surveyor under the laws ofthe State of Minnesota.VICINITY MAPField CrewMax L. Stanislowski - PLS48988Project LeadDrawn ByChecked ByLoucks Project No.16430MLSBJYLicense No.Date I hereby certify that this survey, plan or report wasprepared by me or under my direct supervision and thatI am a duly Licensed Land Surveyor under the laws ofthe State of Minnesota.Field CrewMax L. Stanislowski - PLS48988Project LeadDrawn ByChecked ByLoucks Project No.SHEET INDEXMLSDJP01/09/17SCALE IN FEET04080SURVEY LEGENDSPOT ELEVATIONGATE VALVESIGNLIGHT POLESANITARY MANHOLEHYDRANTSTORM MANHOLECATCH BASINCONTOURCONCRETE CURBSTORM SEWERSANITARY SEWERWATERMAINUNDERGROUND ELECTRICCONCRETEELECTRIC TRANSFORMERELECTRIC MANHOLEHAND HOLEUNDERGROUND GASYARD LIGHTMISC FRUITMAPLEASFRMACONIFEROUS TREEDECIDUOUS TREEASHDESCRIPTION OF PROPERTY SURVEYED(Per Schedule A of the herein referenced Title Commitment)Outlot G, HARMONY ADDITION, Dakota County, Minnesota.Abstract PropertyTITLE COMMITMENT EXCEPTIONS(Per Schedule B, Part II of the herein referenced Title Commitment)The property depicted on this survey and the easements of record shown hereon are the same as the property and theeasements described in the Commitment for Title Insurance issued by Stewart Title Guaranty Company, Issued by its Agent,Land Title, Inc., File No. 545836, dated October 3, 2016. The numbers below correspond to those in the title commitment.1-11, 13-16 and 18 do not require comment.12. Temporary Private Ingress and Egress Easement Agreement dated July 28, 2004, filed August 17, 2004 as DocumentNumber 2238482. Easement has terminated with its dedication as a public roadway, Brockway Avenue in the plat ofHARMONY ADDITON. Not shown hereon.17. Drainage and utility easements over the subject property as shown on the recorded plat. There are no platted drainageand utility easements over subject property. Not shown hereon.ALTA/NSPS OPTIONAL TABLE A NOTES(The following items refer to Table A optional survey responsibilities and specifications)1.Monuments placed (or a reference monument or witness to the corner) at all major corners of the boundary of theproperty, unless already marked or referenced by existing monuments or witnesses to the corner are shown hereon.2.The address, if disclosed in documents provided to or obtained by the surveyor, or observed while conducting thefieldwork is Unassigned.3. This property is contained in Flood Insurance Rate Map, Community Panel No. 27037C0115E, and is a non-printed panel(no special flood hazard areas).4. The Gross land area is 323,222 +/- square feet or 7.42 +/- acres.6. (a) We were not provided zoning information by the client.7. (a) There are no observable buildings on this site.8. Substantial features observed in the process of conducting fieldwork, are shown hereon.9. There are no striped parking stalls on this site11. We have shown underground utilities on and/or serving the surveyed property per Gopher State One-Call Ticket No.163160196. The following utilities and municipalities were notified:CITY OF ROSEMOUNT(651)322-2022DAKOTA ELECTRIC(651)463-6268GIGABIT MINNESOTA(763)222-1099FRONTIER COMMUNICATIONS(800)778-9140INDEPENDENT SCHOOL 196(320)963-2400KOCH PIPELINE CO LP(800)688-7594WINDSTREAM COMMUNICATIONS (800)289-1901MINNESOTA ENERGY RESOURCES(800)778-9140MEDIACOM(800)778-9140DEPARTMENT OF TRANSPORTATION(651)366-5750CHARTER COMMUNICATIONS(800)778-9140MAGELLAN MIDSTREAM PARTNERS(918)574-7098XCEL ENERGY(651)229-2427i. Utility operators do not consistently respond to locate requests through the Gopher State One Call service forsurveying purposes such as this. Those utility operators that do respond, often will not locate utilities from their mainline to the customer's structure or facility. They consider those utilities “private” installations that are outside theirjurisdiction. These “private” utilities on the surveyed property or adjoining properties, may not be located since mostoperators will not mark such "private" utilities. A private utility locator may be contacted to investigate these utilitiesfurther, if requested by the client.ii. The locations of underground utility lines shown hereon is an approximation based on available maps, unless otherwisenoted on the survey.iii. Maps provided by those notified above, either along with a field location or in lieu of such a location, are very ofteninaccurate or inconclusive. EXTREME CAUTION MUST BE EXERCISED BEFORE AN EXCAVATION TAKES PLACE ONOR NEAR THIS SITE. BEFORE DIGGING, YOU ARE REQUIRED BY LAW TO NOTIFY GOPHER STATE ONE CALL ATLEAST 48 HOURS IN ADVANCE AT 811 or (651) 454-0002.SURVEY REPORT1. The Surveyor was not provided utility easement documents for the subject property except for those shown on the Survey.2. The bearings for this survey are based on the plat of HARMONY ADDITION.3. Benchmark: MnDOT 6 RDS. In Rosemount, 1.8 miles north along Trunk Highway from junction of Trunk Highway 3 andCounty Road 42 in Rosemount, at Trunk Highway 3 milepoint 34.3, 205 feet west of Trunk Highway 3, 24 feet north ofCounty Road 38 (132nd Street West), 105 feet east of Entrance to 2925, 41 feet east of stop ahead sign, 0.9 foot east ofWitness Post. Elevation = 978.27 (NGVD 29) Site Benchmark: Top Nut Hydrant, north side of Connemara trail W., 342 feet ± west of Brockway Avenue. Elevation =954.64 (NGVD 29)4. Utility lines run throughout the property without an easement provided to the surveyor.5. Sidewalk falls on the property along the north line.CERTIFICATIONTo Mark Elliot Homes LLC, a Minnesota limited liability company, Metro Land Holdings, LLC, a Minnesota limited liabilitycompany, Land Title Inc. and Stewart Title Guaranty Company:This is to certify that this map or plat and the survey on which it is based were made in accordance with the 2016 MinimumStandard Detail Requirements for ALTA/NSPS Land Title Surveys, jointly established and adopted by ALTA and NSPS, andincludes Items 1 - 4, 6(a), 7(a), 8, 9 and 11 of Table A thereof. The field work was completed on 11/28/16.Date of Plat or Map: January 9, 2017______________________________________________Max L. Stanislowski, LS Minnesota License No. 48988mstanislowski@loucksinc.comNFLARED END SECTIONTOP OF CURBTCSET 1/2 INCH X 14 INCH IRONMONUMENT, MARKED "LS 48988"DRILLHOLEALTA/NSPS LANDTITLE /EXISTINGCONDITIONSSURVEYC1-2 LOUCKS W:\2016\16430\CADD DATA\CIVIL\_dwg Sheet Files\C16430 C2-1 Site PlanPlotted: 01 /30 / 2017 11:0 AM7200 Hemlock Lane, Suite 300 Maple Grove, MN 55369 763.424.5505 www.loucksinc.com PLANNING CIVIL ENGINEERING LAND SURVEYING LANDSCAPE ARCHITECTURE ENVIRONMENTAL SUBMITTAL/REVISIONS PROFESSIONAL SIGNATURE QUALITY CONTROL CADD files prepared by the Consultant for this project are instruments of the Consultant professional services for use solely with respect to this project. These CADD files shall not be used on other projects, for additions to this project, or for completion of this project by others without written approval by the Consultant. With the Consultant's approval, others may be permitted to obtain copies of the CADD drawing files for information and reference only. All intentional or unintentional revisions, additions, or deletions to these CADD files shall be made at the full risk of that party making such revisions, additions or deletions and that party shall hold harmless and indemnify the Consultant from any & all responsibilities, claims, and liabilities. CADD QUALIFICATION HARMONY VILLAS ROSEMOUNT, MINNESOTA MARK ELLIOT HOMES MARK PASVOGEL 7741 147th STREET W. APPLE VALLEY, MN 53124 01/10/17 Preliminary Plat Submittal PRELI MI N A R Y C1-1 PRELIMINARY PLAT C2-1 C3-1 C3-2 C3-3 C4-1 C8-1 C8-2 SITE PLAN GRADING PLAN SWPPP PLAN SWPPP NOTES UTILITY PLAN DETAILS DETAILS L1-1 LANDSCAPE / TREE PRESERVATION PLAN L2-1 LANDSCAPE DETAILS Review Date SHEET INDEX License No. Date I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota. Todd W. McLouth - PE 20383 Project Lead Drawn By Checked By Loucks Project No.16430 TWM GAJ TWM 01/10/17 C1-2 ALTA / EXISTING CONDITIONS N SITE PLAN C2-1 EXISTING ZONING: PUD - R-3 (MEDIUM DENSITY RESIDENTIAL) PROPOSED ZONING: PUD AMENDMENT TO PUD - R-3 MATCH EXISTING WALK MATCH EXISTING WALK MATCH EXISTING BITUMINOUS AND CURBMATCH EXISTING BITUMINOUS AND CURB PEDESTRIAN RAMP (TYP)B6-12 CURB &GUTTER (TYP)5' CONCRETE WALK R15' R15' R15' R15' R15' R15' R15' R15' R15' R15' R15' R15' CURB CUT CURB CUT CURB CUT TRANSITION TO B6-12 (TYP) SURMOUNTABLE CURB & GUTTER (TYP) CONCRETE CROSS GUTTER PEDESTRIAN RAMP (TYP) R5' (TYP) 18.00' 22.00' 22.00' 22.00' 22.00' 22.00' 22.00' 28.00' 28.00'28.00'20.00' 20.00'30.00'20.00'1 2 3 4 5 6 7 8 39 42 40 41 35 38 36 37 31 34 32 33 19 18 20 17 15 14 16 13 11 10 12 9 30 29 28 27 26 25 24 23 22 21 SURMOUNTABLE CURB & GUTTER (TYP) R5' (TYP) 18' TYP 9'TYPOUTLOT G, HARMONY ADDITION, DAKOTA COUNTY, MN LOTS 1-8, 21-30 42,336 SF, 0.97 AC. LOTS 9-19, 31-42 79,920 SF, 1.84 AC. TOTAL UNITS 42 PLAT AREA 7.42 AC. SITE DENSITY 5.66 UNITS / AC. OPEN / GREEN SPACE 3.21 AC. (42.3%) PARKING STALLS REQUIRED - 0.5 / UNIT 21 STALLS PARKING STALLS PROPOSED 21 STALLS PROPERTY BOUNDARYPROPERTY BOUNDARYPROPERT Y B O U N D A R Y PROPERTY BOUNDARYF-F F-F F-F F-F F-F F-F F-F F-F F-F43 43 43 43 (DRAINAGE & UTILITY EASEMENT OVER ALL OF LOT 43) LOUCKS W:\2016\16430\CADD DATA\CIVIL\_dwg Sheet Files\C16430 C3-1 Grading PlanPlotted: 01 /30 / 2017 11:1 AM7200 Hemlock Lane, Suite 300 Maple Grove, MN 55369 763.424.5505 www.loucksinc.com PLANNING CIVIL ENGINEERING LAND SURVEYING LANDSCAPE ARCHITECTURE ENVIRONMENTAL SUBMITTAL/REVISIONS PROFESSIONAL SIGNATURE QUALITY CONTROL CADD files prepared by the Consultant for this project are instruments of the Consultant professional services for use solely with respect to this project. These CADD files shall not be used on other projects, for additions to this project, or for completion of this project by others without written approval by the Consultant. With the Consultant's approval, others may be permitted to obtain copies of the CADD drawing files for information and reference only. All intentional or unintentional revisions, additions, or deletions to these CADD files shall be made at the full risk of that party making such revisions, additions or deletions and that party shall hold harmless and indemnify the Consultant from any & all responsibilities, claims, and liabilities. CADD QUALIFICATION HARMONY VILLAS ROSEMOUNT, MINNESOTA MARK ELLIOT HOMES MARK PASVOGEL 7741 147th STREET W. APPLE VALLEY, MN 53124 01/10/17 Preliminary Plat Submittal PRELI MI N A R Y C1-1 PRELIMINARY PLAT C2-1 C3-1 C3-2 C3-3 C4-1 C8-1 C8-2 SITE PLAN GRADING PLAN SWPPP PLAN SWPPP NOTES UTILITY PLAN DETAILS DETAILS L1-1 LANDSCAPE / TREE PRESERVATION PLAN L2-1 LANDSCAPE DETAILS Review Date SHEET INDEX License No. Date I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota. Todd W. McLouth - PE 20383 Project Lead Drawn By Checked By Loucks Project No.16430 TWM GAJ TWM 01/10/17 C1-2 ALTA / EXISTING CONDITIONS N GRADING PLAN C3-1 NOTE: SPOT ELEVATIONS AT CURB LINES INDICATE GUTTER LINE (I.E. FLOW LINE) ELEVATIONS UNLESS OTHERWISE NOTED. GRADING NOTES 1.BACKGROUND INFORMATION IS BASED ON A FIELD SURVEY BY LOUCKS ASSOCIATES. THE CONTRACTOR SHALL REFER TO THE SITE PLANS FOR ADDITIONAL LOCATIONS AND DIMENSIONS SITE FEATURES. 2.THE CONTRACTOR SHALL TAKE ALL PRECAUTIONS NECESSARY TO AVOID PROPERTY DAMAGE TO ADJACENT PROPERTIES DURING THE CONSTRUCTION PHASE OF THIS PROJECT. THE CONTRACTOR WILL BE HELD RESPONSIBLE FOR ANY DAMAGES TO ADJACENT PROPERTIES OCCURRING DURING THE CONSTRUCTION PHASE OF THIS PROJECT. 3.IN ACCORDANCE WITH GENERALLY ACCEPTED CONSTRUCTION PRACTICES, THE CONTRACTOR WILL BE SOLELY AND COMPLETELY RESPONSIBLE FOR CONDITIONS ON THE JOB SITE, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY DURING THE PERFORMANCE OF THE WORK. THIS REQUIREMENT WILL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS. 4.EROSION AND SEDIMENTATION CONTROL MEASURES SHALL BE ESTABLISHED AROUND THE ENTIRE SITE PERIMETER AND IN ACCORDANCE WITH NPDES PERMIT REQUIREMENTS, BEST MANAGEMENT PRACTICES, CITY REQUIREMENTS, AND THE SWPP PLAN. 5.ALL SPOT ELEVATIONS SHOWN REPRESENT FINISHED SURFACE OR GUTTER LINE ELEVATIONS UNLESS OTHERWISE NOTED. 6.CONTRACTOR TO VERIFY EXISTING INFORMATION PRIOR TO CONSTRUCTION AND NOTIFY ENGINEER OF ANY PLAN DISCREPANCIES. 7.EXISTING UTILITY LOCATIONS AS-PER CITY AS-BUILT PLANS AND FIELD SHOTS. 8.SEE PROJECT SWPPP FOR EROSION CONTROL INFORMATION. 9.GENERAL CONTRACTOR MUST VERIFY ALL TIE IN GRADES. 10.REFER TO GEOTECHNICAL REPORT FOR MORE INFORMATION. 11. THE CONTRACTOR SHALL PRESERVE AND AVOID ANY EXISTING BURIED UTILITY PIPING. SEE EXISTING CONDITIONS PLAN FOR EXISTING UTILITIES. ABBREVIATION LEGEND FFE=FINISHED FLOOR ELEVATION TW=TOP OF RETAINING WALL GW=GROUND AT FACE OF RETAINING WALL HP=HIGH POINT LP=LOW POINT TC=TOP OF CURB GL=GUTTER LINE CC=CURB CUT LEGEND EXISTING PROPOSED X 800.0 800  X.XX% TOPOGRAPHIC CONTOUR SPOT ELEVATION DRAINAGE SLOPE STORM SEWER STORM MANHOLE CATCH BASIN SANITARY SEWER WATERMAIN BENCHMARK FLOW EMERGENCY OVERFLOW THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL EXISTING UTILITIES. THEY SHALL COOPERATE WITH ALL UTILITY COMPANIES IN MAINTAINING THEIR SERVICE AND / OR RELOCATION OF LINES. THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT LEAST 48 HOURS IN ADVANCE FOR THE LOCATIONS OF ALL UNDERGROUND WIRES, CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIED STRUCTURES BEFORE DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED DURING CONSTRUCTION AT NO COST TO THE OWNER. WARNING 22.00' 22.00' 22.00' 22.00' 22.00' 22.00' 28.00' 28.00'28.00'F-F F-F F-F F-F F-F F-F F-F F-F F-FCONCRETE CROSS GUTTER EOF 1 2 3 4 5 6 7 8 39 42 40 41 35 38 36 37 31 34 32 33 19 18 20 17 15 14 16 13 11 10 12 9 30 29 28 27 26 25 24 23 22 21 43 43 43 43 (DRAINAGE & UTILITY EASEMENT OVER ALL OF LOT 43) LOUCKS W:\2016\16430\CADD DATA\CIVIL\_dwg Sheet Files\C16430 C3-2&3 SWPP Plan & NotesPlotted: 01 /06 / 2017 3:14 PM7200 Hemlock Lane, Suite 300 Maple Grove, MN 55369 763.424.5505 www.loucksinc.com PLANNING CIVIL ENGINEERING LAND SURVEYING LANDSCAPE ARCHITECTURE ENVIRONMENTAL SUBMITTAL/REVISIONS PROFESSIONAL SIGNATURE QUALITY CONTROL CADD files prepared by the Consultant for this project are instruments of the Consultant professional services for use solely with respect to this project. These CADD files shall not be used on other projects, for additions to this project, or for completion of this project by others without written approval by the Consultant. With the Consultant's approval, others may be permitted to obtain copies of the CADD drawing files for information and reference only. All intentional or unintentional revisions, additions, or deletions to these CADD files shall be made at the full risk of that party making such revisions, additions or deletions and that party shall hold harmless and indemnify the Consultant from any & all responsibilities, claims, and liabilities. CADD QUALIFICATION HARMONY VILLAS ROSEMOUNT, MINNESOTA MARK ELLIOT HOMES MARK PASVOGEL 7741 147th STREET W. APPLE VALLEY, MN 53124 01/10/17 Preliminary Plat Submittal Review Date SHEET INDEX License No. Date I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Landscape Architect under the laws of the State of Minnesota. Gregory A. Johnson - LA Project Lead Drawn By Checked By Loucks Project No. 24610 16430 TWM GAJ TWM 01/10/17 PRELI MI N A R Y C1-1 DEMOLITION PLAN C2-1 C3-1 C3-2 C3-3 C4-1 C8-1 C8-2 SITE PLAN GRADING PLAN SWPPP PLAN SWPPP NOTES UTILITY PLAN DETAILS DETAILS L1-1 LANDSCAPE / TREE PRESERVATION PLAN L2-1 LANDSCAPE DETAILS N STORMWATER POLLUTION PREVENTION PLAN C3-2 WARNING: THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL EXISTING UTILITIES. THEY SHALL COOPERATE WITH ALL UTILITY COMPANIES IN MAINTAINING THEIR SERVICE AND / OR RELOCATION OF LINES. THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT LEAST 48 HOURS IN ADVANCE FOR THE LOCATIONS OF ALL UNDERGROUND WIRES, CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIED STRUCTURES BEFORE DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED DURING CONSTRUCTION AT NO COST TO THE OWNER. SITE PLAN LEGEND SILT FENCE INLET PROTECTION EXISTING DRAINAGE PATTERN PROPOSED DRAINAGE PATTERN RECEIVING WATERS NAME OF WATER BODY TYPE OF WATER BODY SPECIAL WATER IMAIRED WATER PERMANENT STORMWATER MANAGEMENT INFILTRATION STORMWATER HARVEST AND REUSE FILTRATION WET SEDIMENTATION BASIN REGIONAL PONDING ESTIMATED QUANTITIES DESCRIPTION UNIT TEMPORARY ROCK CONSTRUCTION ENTRANCE EA SILT FENCE (STANDARD)LF INLET PROTECTION EA QUANTITY 2 !%( 17 WOODFIBER BLANKET SF  EROSION CONTROL BLANKET X REGIONAL PONDING BIOROLL BIOROLL LF  SITE BOUNDARY 1 MILE BUFFER AREA NO NOPOND LOUCKS W:\2016\16430\CADD DATA\CIVIL\_dwg Sheet Files\C16430 C3-2&3 SWPP Plan & NotesPlotted: 01 /06 / 2017 3:14 PM7200 Hemlock Lane, Suite 300 Maple Grove, MN 55369 763.424.5505 www.loucksinc.com PLANNING CIVIL ENGINEERING LAND SURVEYING LANDSCAPE ARCHITECTURE ENVIRONMENTAL SUBMITTAL/REVISIONS PROFESSIONAL SIGNATURE QUALITY CONTROL CADD files prepared by the Consultant for this project are instruments of the Consultant professional services for use solely with respect to this project. These CADD files shall not be used on other projects, for additions to this project, or for completion of this project by others without written approval by the Consultant. With the Consultant's approval, others may be permitted to obtain copies of the CADD drawing files for information and reference only. All intentional or unintentional revisions, additions, or deletions to these CADD files shall be made at the full risk of that party making such revisions, additions or deletions and that party shall hold harmless and indemnify the Consultant from any & all responsibilities, claims, and liabilities. CADD QUALIFICATION HARMONY VILLAS ROSEMOUNT, MINNESOTA MARK ELLIOT HOMES MARK PASVOGEL 7741 147th STREET W. APPLE VALLEY, MN 53124 01/10/17 Preliminary Plat Submittal Review Date SHEET INDEX License No. Date I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Landscape Architect under the laws of the State of Minnesota. Gregory A. Johnson - LA Project Lead Drawn By Checked By Loucks Project No. 24610 16430 TWM GAJ TWM 01/10/17 PRELI MI N A R Y C1-1 DEMOLITION PLAN C2-1 C3-1 C3-2 C3-3 C4-1 C8-1 C8-2 SITE PLAN GRADING PLAN SWPPP PLAN SWPPP NOTES UTILITY PLAN DETAILS DETAILS L1-1 LANDSCAPE / TREE PRESERVATION PLAN L2-1 LANDSCAPE DETAILS STORMWATER POLLUTION PREVENTION NOTES C3-3 1.PROJECT DESCRIPTION THE NATURE OF THIS PROJECT WILL CONSIST OF CONSTRUCTING A HOUSING DEVELOPMENT. INCLUDING TOWNHOMES, STREETS, AND UTILITIES. THE PROPOSED STORMWATER SYSTEM WILL CONNECT INTO THE EXISTING STORMWATER SYSTEM ON SITE AND CONVEY STORMWATER TO A REGIONAL POND. 2.SEQUENCING OF MAJOR CONSTRUCTION ACTIVITIES ARE AS FOLLOWS: 1.INSTALL VEHICLE TRACKING BMP 2.INSTALL SILT FENCE AROUND SITE 3.INSTALL PROTECTIVE FENCE AROUND FILTRATION AREAS 4.CLEAR AND GRUB SITE 5.STRIP AND STOCKPILE TOPSOIL 6.REMOVE PAVEMENTS 7.INSTALL ADDITIONAL EROSION MEASURES 8.ROUGH GRADE SITE, IF BASIN AREA USED FOR TEMPORARY SEDIMENTATION BASIN, LEAVE A MINIMUM OF 1' COVER OVER THE PRACTICE TO PROTECT UNDERLYING SOILS. SEE DETAIL C8-1 9.IMPORT CLEAN FILL FOR REPLACEMENT AND BALANCE 10.INSTALL STORM SEWER, KEEP CASTING OFF LINE UNTIL PAVEMENT INSTALLED 11.INSTALL CURB AND GUTTER 12.INSTALL PAVEMENTS AND WALKS 13.FINAL GRADE SITE 14.SEED AND MULCH GRADED AREAS 15.REMOVE ANY SEDIMENT FROM ROUGH GRADED BASIN AREA 16.CONSTRUCT INFILTRATION BASIN FOLLOWING STABILIZATION OF CONTRIBUTING DRAINAGE AREA PER DESIGN DETAIL ON C8-1 17.INSTALL DRAINTILE AND ENGINEERED SOILS 18.INSTALL SILT FENCE AROUND BASIN 19.SEED AND MULCH BASIN 20.STORM SEWER ON LINE 21.WHEN ALL CONSTRUCTION ACTIVITY IS COMPLETE AND THE SITE IS STABILIZED, REMOVE SILT FENCE AND RESEED ANY AREAS DISTURBED BY THE REMOVAL. BASIN SILT FENCE IS NOT TO BE REMOVED UNTIL DRAINAGE AREA IS STABILIZED. 3.SITE DATA: AREA OF DISTURBANCE:' $)!&13 PRE-CONSTRUCTION IMPERVIOUS AREA: 13 POST-CONSTRUCTION IMPERVIOUS AREA:$"%'!'13 GENERAL SOIL TYPE:SEE GEOTECHNICAL REPORT 4.THE LOCATION OF AREAS NOT TO BE DISTURBED MUST BE IDENTIFIED WITH FLAGS, STAKES, SIGNS, SILT FENCE, ETC. BEFORE CONSTRUCTION BEGINS. 5.ALL DISTURBED GROUND LEFT INACTIVE FOR SEVEN (7) OR MORE DAYS SHALL BE STABILIZED BY SEEDING OR SODDING (ONLY AVAILABLE PRIOR TO SEPTEMBER 15) OR BY MULCHING OR COVERING OR OTHER EQUIVALENT CONTROL MEASURE. AT A RATE OF 1.5 TIMES STANDARD SEEDING FINAL STABILIZATION TO BE DONE PER LANDSCAPE PLAN, SEE SHEET L1-1. 6.ON SLOPES 3:1 OR GREATER MAINTAIN SHEET FLOW AND MINIMIZE RILLS AND/OR GULLIES, SLOPE LENGTHS CAN NOT BE GREATER THAN 75 FEET. DENOTES SLOPES GREATER THAN 3:1. ALL 3:1 SLOPES TO BE STABILIZED WITH EROSION CONTROL BLANKET 7.ALL STORM DRAINS AND INLETS MUST BE PROTECTED UNTIL ALL SOURCES OF POTENTIAL DISCHARGE ARE STABILIZED. 8.TEMPORARY SOIL STOCKPILES MUST HAVE EFFECTIVE SEDIMENT CONTROL AND CAN NOT BE PLACED IN SURFACE WATERS OR STORM WATER CONVEYANCE SYSTEMS. TEMPORARY STOCKPILES WITHOUT SIGNIFICANT AMOUNT OF SILT, CLAY, OR ORGANIC COMPOUNDS ARE EXEMPT EX: CLEAN AGGREGATE STOCK PILES, DEMOLITION CONCRETE STOCKPILES, SAND STOCKPILES. 9.SEDIMENT LADEN WATER MUST BE DISCHARGED TO A SEDIMENTATION BASIN WHENEVER POSSIBLE. IF NOT POSSIBLE, IT MUST BE TREATED WITH THE APPROPRIATE BMP'S. 10.SOLID WASTE MUST BE DISPOSED OF PROPERLY AND MUST COMPLY WITH MPCA DISPOSAL REQUIREMENTS. 11.THE WATERSHED DISTRICT OR THE CITY MAY HAVE REQUIREMENTS FOR INSPECTIONS OR AS-BUILT DRAWINGS VERIFYING PROPER CONSTRUCTION OF THE BMPS. 12.THE OWNER WHO SIGNS THE NPDES PERMIT APPLICATION IS A PERMITTEE AND IS RESPONSIBLE FOR COMPLIANCE WITH ALL TERMS AND CONDITIONS OF THE PERMIT. THE OPERATOR (CONTRACTOR) WHO SIGNS THE NPDES PERMIT APPLICATION IS A PERMITTEE FOR PARTS II.B., PART II.C, PART II.B-F, PART V, PART IV AND APPLICABLE CONSTRUCTION ACTIVITY REQUIREMENTS FOUND IN APPENDIX A, PART C. OF THE NPDES PERMIT AND IS JOINTLY RESPONSIBLE WITH THE OWNER FOR COMPLIANCE WITH THOSE PORTIONS OF THE PERMIT. 13.TERMINATION OF COVERAGE-PERMITTEE(S) WISHING TO TERMINATE COVERAGE MUST SUBMIT A NOTICE OF TERMINATION (NOT) TO THE MPCA. ALL PERMITTEE(S) MUST SUBMIT A NOT WITHIN 30 DAYS AFTER ONE OR MORE OF THE FOLLOWING CONDITIONS HAVE BEEN MET: A.FINAL STABILIZATION, PER NPDES PERMIT PART IV.G. HAS BEEN ACHIEVED ON ALL PORTIONS OF THE SITE FOR WHICH THE PERMITTEE IS RESPONSIBLE. B.TRANSFER OF OWNERSHIP AS DESCRIBED IN THE PERMIT. 15. INSPECTIONS A.INITIAL INSPECTION FOLLOWING SILT FENCE INSTALLATION BY CITY REPRESENTATIVE IS REQUIRED. B.EXPOSED SOIL AREAS: ONCE EVERY 7 DAYS AND WITHIN 24 HOURS FOLLOWING A 0.5" OVER 24 HOUR RAIN EVENT. C.STABILIZED AREAS: ONCE EVERY 30 DAYS D.FROZEN GROUND: AS SOON AS RUNOFF OCCURS OR PRIOR TO RESUMING CONSTRUCTION. E.INSPECTION AND MAINTENANCE RECORDS MUST BE RETAINED FOR 3 YEARS AFTER FILING OF THE NOTICE OF TERMINATION AND MUST INCLUDE: DATE AND TIME OF ACTION, NAME OF PERSON(S) CONDUCTING WORK, FINDING OF INSPECTIONS AND RECOMMENDATIONS FOR CORRECTIVE ACTION, DATE AND AMOUNT OF RAINFALL EVENTS GREATER THAN 0.5 INCHES IN A 24 HOUR PERIOD. 16. MINIMUM MAINTENANCE A.SILT FENCE TO BE REPAIRED, REPLACED, SUPPLEMENTED WHEN NONFUNCTIONAL, OR 1/3 FULL; WITHIN 24 HOURS B.SEDIMENT BASINS DRAINED AND SEDIMENT REMOVED WHEN REACHES 1/2 STORAGE VOLUME. REMOVAL MUST BE COMPLETE WITHIN 72 HOURS OF DISCOVERY. C.SEDIMENT REMOVED FROM SURFACE WATERS WITHIN (7)SEVEN DAYS D.CONSTRUCTION SITE EXITS INSPECTED, TRACKED SEDIMENT REMOVED WITH 24 HOURS. E.PROVIDE COPIES OF EROSION INSPECTION RESULTS TO CITY ENGINEER FOR ALL EVENTS GREATER THAN 12" IN 24 HOURS 17.THE SWPPP, INCLUDING ALL CHANGES TO IT, AND INSPECTIONS AND MAINTENANCE RECORDS MUST BE KEPT AT THE SITE DURING CONSTRUCTION ACTIVITY BY THE PERMITTEE(S) WHO HAVE OPERATIONAL CONTROL OF THE SITE. 18.OWNER MUST KEEP RECORDS OF ALL PERMITS REQUIRED FOR THE PROJECT, THE SWPPP, ALL INSPECTIONS AND MAINTENANCE, PERMANENT OPERATION AND MAINTENANCE AGREEMENTS, AND REQUIRED CALCULATIONS FOR TEMPORARY AND PERMANENT STORM WATER MANAGEMENT SYSTEMS. THESE RECORDS MUST BE RETAINED FOR THREE YEARS AFTER FILING NPDES NOTICE OF TERMINATION. 19.SWPPP MUST BE AMENDED WHEN: A.THERE IS A CHANGE IN DESIGN, OPERATION, MAINTENANCE, WEATHER OR SEASONAL CONDITIONS THAT HAS A SIGNIFICANT EFFECT ON DISCHARGE B.INSPECTIONS INDICATE THAT THE SWPPP IS NOT EFFECTIVE AND DISCHARGE IS EXCEEDING WATER QUALITY STANDARDS. C.THE BMP'S IN THE SWPPP ARE NOT CONTROLLING POLLUTANTS IN DISCHARGES OR IS NOT CONSISTENT WITH THE TERMS AND CONDITIONS OF THE PERMIT. D.AT ANY TIME AFTER PERMIT COVERAGE IS EFFECTIVE, THE MPCA MAY DETERMINE THAT THE PROJECT'S STORMWATER DISCHARGES MAY CAUSE, HAVE REASONABLE POTENTIAL TO CAUSE, OR CONTRIBUTE TO NON-ATTAINMENT OF ANY APPLICABLE WATER QUALITY STANDARD, OR THAT THE SWPPP DOES NOT INCORPORATE THE APPLICABLE REQUIREMENTS IN PART III.A.8., (IMPAIRED WATERS AND TMDLS). IF A WATER QUALITY STANDARD CHANGES DURING THE TERM OF THIS PERMIT, THE MPCA WILL MAKE A DETERMINATION AS TO WHETHER A MODIFICATION OF THE SWPPP IS NECESSARY TO ADDRESS THE NEW STANDARD. IF THE MPCA MAKES SUCH DETERMINATION(S) OR ANY OF THE DETERMINATIONS IN PARTS III.B.1.-3., THE MPCA WILL NOTIFY THE PERMITTEE(S) IN WRITING. IN RESPONSE, THE PERMITTEE(S) MUST AMEND THE SWPPP TO ADDRESS THE IDENTIFIED CONCERNS AND SUBMIT INFORMATION REQUESTED BY THE MPCA, WHICH MAY INCLUDE AN INDIVIDUAL PERMIT APPLICATION. IF THE MPCA'S WRITTEN NOTIFICATION REQUIRES A RESPONSE, FAILURE TO RESPOND WITHIN THE SPECIFIED TIMEFRAME CONSTITUTES A PERMIT VIOLATION. 20.CONCRETE WASHOUT AREA A.CONCRETE WASH-OUT IS NOT ALLOWED ON SITE. 21.IN THE EVENT OF ENCOUNTERING A WELL OR SPRING DURING CONSTRUCTION CONTRACTOR TO CEASE CONSTRUCTION ACTIVITY AND NOTIFY ENGINEER. 22.PIPE OUTLETS MUST BE PROVIDED WITH TEMPORARY OR PERMANENT ENERGY DISSIPATION WITHIN 24 HOURS AFTER CONNECTION TO A SURFACE WATER. 23.FINAL STABILIZATION FINAL STABILIZATION REQUIRES THAT ALL SOIL DISTURBING ACTIVITIES HAVE BEEN COMPLETED AND THAT DISTURBED AREAS ARE STABILIZED BY A UNIFORM PERENNIAL VEGETATIVE COVER WITH 70% OF THE EXPECTED FINAL DENSITY, AND THAT ALL PERMANENT PAVEMENTS HAVE BEEN INSTALLED. ALL TEMPORARY BMP'S SHALL BE REMOVED, DITCHES STABILIZED, AND SEDIMENT SHALL BE REMOVED FROM PERMANENT CONVEYANCES AND SEDIMENTATION BASINS IN ORDER TO RETURN THE POND TO DESIGN CAPACITY. 24. TEMPORARY SEDIMENTATION BASINS A.THE TEMPORARY SEDIMENTATION BASINS SHALL BE CONSTRUCTED AND MADE OPERATIONAL PRIOR TO DISTURBANCE OF 10 OR MORE ACRES DRAINING TO A COMMON LOCATION. B.TEMPORARY SEDIMENTATION BASINS ARE REQUIRED PRIOR TO RUNOFF LEAVING THE CONSTRUCTION SITE OR ENTERING SURFACE WATERS WHEN 10 OR MORE ACRES OF DISTURBED SOILS DRAIN TO A COMMON LOCATION. THE BASIN MUST PROVIDE 3,600 CUBIC FEET OF STORAGE BELOW THE OUTLET PER ACRE DRAINED. IF HYDRAULIC CALCULATIONS ARE AVAILABLE, THE TEMPORARY SEDIMENTATION BASIN MUST PROVIDE A STORAGE VOLUME EQUIVALENT TO THE 2-YEAR, 24-HOUR STORM, BUT IN NO CASE LESS THAN 1800 CUBIC FEET PER ACRE DRAINED. THE TEMPORARY SEDIMENTATION BASIN MUST BE CONSTRUCTED AND MADE OPERATIONAL CONCURRENT WITH THE START OF SOIL DISTURBANCE UP GRADIENT OF THE POND. THE TEMPORARY SEDIMENTATION BASIN SHALL BE DESIGNED TO PREVENT SHORT CIRCUITING. THE OUTFALL SHALL BE DESIGNED TO REMOVE FLOATABLE DEBRIS, ALLOW FOR COMPLETE DRAWDOWN OF THE POND FOR MAINTENANCE ACTIVITIES, AND HAVE ENERGY DISSIPATION. THE EMERGENCY SPILLWAY SHALL BE STABILIZED. C.TEMPORARY SEDIMENTATION BASINS SHALL BE SITUATED OUTSIDE OF SURFACE WATERS AND ANY REQUIRED BUFFER ZONE, AND MUST BE DESIGNED TO AVOID DRAINING WETLANDS, UNLESS THE IMPACT IS IN COMPLIANCE WITH THE REQUIREMENTS OF THIS PERMIT. D.EXCESSIVE SEDIMENT-LADEN WATER THAT IS NOT PROPERLY FILTERED WILL NOT BE PERMITTED TO DISCHARGE FROM SIRE. 25.DEWATERING AND BASIN DRAINING A.TURBID OR SEDIMENT-LADEN WATERS RELATED TO DEWATERING OR BASIN DRAINING SHALL BE DISCHARGED TO A TEMPORARY OR PERMANENT SEDIMENTATION BASIN ON THE PROJECT SITE UNLESS INFEASIBLE. THE TEMPORARY OR PERMANENT BASIN MAY DISCHARGE TO SURFACE WATERS IF THE BASIN WATER HAS BEEN VISUALLY CHECKED TO ENSURE ADEQUATE TREATMENT HAS BEEN OBTAINED IN THE BASIN AND THAT THE NUISANCE CONDITIONS WILL NOT RESULT FROM THE DISCHARGE. DISCHARGE POINTS SHALL BE ADEQUATELY PROTECTED FROM EROSION AND PROPER VELOCITY DISSIPATION PROVIDED. B.ALL WATER FROM DEWATERING OR BASIN-DRAINING ACTIVITIES MUST BE DISCHARGED IN A MANNER THAT DOES NOT CAUSE NUISANCE CONDITIONS, EROSION IN THE RECEIVING CHANNELS OR ON DOWN SLOPE PROPERTIES, OR INUNDATION IN WETLANDS CAUSING SIGNIFICANT ADVERSE IMPACTS TO THE WETLAND. C.IF FILTERS WITH BACKWASH WATERS ARE USED, THE BACKWASH WATER SHALL BE HAULED AWAY FOR DISPOSAL, RETURNED TO THE BEGINNING OF THE TREATMENT PROCESS, OR INCORPORATED INTO SITE IN A MANNER THAT DOES NOT CAUSE EROSION. BACKWASH WATER MAY BE DISCHARGED TO SANITARY SEWER IF PERMISSION IS GRANTED BY THE SANITARY SEWER AUTHORITY. 26.POLLUTION PREVENTION A.BUILDING PRODUCTS THAT HAVE THE POTENTIAL TO LEACH POLLUTANTS MUST BE UNDER COVER TO PREVENT DISCHARGE OR PROTECTED BY AN EFFECTIVE MEANS DESIGNED TO MINIMIZE CONTACT WITH STORMWATER. B.PESTICIDES, HERBICIDES, INSECTICIDES, FERTILIZERS, TREATMENT CHEMICALS, AND LANDSCAPE MATERIALS MUST BE UNDER COVER. C.HAZARDOUS MATERIALS AND TOXIC WASTE MUST BE PROVIDED TO PREVENT VANDALISM. D.SOLID WASTER MUST BE STORED, COLLECTED AND DISPOSED OF IN COMPLIANCE WITH MINN. R. CH 7035. E.PORTABLE TOILETS MUST BE POSITIONED SO THAT THEY ARE SECURE AND WILL NOT BE TIPPED OR KNOCKED OVER. SANITARY WASTE MUST BE DISPOSED OF PROPERLY IN ACCORDANCE WITH MINN. R. CH 7041. F.DISCHARGE OF SPILLED OR LEAKED CHEMICALS, INCLUDING FUEL, FROM ANY AREA WHERE CHEMICALS OR FUEL WILL BE LOADED OR UNLOADED SHALL BE PREVENTED USING DRIP PANS OR ABSORBENTS. SUPPLIES SHALL BE AVAILABLE AT ALL TIMES TO CLEAN UP DISCHARGED MATERIALS AND THAT AN APPROPRIATE DISPOSAL METHOD MUST BE AVAILABLE FOR RECOVERED SPILLED MATERIALS. 27. DESIGN CALCULATIONS TEMPORARY & PERMANENT STORMWATER TREATMENT ARE DESIGNED TO MEET MPCA GENERAL & SPECIAL WATER REQUIREMENTS. CALCULATIONS ARE PART OF THE HYDROLOGY REPORT, WHICH IS TO BE CONSIDERED PART OF THE SWPPP DOCUMENTS. SEE HYDROLOGY REPORT FOR ADDITIONAL INFORMATION. 28.GENERAL STORMWATER DISCHARGE REQUIREMENTS ALL REQUIREMENTS LISTED IN PART III OF THE PERMIT FOR DESIGN OF THE PERMANENT STORMWATER MANAGEMENT SYSTEM AND DISCHARGE HAVE BEEN INCLUDED IN THE PREPARATION OF THIS SWPP. THESE INCLUDE BUT ARE NOT LIMITED TO: A.THE EXPECTED AMOUNT, FREQUENCY, INTENSITY, AND DURATION PRECIPITATION. B.THE NATURE OF STORMWATER RUNOFF AND RUN-ON AT THE SITE. C.PEAK FLOW RATES AND STORWATER VOLUMES TO MINIMIZE EROSION AT OUTLETS AND DOWNSTREAM CHANNEL AND STREAM BANK EROSION. D.THE RANGE OF SOIL PARTICLE SIZES EXPECTED TO BE PRESENT ON THE SITE. 29.CONSTRUCTION OF FILTRATION BASINS A.NO HEAVY TRAFFIC ON FILTRATION AREAS. CONSTRUCTION TO BE DONE WITH MINIMAL COMPACTION COMPACTION TO FILTRATION AREAS. IF COMPACTION IS ENCOUNTERED, BASIN SOILS FOR THE FIRST & MUST BE REMOVED & RELAID. B.INFILTRATION SYSTEMS MUST NOT BE EXCAVATED TO FINAL GRADE UNTIL THE CONTRIBUTING DRAINAGE AREA HAD BEEN CONSTRUCTED AND FULLY STABILIZED UNLESS RIGOROUS EROSION PREVENTION AND SEDIMENT CONTROLS ARE PROVIDED( PART III.D.1.C.). C.WHEN AN INFILTRATION SYSTEM IS EXCAVATED TO FINAL GRADE (OR WITHIN THREE (3) FEET OF FINAL GRADE), THE PERMITTEE(S) MUST EMPLOY RIGOROUS EROSION PREVENTION AND SEDIMENT CONTROLS (E.G., DIVERSION BERMS) TO KEEP SEDIMENT AND RUNOFF COMPLETELY AWAY FROM THE INFILTRATION AREA. THE AREA MUST BE STAKED OFF AND MARKED SO THAT HEAVY CONSTRUCTION VEHICLES OR EQUIPMENT WILL NOT COMPACT THE SOIL IN THE PROPOSED INFILTRATION AREA. D.TO PREVENT CLOGGING OF THE INFILTRATION OR FILTRATION SYSTEM, THE PERMITTEE(S) MUST USE A PRETREATMENT DEVICE SUCH AS A VEGETATED FILTER STRIP, SMALL SEDIMENTATION BASIN, OR WATER QUALITY INLET (E.G., GRIT CHAMBER) TO SETTLE PARTICULATES BEFORE THE STORMWATER DISCHARGES INTO THE INFILTRATION OF FILTRATION SYSTEM. 30.POST CONSTRUCTION THE WATER QUALITY VOLUME THAT MUST BE RETAINED ON SITE BY THE PROJECT'S PERMANENT STORMWATER MANAGEMENT SYSTEM DESCRIBED IN PART III.D. SHALL BE ONE (1) INCH OF RUNOFF FROM THE NEW IMPERVIOUS SURFACES CRATED BY THE PROJECT. SEE PART III.D.1. FOR MORE INFORMATION ON INFILTRATION DESIGN, PROHIBITIONS AND APPROPRIATE SITE CONDITIONS. 31.RESPONSIBILITIES A.THE OWNER MUST IDENTIFY A CONTRACTOR WHO WILL OVERSEE THE SWPPP IMPLEMENTATION AND THE PERSON RESPONSIBLE FOR INSPECTION AND MAINTENANCE: B.THE OWNER MUST IDENTIFY THE A PERSON WHO WILL BE RESPONSIBLE FOR LONG TERM OPERATIONS AND MAINTENANCE OF THE PERMANENT STORMWATER MANAGEMENT SYSTEM: 32.TRAINING REQUIREMENTS THE PERMITTES(S) SHALL ENSURE THE FOLLOWING INDIVIDUALS IDENTIFIED IN THIS PART HAVE BEEN TRAINED IN ACCORDANCE WITH THIS PERMIT'S TRAINING REQUIREMENTS. 1. WHO MUST BE TRAINED: A. INDIVIDUAL(S) PREPARING THE SWPPP FOR THE PROJECT B. INDIVIDUAL(S) OVERSEEING IMPLEMENTATION OF, REVISING, AND AMENDING THE SWPPP AND INDIVIDUALS(S) PERFORMING INSPECTIONS AS REQUIRED IN PART IV.E. ONE OF THESE INDIVDUAL(S) MUST BE AVAILABLE FOR AN ONSITE INSPECTION WITHIN 72 HOURS UPON REQUEST BY THE MPCA. C.INDIVIDUAL(S) PERFORMING OR SUPERVISING THE INSTALLATION, MAINTENANCE AND REPAIR OF BMPS. AT LEAST ONE INDIVIDUAL ON A PROJECT MUST BE TRAINED IN THESE JOB DUTIES. 2.TRAINING CONTENT: THE CONTENT AND EXTENT OF TRAINING MUST BE COMMENSURATE WITH THE INDIVIDUAL'S JOB DUTIES AND RESPONSIBILITIES WITH REGARD TO ACTIVITIES COVERED UNDER THIS PERMIT FOR THE PROJECT. AT LEAST ONE INDIVIDUAL PRESENT ON THE PERMITTED PROJECT SITE (OR AVAILABLE TO THE PROJECT SIRE IN 72 HOURS) MUST BE TRAINED IN THE JOB DUTIES DESCRIBED IN PART III.F.1.B. AND PARTIII.F.1.C. 3.THE PERMITTEE(S) SHALL ENSURE THAT THE INDIVIDUALS ARE TRAINED BY LOCAL, STATE, FEDERAL AGENCIES, PROFESSIONAL OR OTHER ENTITIES WITH EXPERTISE IN EROSION PREVENTION, SEDIMENT CONTROL, PERMANENT STORMWATER MANAGEMENT AND THE MINNESOTA NPDES/SDS CONSTRUCTION STORMWATER PERMIT. AN UPDATE REFESHER-TREINING MUST BE ATTENDED EVERY THREE (3) YEARS STARTING THREE (3) YEARS FROM THE ISSUANCE DATE OF THIS PERMIT. 2.LIST OF CONTACTS * MPCA 24HR. HAZARDOUS SPILL HOTLINE: 651-649-5457 OF 80420798 SWPPP NOTES TITLE CONTACT OWNER MARK PASVOGEL COMPANY PHONE NUMBER MARK ELLIOT HOMES 651-226-5060 PROJECT MANAGER TODD MCLOUTH LOUCKS 763-496-6742 SWPPP DESIGNER ZACHARY WEBBER LOUCKS 763-496-6753 CONTRACTOR SITE MANAGER PENDING TBD .. LOUCKS W:\2016\16430\CADD DATA\CIVIL\_dwg Sheet Files\C16430 C4-1 Utility PlanPlotted: 01 /30 / 2017 11:2 AM7200 Hemlock Lane, Suite 300 Maple Grove, MN 55369 763.424.5505 www.loucksinc.com PLANNING CIVIL ENGINEERING LAND SURVEYING LANDSCAPE ARCHITECTURE ENVIRONMENTAL SUBMITTAL/REVISIONS PROFESSIONAL SIGNATURE QUALITY CONTROL CADD files prepared by the Consultant for this project are instruments of the Consultant professional services for use solely with respect to this project. These CADD files shall not be used on other projects, for additions to this project, or for completion of this project by others without written approval by the Consultant. With the Consultant's approval, others may be permitted to obtain copies of the CADD drawing files for information and reference only. All intentional or unintentional revisions, additions, or deletions to these CADD files shall be made at the full risk of that party making such revisions, additions or deletions and that party shall hold harmless and indemnify the Consultant from any & all responsibilities, claims, and liabilities. CADD QUALIFICATION HARMONY VILLAS ROSEMOUNT, MINNESOTA MARK ELLIOT HOMES MARK PASVOGEL 7741 147th STREET W. APPLE VALLEY, MN 53124 01/10/17 Preliminary Plat Submittal PRELI MI N A R Y C1-1 PRELIMINARY PLAT C2-1 C3-1 C3-2 C3-3 C4-1 C8-1 C8-2 SITE PLAN GRADING PLAN SWPPP PLAN SWPPP NOTES UTILITY PLAN DETAILS DETAILS L1-1 LANDSCAPE / TREE PRESERVATION PLAN L2-1 LANDSCAPE DETAILS Review Date SHEET INDEX License No. Date I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota. Todd W. McLouth - PE 20383 Project Lead Drawn By Checked By Loucks Project No.16430 TWM GAJ TWM 01/10/17 C1-2 ALTA / EXISTING CONDITIONS N UTILITY PLAN C4-1 THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL EXISTING UTILITIES. THEY SHALL COOPERATE WITH ALL UTILITY COMPANIES IN MAINTAINING THEIR SERVICE AND / OR RELOCATION OF LINES. THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT LEAST 48 HOURS IN ADVANCE FOR THE LOCATIONS OF ALL UNDERGROUND WIRES, CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIED STRUCTURES BEFORE DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED DURING CONSTRUCTION AT NO COST TO THE OWNER. WARNING 1.BACKGROUND INFORMATION IS BASED ON A FIELD SURVEY BY LOUCKS ASSOCIATES AND RECORD UTILITY DRAWINGS FROM THE CITY OF BEMIDJI. LOUCKS ASSOCIATES DOES NOT GUARANTEE THE ACCURACY OF INFORMATION PROVIDED BY OTHERS. 2.ALL SANITARY SEWER, STORM SEWER AND WATERMAIN UTILITIES SHALL BE FURNISHED AND INSTALLED PER THE REQUIREMENTS OF THE SPECIFICATIONS, THE CITY AND THE STANDARD UTILITIES SPECIFICATION OF THE CITY ENGINEERS ASSOCIATION OF MINNESOTA (CEAM), 2013 EDITION. HDPE PIPE CONNECTIONS INTO ALL CONCRETE STRUCTURES SHALL BE MADE WITH WATER TIGHT MATERIALS, UTILIZING AN A-LOK OR WATERSTOP GASKET OR BOOT, CAST-IN-PLACE RUBBER BOOT, OR APPROVED EQUAL. WHERE THE ALIGNMENT PRECLUDES THE USE OF THE ABOVE APPROVED WATERTIGHT METHODS, CONSEAL 231 WATERSTOP SEALANT, OR APPROVED EQUAL WILL ONLY BE ALLOWED AS APPROVED BY THE ENGINEER. ALL SANITARY SEWER MAIN LINE SHALL BE SDR 35. ALL SANITARY SEWER SERVICES SHALL BE SDR 26. 3.SEE SHEETS C8-1 AND THE CONTRACT SPECIFICATIONS FOR SPECIFIC UTILITY DETAILS AND UTILITY SERVICE DETAILS. 4.ALL UTILITY PIPE BEDDING SHALL BE COMPACTED SAND OR FINE GRANULAR MATERIAL PER THE REQUIREMENTS OF THE CITY. ALL COMPACTION SHALL BE PERFORMED PER THE REQUIREMENTS OF THE CEAM SPECIFICATION. 5.THE CONTRACTOR SHALL NOTIFY GOPHER STATE ONE CALL AT 651-454-0002 AT LEAST 48 HOURS PRIOR TO PERFORMING ANY EXCAVATION OR UNDERGROUND WORK. 6.ADJUST ALL EXISTING STRUCTURES, BOTH PUBLIC AND PRIVATE TO THE PROPOSED GRADES WHERE DISTURBED AND COMPLY WITH ALL REQUIREMENTS OF THE UTILITY OWNERS. STRUCTURES BEING RESET TO PAVED AREAS MUST MEET OWNERS REQUIREMENTS FOR TRAFFIC LOADING. 7.PROPOSED PIPE MATERIALS: 7.1.STORM SEWER RCP 12" - 21" DIAMETER. 7.2.SANITARY SEWER PVC SDR 35 8" DIAMETER. MAIN 7.3.WATER SERVICE 1" COPPER TYPE K, 7.5' BURY DEPTH 7.4.SANITARY SERVICE 4" PVC SDR 26 SERVICES 8.STORM SEWER PIPE SHALL MEET OF EXCEED AASHTO M294 MINIMUM PIPE STIFFNESS PER ASTM D2412 60PSI FOR 8"-18". 9.THE REMOVAL OF EXISTING SERVICES WITHIN THE CONSTRUCTION LIMITS SHALL BE COORDINATED WITH THE GENERAL CONTRACTOR AND UTILITY OWNER. ADDITIONAL SERVICES MAY EXIST. 10.ALL WATER SERVICES MUST BE INSTALLED AT A 7.5-FT BURY DEPTH. 11.INSULATE ALL CROSSINGS INVOLVING WATER AND SEWER. UTILITY NOTES STRUCTURE MANHOLE SIZE CASTING CB 100 48" DIA.NEENAH R-3067 CBMH 101 48" DIA.NEENAH R-3067 CBMH 102 48" DIA.NEENAH R-3067 CB 103 2'X3' BOX NEENAH R-3067 CBMH 104 48" DIA.NEENAH R-3067 CB 105 2'X3' BOX NEENAH R-3067 CB 106 2'X3' BOX NEENAH R-3067 CB 107 2'X3' BOX NEENAH R-3067 CB 108 2'x3' BOX NEENAH R-3067 CBMH 109 48" DIA.NEENAH R-4342 CONNECT TO EXISTING STUB RELOCATE EXISTING 21' APRON - CONSTRUCT CB OVER EXISTING 21" RCP EXISTING CB 110 - ADJUST CASTING TO RIM ELEV. 956.6 EXISTING CB 111 - ADJUST CASTING TO RIM ELEV. 954.9 CORE DRILL AND CONNECT TO EXISTING CB INV. 949.4 CONNECT TO EXISTING STUB CONNECT TO EXISTING STUB CONNECT TO EXISTING MH HYDRANT & VALVE (TYP) 1" WATER SERVICE (TYP) 4" SEWER SERVICE (TYP) CONNECT TO EXISTING STUB REPLACE EXISTING CASTING WITH SOLID LIDREMOVE EXISTING CB AND ADJACENT PIPE CORE DRILL AND CONNECT TO EXISTING CB INV. 951.7 1 2 3 4 5 6 7 8 39 42 40 41 35 38 36 37 31 34 32 33 19 18 20 17 15 14 16 13 11 10 12 9 30 29 28 27 26 25 24 23 22 21 43 43 43 43 (DRAINAGE & UTILITY EASEMENT OVER ALL OF LOT 43) LOUCKS W:\2016\16430\CADD DATA\CIVIL\_dwg Sheet Files\C16430 C8-1 DetailsPlotted: 01 /30 / 2017 10:46 AM7200 Hemlock Lane, Suite 300 Maple Grove, MN 55369 763.424.5505 www.loucksinc.com PLANNING CIVIL ENGINEERING LAND SURVEYING LANDSCAPE ARCHITECTURE ENVIRONMENTAL SUBMITTAL/REVISIONS PROFESSIONAL SIGNATURE QUALITY CONTROL CADD files prepared by the Consultant for this project are instruments of the Consultant professional services for use solely with respect to this project. These CADD files shall not be used on other projects, for additions to this project, or for completion of this project by others without written approval by the Consultant. With the Consultant's approval, others may be permitted to obtain copies of the CADD drawing files for information and reference only. All intentional or unintentional revisions, additions, or deletions to these CADD files shall be made at the full risk of that party making such revisions, additions or deletions and that party shall hold harmless and indemnify the Consultant from any & all responsibilities, claims, and liabilities. CADD QUALIFICATION HARMONY VILLAS ROSEMOUNT, MINNESOTA MARK ELLIOT HOMES MARK PASVOGEL 7741 147th STREET W. APPLE VALLEY, MN 53124 01/10/17 Preliminary Plat Submittal PRELI MI N A R Y C1-1 PRELIMINARY PLAT C2-1 C3-1 C3-2 C3-3 C4-1 C8-1 C8-2 SITE PLAN GRADING PLAN SWPPP PLAN SWPPP NOTES UTILITY PLAN DETAILS DETAILS L1-1 LANDSCAPE / TREE PRESERVATION PLAN L2-1 LANDSCAPE DETAILS Review Date SHEET INDEX License No. Date I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota. Todd W. McLouth - PE 20383 Project Lead Drawn By Checked By Loucks Project No.16430 TWM GAJ TWM 01/10/17 C1-2 ALTA / EXISTING CONDITIONS DETAILS C8-1 10'5' 30' B-B (28' F-F) 15'15' 5'1'1'10' 2.83' HOLD DOWN (SEE INSET A) CONCRETE SIDEWALK EXISTING GROUND/ SUBGRADEEXISTING GROUND/ SUBGRADE CONCRETE CURB & GUTTER 24' B-B (22' F-F) 12'12' SOD W/ 6" TOPSOIL (TYP.) EXISTING GROUND/ SUBGRADE (TYP.) CONCRETE CURB & GUTTER 2.83' HOLD DOWN (SEE INSET A) FINISHED GRADE 2" BIT. WEAR COURSE (SPWEB340C) 2" BIT. NON-WEAR COURSE (SPNWB330C) TACK COAT SUBGRADE FINISHED GRADE 6" SELECT GRANULAR 6" AGG. BASE (CL 5) 24" SELECT GRANULAR SUBGRADE 4" - 6" - 3A32 CONCRETE ALL SIDEWALK SHALL BE 4" THICK EXCEPT AT DRIVEWAYS WHERE IT SHALL BE 6" THICK. SOD W/ 6" TOPSOIL (TYP.) LOUCKS W:\2016\16430\CADD DATA\CIVIL\_dwg Sheet Files\C16430 C8-1 DetailsPlotted: 01 /06 / 2017 3:16 PM7200 Hemlock Lane, Suite 300 Maple Grove, MN 55369 763.424.5505 www.loucksinc.com PLANNING CIVIL ENGINEERING LAND SURVEYING LANDSCAPE ARCHITECTURE ENVIRONMENTAL SUBMITTAL/REVISIONS PROFESSIONAL SIGNATURE QUALITY CONTROL CADD files prepared by the Consultant for this project are instruments of the Consultant professional services for use solely with respect to this project. These CADD files shall not be used on other projects, for additions to this project, or for completion of this project by others without written approval by the Consultant. With the Consultant's approval, others may be permitted to obtain copies of the CADD drawing files for information and reference only. All intentional or unintentional revisions, additions, or deletions to these CADD files shall be made at the full risk of that party making such revisions, additions or deletions and that party shall hold harmless and indemnify the Consultant from any & all responsibilities, claims, and liabilities. CADD QUALIFICATION HARMONY VILLAS ROSEMOUNT, MINNESOTA MARK ELLIOT HOMES MARK PASVOGEL 7741 147th STREET W. APPLE VALLEY, MN 53124 01/10/17 Preliminary Plat Submittal Review Date SHEET INDEX License No. Date I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Landscape Architect under the laws of the State of Minnesota. Gregory A. Johnson - LA Project Lead Drawn By Checked By Loucks Project No. 24610 16430 TWM GAJ TWM 01/10/17 PRELI MI N A R Y C1-1 DEMOLITION PLAN C2-1 C3-1 C3-2 C3-3 C4-1 C8-1 C8-2 SITE PLAN GRADING PLAN SWPPP PLAN SWPPP NOTES UTILITY PLAN DETAILS DETAILS L1-1 LANDSCAPE / TREE PRESERVATION PLAN L2-1 LANDSCAPE DETAILS DETAILS C8-2 LOUCKS W:\2016\16430\CADD DATA\LANDSCAPE\_dwg Sheet Files\L16430 L1-1 Landscape PlanPlotted: 01 /10 / 2017 9:3 AM7200 Hemlock Lane, Suite 300 Maple Grove, MN 55369 763.424.5505 www.loucksinc.com PLANNING CIVIL ENGINEERING LAND SURVEYING LANDSCAPE ARCHITECTURE ENVIRONMENTAL SUBMITTAL/REVISIONS PROFESSIONAL SIGNATURE QUALITY CONTROL CADD files prepared by the Consultant for this project are instruments of the Consultant professional services for use solely with respect to this project. These CADD files shall not be used on other projects, for additions to this project, or for completion of this project by others without written approval by the Consultant. With the Consultant's approval, others may be permitted to obtain copies of the CADD drawing files for information and reference only. All intentional or unintentional revisions, additions, or deletions to these CADD files shall be made at the full risk of that party making such revisions, additions or deletions and that party shall hold harmless and indemnify the Consultant from any & all responsibilities, claims, and liabilities. CADD QUALIFICATION HARMONY VILLAS ROSEMOUNT, MINNESOTA MARK ELLIOT HOMES MARK PASVOGEL 7741 147th STREET W. APPLE VALLEY, MN 53124 01/10/17 Preliminary Plat Submittal Review Date SHEET INDEX License No. Date I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Landscape Architect under the laws of the State of Minnesota. Gregory A. Johnson - LA Project Lead Drawn By Checked By Loucks Project No. 24610 16430 TWM GAJ TWM 01/10/17 PRELI MI N A R Y C1-1 PRELIMINARY PLAT C2-1 C3-1 C3-2 C3-3 C4-1 C8-1 C8-2 SITE PLAN GRADING PLAN SWPPP PLAN SWPPP NOTES UTILITY PLAN DETAILS DETAILS L1-1 LANDSCAPE / TREE PRESERVATION PLAN L2-1 LANDSCAPE DETAILS C1-2 ALTA / EXISTING CONDITIONS GENERAL NOTES CONTRACTOR SHALL VISIT SITE PRIOR TO SUBMITTING BID. HE SHALL INSPECT SITE AND BECOME FAMILIAR WITH EXISTING CONDITIONS RELATING TO THE NATURE AND SCOPE OF WORK. VERIFY LAYOUT AND ANY DIMENSIONS SHOWN AND BRING TO THE ATTENTION OF THE LANDSCAPE ARCHITECT ANY DISCREPANCIES WHICH MAY COMPROMISE THE DESIGN AND/OR INTENT OF THE PROJECT'S LAYOUT. ASSURE COMPLIANCE WITH ALL APPLICABLE CODES AND REGULATIONS GOVERNING THE WORK OR MATERIALS SUPPLIED. CONTRACTOR SHALL PROTECT ALL EXISTING ROADS, CURBS/GUTTERS, TRAILS, TREES, LAWNS AND SITE ELEMENTS DURING PLANTING OPERATIONS. ANY DAMAGE TO SAME SHALL BE REPAIRED AT NO COST TO THE OWNER. CONTRACTOR SHALL VERIFY ALIGNMENT AND LOCATION OF ALL UNDERGROUND AND ABOVE GRADE UTILITIES AND PROVIDE THE NECESSARY PROTECTION FOR SAME BEFORE CONSTRUCTION / MATERIAL INSTALLATION BEGINS (MINIMUM 10' - 0" CLEARANCE). ALL UNDERGROUND UTILITIES SHALL BE LAID SO THAT TRENCHES DO NOT CUT THROUGH ROOT SYSTEMS OF ANY EXISTING TREES TO REMAIN. EXISTING CONTOURS, TRAILS, VEGETATION, CURB/GUTTER AND OTHER EXISTING ELEMENTS BASED UPON INFORMATION SUPPLIED TO LANDSCAPE ARCHITECT BY OTHERS. CONTRACTOR SHALL VERIFY ANY AND ALL DISCREPANCIES PRIOR TO CONSTRUCTION AND NOTIFY LANDSCAPE ARCHITECT OF SAME. THE ALIGNMENT AND GRADES OF THE PROPOSED WALKS, TRAILS AND/OR ROADWAYS ARE SUBJECT TO FIELD ADJUSTMENT REQUIRED TO CONFORM TO LOCALIZED TOPOGRAPHIC CONDITIONS AND TO MINIMIZE TREE REMOVAL AND GRADING. ANY CHANGE IN ALIGNMENT MUST BE APPROVED BY LANDSCAPE ARCHITECT. SOD / TOPSOIL - ALL DISTURBED AREAS SEE NOTES ORNAMENTAL TREE CONIFEROUS SHRUBS - SEE SHEET L2-1 DECIDUOUS SHRUBS - SEE SHEET L2-1 GRASSES / PERENNIALS - SEE SHEET L2-1PROPERTY BOUNDARYNPROPERTY BOUNDARYCONIFEROUS TREE OVERSTORY TREE MINIMUM LANDSCAPE REQUIREMENTS REQUIRED PROPOSED STREET TREES ONE (1) TREE PER 50 LF OF ROAD FRONTAGE ONE (1) TREE PER OPEN SPACE UNIT EXPOSURE 13 TREES 42 OVERSTORY 66 OVERSTORY ONE (1) FOUNDATION PLANTING PER 10 LF OF BUILDING FOUNDATION PLANTINGS PROPERT Y B O U N D A R Y PROPERTY BOUNDARY 4'-0"EXISTING GRADEDRIP EDGE OF TREEP DRIP EDGE OF TREEBRONZE PARKWAY - 623 LF TOTAL FRONTAGE CONNEMARA TRAIL W. - 642 LF TOTAL FRONTAGE 13 TREES 26 CONIFERS 13 TREES 12 TREES QUAD TOWNHOUSE - 121 LF OF BUILDING PERIMETER TWIN ROWHOUSE - 138 LF OF BUILDING PERIMETER 13 SHRUBS 14 SHRUBS 24 SHRUBS 21 SHRUBS TREE PRESERVATION NOTE: (1) EXISTING TREE ON-SITE - TO BE RETAINED AND PROTECTED DURING CONSTRUCTION SEE 1/L1-1 LANDSCAPE / TREE PRESERVATION PLAN L1-1 35 ORNAMENTAL DECIDUOUS TREES TOTAL (OPEN SPACE + STREET TREES) PERCENTAGE OF DECIDUOUS TREES CONIFEROUS TREES 91 - 77% 26 - 23% 1 2 3 4 5 6 7 8 39 42 40 41 35 38 36 37 31 34 32 33 19 18 20 17 15 14 16 13 11 10 12 9 30 29 28 27 26 25 24 23 22 21 LANDSCAPE INSTALLATION COORDINATE THE PHASES OF CONSTRUCTION AND PLANTING INSTALLATION WITH OTHER CONTRACTORS WORKING ON SITE. NO PLANTING WILL BE INSTALLED UNTIL COMPLETE GRADING AND CONSTRUCTION HAS BEEN COMPLETED IN THE IMMEDIATE AREA. WHERE SOD/SEED ABUTS PAVED SURFACES, FINISHED GRADE OF SOD/SEED SHALL BE HELD 1" BELOW SURFACE ELEVATION SOD ALL DESIGNATED AREAS DISTURBED DUE TO GRADING. SOD SHALL BE LAID PARALLEL TO THE CONTOURS AND SHALL HAVE STAGGERED JOINTS. ON SLOPES STEEPER THAN 3:1 OR IN DRAINAGE SWALES, THE SOD SHALL BE STAKED TO THE GROUND. ALL PLANT MATERIAL SHALL COMPLY WITH THE LATEST EDITION OF THE AMERICAN STANDARD FOR NURSERY STOCK, AMERICAN ASSOCIATION OF NURSERYMEN. UNLESS NOTED OTHERWISE, ALL SHRUBS SHALL HAVE AT LEAST 5 CANES AT THE SPECIFIED MINIMUM SHRUB HEIGHT OR WIDTH. ORNAMENTAL TREES SHALL HAVE NO V CROTCHES AND SHALL BEGIN BRANCHING NO LOWER THAN 3' ABOVE ROOT BALL. STREET AND BOULEVARD TREES SHALL BEGIN BRANCHING NO LOWER THAN 5' ABOVE FINISHED GRADE. PLAN TAKES PRECEDENCE OVER PLANT SCHEDULE IF DISCREPANCIES IN QUANTITIES EXIST. SPECIFICATIONS TAKE PRECEDENCE OVER NOTES. NO PLANT MATERIAL SUBSTITUTIONS WILL BE ACCEPTED UNLESS APPROVAL IS REQUESTED OF THE LANDSCAPE ARCHITECT BY THE LANDSCAPE CONTRACTOR PRIOR TO THE SUBMISSION OF A BID AND/OR QUOTATION. ALL PROPOSED PLANTS SHALL BE LOCATED AND STAKED AS SHOWN ON PLAN. ADJUSTMENTS IN LOCATION OF PROPOSED PLANT MATERIALS MAY BE NEEDED IN FIELD. SHOULD AN ADJUSTMENT BE ADVISED, THE LANDSCAPE ARCHITECT MUST BE NOTIFIED. ALL PLANT MATERIALS SHALL BE FERTILIZED UPON INSTALLATION WITH A 27-3-3 SLOW RELEASE FERTILIZER MIXED IN WITH THE PLANTING SOIL PER THE MANUFACTURER'S INSTRUCTIONS. PLANTS MAY BE TREATED FOR SUMMER AND FALL INSTALLATION WITH AN APPLICATION OF GRANULAR 27-3-3 AT 6 OZ PER 2.5" CALIPER PER TREE AND 3 OZ PER SHRUB WITH AN ADDITIONAL APPLICATION OF 27-3-3 THE FOLLOWING SPRING IN THE TREE SAUCER. ALL PLANTING AREAS RECEIVING GROUND COVER, PERENNIALS, ANNUALS, AND/OR VINES SHALL RECEIVE A MINIMUM OF 12" DEPTH OF PLANTING SOIL CONSISTING OF AT LEAST 45 PARTS TOPSOIL, 45 PARTS PEAT OR MANURE AND 10 PARTS SAND. ALL PLANTS TO BE INSTALLED AS PER PLANTING DETAILS. REMOVE ALL FLAGGING AND LABELS FROM PLANTS. WRAPPING MATERIAL SHALL BE CORRUGATED PVC PIPING 1" GREATER IN CALIPER THAN THE TREE BEING PROTECTED OR QUALITY, HEAVY, WATERPROOF CREPE PAPER MANUFACTURED FOR THIS PURPOSE. WRAP ALL DECIDUOUS TREES PLANTED IN THE FALL PRIOR TO 12-1 AND REMOVE ALL WRAPPING AFTER 5-1. BLACK STEEL EDGER TO BE USED TO CONTAIN SHRUBS, PERENNIALS, AND ANNUALS WHERE BED MEETS SOD/SEED UNLESS NOTED OTHERWISE. ALL ANNUAL AND PERENNIAL PLANTING BEDS TO RECEIVE 3" DEEP SHREDDED HARDWOOD MULCH WITH NO WEED BARRIER. ALL SHRUB BED MASSINGS TO RECEIVE 3" DEEP SHREDDED HARDWOOD MULCH AND FIBER MAT WEED BARRIER. ALL TREES TO RECEIVE 4" DEEP SHREDDED HARDWOOD MULCH WITH NO MULCH IN DIRECT CONTACT WITH TREE TRUNK. SPREAD GRANULAR PRE EMERGENT HERBICIDE (PREEN OR EQUAL) PER MANUFACTURER'S RECOMMENDATIONS UNDER ALL MULCHED AREAS. IF THE LANDSCAPE CONTRACTOR IS CONCERNED OR PERCEIVES ANY DEFICIENCIES IN THE PLANT SELECTIONS, SOIL CONDITIONS OR ANY OTHER SITE CONDITION WHICH MIGHT NEGATIVELY AFFECT PLANT ESTABLISHMENT, SURVIVAL OR GUARANTEE, HE MUST BRING THESE DEFICIENCIES TO THE ATTENTION OF THE LANDSCAPE ARCHITECT PRIOR TO PROCUREMENT AND/OR INSTALLATION. CONTRACTOR SHALL SUBMIT A WRITTEN REQUEST FOR THE OWNER ACCEPTANCE INSPECTION OF ALL LANDSCAPE AND SITE IMPROVEMENTS. CONTRACTOR IS RESPONSIBLE FOR ON-GOING MAINTENANCE OF ALL NEWLY INSTALLED MATERIALS UNTIL TIME OF OWNER ACCEPTANCE. ANY ACTS OF VANDALISM OR DAMAGE WHICH MAY OCCUR PRIOR TO OWNER ACCEPTANCE SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. CONTRACTOR SHALL PROVIDE THE OWNER WITH A MAINTENANCE PROGRAM INCLUDING, BUT NOT NECESSARILY LIMITED TO, PRUNING, FERTILIZATION AND DISEASE/PEST CONTROL. CONTRACTOR SHALL GUARANTEE NEW PLANT MATERIAL THROUGH ONE CALENDAR YEAR FROM THE DATE OF OWNER ACCEPTANCE. WARRANTY (ONE FULL GROWING SEASON) FOR LANDSCAPE MATERIALS SHALL BEGIN ON THE DATE OF ACCEPTANCE BY THE LANDSCAPE ARCHITECT AFTER THE COMPLETION OF PLANTING OF ALL LANDSCAPE MATERIALS. NO PARTIAL ACCEPTANCE WILL BE CONSIDERED. UNLESS NOTED OTHERWISE THE APPROPRIATE DATES FOR SPRING PLANT MATERIAL INSTALLATION AND SEED/SOD PLACEMENT IS FROM THE TIME GROUND HAS THAWED TO JUNE 15. FALL SODDING IS GENERALLY ACCEPTABLE FROM AUGUST 15 - NOVEMBER 1. FALL SEEDING FROM AUGUST 15 - SEPTEMBER 15; DORMANT SEEDING IN THE FALL SHALL NOT OCCUR PRIOR TO NOVEMBER 1. FALL CONIFEROUS PLANTING MAY OCCUR FROM AUGUST 15 - OCTOBER 1 AND DECIDUOUS PLANTING FROM THE FIRST FROST UNTIL NOVEMBER 15. PLANTING OUTSIDE THESE DATES IS NOT RECOMMENDED. ANY ADJUSTMENT MUST BE APPROVED IN WRITING BY THE LANDSCAPE ARCHITECT. LANDSCAPE CONTRACTOR SHALL ESTABLISH TO HIS SATISFACTION THAT SOIL AND COMPACTION CONDITIONS ARE ADEQUATE TO ALLOW FOR PROPER DRAINAGE AT AND AROUND THE BUILDING SITE. EDGING LOUCKS W:\2016\16430\CADD DATA\LANDSCAPE\_dwg Sheet Files\L16430 L2-1 Landscape DetailsPlotted: 01 /10 / 2017 9:6 AM7200 Hemlock Lane, Suite 300 Maple Grove, MN 55369 763.424.5505 www.loucksinc.com PLANNING CIVIL ENGINEERING LAND SURVEYING LANDSCAPE ARCHITECTURE ENVIRONMENTAL SUBMITTAL/REVISIONS PROFESSIONAL SIGNATURE QUALITY CONTROL CADD files prepared by the Consultant for this project are instruments of the Consultant professional services for use solely with respect to this project. These CADD files shall not be used on other projects, for additions to this project, or for completion of this project by others without written approval by the Consultant. With the Consultant's approval, others may be permitted to obtain copies of the CADD drawing files for information and reference only. All intentional or unintentional revisions, additions, or deletions to these CADD files shall be made at the full risk of that party making such revisions, additions or deletions and that party shall hold harmless and indemnify the Consultant from any & all responsibilities, claims, and liabilities. CADD QUALIFICATION HARMONY VILLAS ROSEMOUNT, MINNESOTA MARK ELLIOT HOMES MARK PASVOGEL 7741 147th STREET W. APPLE VALLEY, MN 53124 01/10/17 Preliminary Plat Submittal Review Date SHEET INDEX License No. Date I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Landscape Architect under the laws of the State of Minnesota. Gregory A. Johnson - LA Project Lead Drawn By Checked By Loucks Project No. 24610 16430 TWM GAJ TWM 01/10/17 PRELI MI N A R Y C1-1 PRELIMINARY PLAT C2-1 C3-1 C3-2 C3-3 C4-1 C8-1 C8-2 SITE PLAN GRADING PLAN SWPPP PLAN SWPPP NOTES UTILITY PLAN DETAILS DETAILS L1-1 LANDSCAPE / TREE PRESERVATION PLAN L2-1 LANDSCAPE DETAILS C1-2 ALTA / EXISTING CONDITIONS NORTHERN PIN OAK Quercus ellipsoidalis 2-1/2" CAL B.B. 2-1/2" CAL B.B.GL PO GREENSPIRE INDEN PLANT LIST IMPERIAL HONEYLOCUSTIH SIZECOMMON NAME SCIENTIFIC NAMEQTYKEY COMMENTS 2-1/2" CAL B.B. 2-1/2" CAL B.B.COMMON HACKBERRY Celtis occidentalis5CH Tilia cordata 'Greenspire' Gleditsia triacanthos inermis 'Impcole' 14 OVERSTORY TREES SPRING SNOW CRABAPPLE Malus 'Spring Snow'SS ORNAMENTAL TREES PRAIRIE ROSE CRABAPPLE Malus 'Prairie Rose'PF 1-1/2" CAL B.B. 1-1/2" CAL B.B. DWARF EUROPEAN VIBURNUM Diervilla loniceraDV SHRUBS TOR SPIREA Spirea betulifolia 'Tor'TS #5 CONT #5 CONT LITTLE PRINCESS SPIREA Spirea japonica 'Little Princess'LP TECHNITO ARBORVITAE Thuja occidentalis 'Bailjohn' (PP15,850)TN #5 CONT #5 CONT SCANDIA JUNIPER Juniperus sabina 'Scandia'SJ #5 CONT KARL FOERSTER GRASS Calamagrostis aculifloraKF #1 CONT 7 22 11 16 GRASSES / PERENNIALS 258 126 204 282 150 96 SOD / TOPSOIL - ALL DISTURBED AREAS SEE NOTES LANDSCAPE LEGEND ORNAMENTAL TREE - SEE SHEET L1-1 CONIFEROUS SHRUBS DECIDUOUS SHRUBS GRASSES / PERENNIALS AUTUMN FIRE SEDUM Sedum x 'Autumn Fire'AF #1 CONT330 3 DV EDGING 2 TS 5 AF 5 KF 5 LP 5 KF 5 LP 2 TS 5 AF 4 TS 3 TN 2 AD 5 BC 6 TS 3 TN 2 AF 5 DV 4 SJ 10 AF 3 DV 4 TS 8 LP 7 KF 4 TN 4 AD 4 BC 4 TS 3 DV 10 AF 4 SJ 8 LP 7 KF 4 TN 4 AD 4 BC 4 SJ 10 AF 3 DV 4 TS 8 LP 4 TS 3 DV 10 AF 4 SJ 8 LP 4 TN 4 TN 7 KF 7 KF 2-1/2" CAL B.B.AB AUTUMN BLAZE MAPLE Acer x freemannii 'Jeffersred'6 2-1/2" CAL B.B.PM PARKWAY NORWAY MAPLE Acer platanoides 'Parkway Norway'17 2-1/2" CAL B.B.RB RIVER BIRCH CLUMP Betula nigra clump5 IVORY SILK LILAC Syringia reticulata 'Ivory silk'IS 1-1/2" CAL B.B.8 AUSTRIAN PINE Pinus nigraAP CONIFEROUS TREES COLORADO SPRUCE Picea pungensCS 1-1/2" CAL B.B. 1-1/2" CAL B.B.6 10 BLACK HILLS SPRUCE Picea glauca densataBH 1-1/2" CAL B.B.10 BLACK CHOKEBERRY Spirea japonica 'Neon Flash'BC #5 CONT141 ARCTIC FIRE DOGWOOD Cornus stonifera 'Fallow' (PPAF)AD #5 CONT132 LANDSCAPE DETAILS L2-1 IRRIGATION NOTES VERIFY EXISTING/PROPOSED IRRIGATION SYSTEM LAYOUT AND CONFIRM COMPLETE LIMITS OF IRRIGATION PRIOR TO SUPPLYING SHOP DRAWINGS. LANDSCAPE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING AN IRRIGATION LAYOUT PLAN AND SPECIFICATION AS A PART OF THE SCOPE OF WORK WHEN BIDDING. THESE SHALL BE APPROVED BY THE LANDSCAPE ARCHITECT PRIOR TO ORDER AND/OR INSTALLATION. IT SHALL BE THE LANDSCAPE CONTRACTORS RESPONSIBILITY TO INSURE THAT ALL SODDED/SEEDED AND PLANTED AREAS ARE IRRIGATED PROPERLY, INCLUDING THOSE AREAS DIRECTLY AROUND AND ABUTTING BUILDING FOUNDATION. THE LANDSCAPE CONTRACTOR SHALL PROVIDE THE OWNER WITH AN IRRIGATION SCHEDULE APPROPRIATE TO THE PROJECT SITE CONDITIONS AND TO PLANT MATERIAL GROWTH REQUIREMENTS. IRRIGATION SYSTEM IS NOT TO SPRINKLE ACROSS PAVEMENT. THE SYSTEM SHALL INCORPORATE A RAIN SENSOR INTO IRRIGATION SYSTEM. PLANTINGS OUTSIDE THE LIMITS OF IRRIGATION ARE TO BE WATERED REGULARLY UNTIL PLANTING/SOD/SEED HAS BEEN ESTABLISHED. 4" ROCK MULCH OVER GEOTEXTILE (TYP) EDGING MEMORANDUM DATE: February 28, 2017 TO: Kyle Klatt, Senior Planner CC: Kim Lindquist, Community Development Director Stacy Bodsberg, Planning & Personnel Secretary John Morast, Director of Public Works/City Engineer FROM: Mitch Hatcher, Project Engineer RE: Harmony Villas Engineering Review SUBMITTAL: The plans for Harmony Villas have been prepared by Loucks dated January 9, 2017. Engineering review comments were generated from the following documents included in the submittal:  Concept, Master Plan, and Final Development Plan PUD (16 sheets), dated August 30, 2016 ▫ Existing Conditions ▫ Demolition Plan ▫ Site Plan ▫ Preliminary Plat ▫ Erosion Control Plan ▫ Grading and Drainage Plan ▫ Utility Plan ▫ Landscape Plan ▫ Details GENERAL COMMENTS: 1. Development fees are required based on the current Schedule of Rates and Fees. For 2017, the estimated development fees are listed below:  Storm Sewer Trunk Charge: $ 6,865 / acre  Sanitary Sewer Trunk Charge: $ 1,075 / acre  Watermain Trunk Charge: $ 6,500 / acre 2. Prior to submittal of the final plat, the developer should notify the city if they would like to privately install the infrastructure or if a public process is desired. Preparation of the subdivision agreement cannot begin until a public or private process is selected. 3. Street and utility construction shall be installed in accordance with the 2015 City of Rosemount General Specifications and Standard Detail Plates and the Engineering Guidelines. 4. Final construction plans for grading, street, and utilities should be submitted to the City for review. 5. City inspection of street and utility installation is required during construction. 6. Driveway grades should be shown on the plan. 7. Street grades shall be a minimum of 1.0%. Several locations show street grades to be less than 1.0%. 8. Type of concrete curb and gutter should be labeled on the typical sections. 9. A street light plan should be submitted for review. 10. Lot 43 should be designated as an Outlot. 11. Regional ponding for this site is provided in basin 1589. Stormwater Management is reviewed to confirm capacity and rate and volume control in the City’s regional stormwater system. 12. The proposed 12” storm sewer should be 15”. The City’s standards require a minimum of 15”. 13. Additional gate valves should be added at the internal intersections to better isolate water shutoffs. 14. Hydrant spacing and locations should be approved by the City Fire Marshal. 15. The developer is required to obtain a NPDES construction Stormwater Permit and provide a copy of the approved SWPPP to the City prior to the start of any construction activity. 16. The developer is required to obtain a grading permit from the City prior to construction grading activity. 17. Upon completion of the sanitary sewer, watermain, and storm sewer construction, the City requires record drawings. See Engineering Guidelines for submittal and formatting requirements. Should you have any questions or comments regarding the items listed above, please contact me at 651-322-2015.