HomeMy WebLinkAbout6.i. Receive Feasibility Report/Set Public Hearing, 2000 Overlay Improvements City Project #315 � CITY OF ROSEMOUNT
EXECUTIVE SUMMARY FOR ACTION
CITY COUNCIL MEETING DATE: May 16, 2000
AGENDA ITEM: Receive Feasibility Report/Set Public Hearing — AGENDA SECTION:
The 2000 Bituminous Overlay Improvements, City Project Consent
#315
PREPARED BY: Mark Fremder AGENDA NO: / �
Senior Engineering Technician l0� � '
ATTACHMENTS: Resolution, Feasibility Report APPROVED BY:
The City Council ordered the preparation of a Feasibility Report for the 2000 Bituminous Overlay
Improvements, City Project #315 on May 2, 2000. Attached is a copy of the Feasibility Report
and a drawing of the project area.
The proposed improvements include the structural bituminous overlay of the streets of Delft
Avenue, Upper 148t'' Street West and a portion of Upper 145th Street West in Broback 5th and
1 1"' Addition. Two catch basins will be installed to improve surface drainage along Delft
Avenue and a hydrant raised to proper height.
The funding for the project would come from assessments (35% of the total project cost) and
the 2000 Budget. The storm sewer work would come from the Storm Sewer Utility Fund and
the hydrant adjustment from the Water Operating Fund.
Staff recommends approving the attached resolution to receive the Feasibility Report and set a
Public Hearing on June 20,2000.
RECOMMENDED ACTION: MOTION TO ADOPT A RESOLUTON RECEIVING THE FEASIBILITY
REPORT AND SETTING THE PUBLIC HEARING FOR THE 2000 BITUMINOUS OVERLAY
IMPROVEMENTS, CITY PROJECT #315
COUNCIL ACTION:
CIN OF ROSEMOUNT
DAKOTA COUNTY, MINNESOTA �
RESOLUTION 2000-
A RESOLUTION RECEIVING THE FEASIBILITY REPORT AND SETTING THE PUBLIC HEARING
FOR THE 2000 BITUMINOUS OVERLAY IMPROVEMENTS
CIN PROJECT#315
WHEREAS,the City Council deemed it necessary antl expedient that the City of Rosemount, Minnesota, construct
certain improvements,to-wit: City Project#315, 2000 Bituminous Overlay Improvements, in the City as described in
and in accordance with the feasibility report prepared by the City Engineer; and
WHEREAS, the City Council has been advised by the City Engineer that said utility and street improvements, City
Project#315 is feasible, and shoultl best be made as proposed, and the City Engineer's report to this effect has
heretofore been received by Council, and filetl with the City Clerk on May 16, 2000; and
WHEREAS,the statute provitled that no such improvements shall be made until the Council has held a public hearing
on such improvements following mailed notice and two publications thereof in the official newspaper stating time and
place of the hearing,the general nature of the improvement,the estimated costs thereof, and the area proposed to be
assessed, in accordance with the law.
NOW THEREFORE BE IT RESOLVED,the City Council of the City of Rosemount accepts the feasibility report for City
Project#315 and places it on file.
NOW THEREFORE IT BE FURTHER RESOLVED,by the City Council of the City of Rosemount that the public hearing
be scheduled to consider City Project#315,2000 Bituminous Overlay Improvements to be held on Tuesday,June 20,
2000 at 8:00 o'clock p.m. or as soon thereafter as possible, in the Council Chambers of the City Hall.
ADOPTED this 16th day of May, 2000.
Cathy Busho, Mayor
ATTEST:
Linda Jentink, City Clerk
Motion by: Seconded by:
Voted in favor:
Voted against:
FEASIBILITY REPORT
FOR
2000 STRUCTURAL OVERLAY IMPROVEMENTS
CITY PROJECT #315
Prepared by
�
Bret A. Weiss, P.E.
Acting City Engineer
Date: May 9, 2000 Reg. No. 20753
EXECUTIVE SUMMARY
City Project #315 provides for the installation of a structural bituminous overlay on Delft
Avenue, Upper 148�' Street West and Upper 145�' Street West in Broback 5`h and 11�'
Addition in Rosemount. The Project is feasible from an engineering standpoint and can
best be accomplished under one contract. The estimated cost of the project is
approximately $65,430. The funding for the project will come from assessments to
benefited properties and the 2000 Operating Budget. The project can be initiated in
August and completed within a month.
�
INTRODUCTION
The City's Pavement Management System has identified that Delft Avenue, Upper 148�'
Street West and Upper 145�' Street West in Broback 5`� and 11�' Addition require a
structural bituminous overlay at this time. The three streets were initially constructed in
1968 and sealcoated in 1980.
PROPOSEDIMPROVEMENTS
The proposed improvements will include the addition of two storm sewer catch basins with
a lead to an existing catch basin, removal and replacement of bad sections of concrete
curb and gutter, milling of existing pavement, the removal and replacement of bad sections
of pavement and leveling, where required. Next, adjustment of water gate valves and
storm sewer and sanitary sewer manholes will be done. After this work is complete, a 1
�/z" structural bituminous overlay will be installed and compacted. Restoration of any
disturbed areas will be done last.
FINANCING
The estimated cost of the project is approximately $65,430.
The project will be financed by a combination of the 2000 Operating Budget which will
cover 65% of the cost or$39,780, the Storm Water Utility Fund would finance $4,000 and
the Water Operating Fund would finance $200. The remaining 35% will be covered by
assessments to the benefiting properties or$21,431.
It has been determined that there are 48 residential units in the project area, 44 single-
family units and 2 duplexes. Using the "Unit Method", the total estimated cost for
assessments would be approximately $450 per unit.
SCHEDULE
The schedule for the project is as follows
Receive Feasibility Report ................................May 16, 2000
Order Plans & Spec's........................................May 16, 2000
Neighborhood Information Meeting.................May 24, 2000
Public Hearing..................................................June 20, 2000
Approve Project/ Plans 8� Spec's ....................June 20, 2000
Order Ad for Bids .............................................June 20, 2000
Bid Opening ...................................................... July 13, 2000
Bid Award.......................................................... July 18, 2000
Complete Construction.......................................August, 2000
Assessment Hearing........................................October, 2000
z000
- u 45 H T. . STRUCTU RAL
BITUMINOUS
OVERLAY
Project Area
= Nv R
�
Q
�
0
0
Q �
o �
M � W
� > sroback 5th &
p t-- llth ,4ddi ti on
z J J
= W J
� Z
� U
U Q �
J
0
U1 8 H
ST. W. N
City of rzosemount
Engineering Public
works Department
May 9, 2000