HomeMy WebLinkAbout5.b. Dakota County CIP' CITY OF ROSEMOUNT
EXECUTIVE SUMMARY FOR ACTION
CITY COUNCIL MEETING DATE: June 6, 2000
AGENDA ITEM: Dakota County Highway Department CIP
AGENDA SECTION:
2001 -2005
Department Heads Report
PREPARED BY: Dan Fick, City Engineer /Public Works Director
AGEND �
ATTACHMENTS: Letter & CIP from County
APPROVED BY:
Last Years Letter to County
Attached is the 2000 -2004 County CIP, which the County is requesting, comments on so that
they can proceed with putting together the 2001 -2005 CIP. Also attached is the letter that
was sent to the County with City comments on the County CIP last year. The proposed County
CIP provides for improved safety, enhanced infrastructure and responsible fiscal planning and is
therefore, in the opinion of Staff, consistent with the City's mission and vision statements.
Please note that the City has only received this request from the Highway Department and not
the overall County CIP as in years past. Therefore, the following comments are only
concerning the Highway Department CIP.
The projects that affect Rosemount are marked on the attached CIP sheets. The major project,
which most affects Rosemount, is the construction of County Road 46. The County will open
bids for this project in June and will likely begin construction in July.
Other projects listed in the CIP include: 1) Reconstruction of County Road 42 from Diamond
Path to Shannon Parkway (Project No. 42 -88, Year 2001). This project will rebuild CSAH 42
into an urban section and add turn lanes. Rosemount's share of the project cost has been
included in the City's 2001 CIP. 2) Intersection improvements at CSAH 42 /Chippendale
Avenue (Project NO. 42 -87, Year 2001). This project will construct new turn lanes and other
minor improvements and is included in the City's 2001 CIP.
The final project proposed by the County is the reconstruction of Diamond Path (CSAH 33)
from CSAH 42 to 145` Street (Project NO. 33 -06, Year 2004). This project would upgrade
Diamond Path to a 5 -lane urban section. Rosemount's share of the project cost would be
approximately $337,500 and Staff recommends supporting that funding as part of the City's
2004 CIP.
Staff will, if needed, provide an overview of these projects and will request Council to direct
Jtarr t0 sena a letter to t uounty similar t0 l vears letter.
RECOMMENDED ACTION:
COUNCIL ACTION:
11
CITY OF RO S E M O U N T
C145th
2875 West
Rosemount, MN
Everything's Coming Up Rosemount!!
55068 -4997
Phone: 651 - 423 -4411
Hearing Impaired 651 - 423 -6219
Fax: 651A23-5203
June 24, 1999
Deanna Newman, CIP Coordinator
Dakota County Administration Department
1590 West Highway 55
Hastings, Minnesota 55033
Re: F. - sponse to 2000 — 2004 Dakota County C.I.P.
Dear N Is. Newman:
At the June 14, 1999 Rosemount City Council meeting, The Council made the following
recommendations regarding the Dakota County Capital Improvements Program.
1. The Council fully supports the construction of County Road 46.
2. The Council supports the identified improvements to turn lanes and urban section improvements
identified for CSAH 42.
3. The Council supports the coordination with the city, county, and state for the interchange
improvements at CSAH 42 and Highway 52.
4. The City Council continues to be very supportive of Spring Lake Park and the acquisition of
additional land and the proposed improvements.
For a number of years the City Council has requested and continues to fully support a library be
constructed within the City of Rosemount and that this request be added to the Capital
Improvements Program.
6. City Council would recommend that the County address safety concerns on CSAH 42 and
Highway 55 as relates to the turn lanes due to unsafe traffic conditions which would include
cooperation with the State.
Thank you for your continued support of City involvement with the Capital Improvements Program.
Please call me at (651) 322 -2006 if you have any further questions on the City ofRosemount's requests.
Sincerely,
Thomas D. Burt
City Administrator
CC: Mayor and City Council
Brandt Richardson, County Administrator
i
Brandt Richardson April 10, 2000
County Administrator
Dakota County
Administration Center
1590 Highway 55
Mr. Tom Burt
Hastings, MN 55033 -2372
City Administrator -City of Rosemount
651.438.4528
2875 145th Street West
Fax 651.438.4405
Rosemount, MN 55068
wwwco.dakota.mn.us
brandt-richardson@co.dakota.mn.us
Dear Mr. Burt:
Dakota County is updating its annual Capital Improvement Program (CIP) and is
seeking your input. We would appreciate any suggestions concerning changes or
modifications that you would like to see us incorporate in the County's 2001 -2005
Capital Improvement Program. A copy of the 2000 -2004 adopted CIP summary is
attached.
Please submit formal comments from your city or town board to Ken Harrington, Dakota
County Administration, 1590 Highway 55, Hastings, MN 55033 -2372 by June 30, 2000.
Copy Lezlie Vermillion, Dakota County Highway Department, at the Dakota County
Western Service Center, 14955 Galaxy Ave., Apple Valley, MN. 55124 -8579 regarding
comments on the Highway CIP.
For further information call the following individuals:
Highway Projects
Parks Projects
Intermodal Projects
Building Projects
CIP Coordinator
Lezlie Vermillion
Steve Sullivan
Lynn Moratzka
Ken Harrington
Deanna Newman
(612) 891 -7104
(651) 438 -4660
(612) 891 -7033
(651) 438 -4542
(651) 438 -8137
Thank you for your time and consideration.
Sincerely,
t
Brandt Richardson
County Administrator
RECEIVED
Attachment
Cc: Deanna Newman
Ken Harrington
Lynn Moratzka
Steve Sullivan
Lezlie Vermillion
ANK , , 2000
CITY OF ROSEMOUNT
0
=—d �rd•d wvv
Aft EOL I CFFCKr f} [NLOYEA
,
• i' i 4 _ 'tip • -
e .A
R �xn
{
`�.
/
HIGHWAY CAPITAL IMPROVEMENT
PRORAM
j
YEAR 2000
PAGE -
PROJECT
ROAD
SEGMENT(FROM/TO)
PROJECT
TOTAL
CITY
FEDERAU
COUNTY
COUNTY
NO.
DESCRIPTION
COST
SHARE
STATE
STATE AID
COST
BALANCES DECEMBER 31, 1999
($1,000,000)
$19,000,000
2000 ALLOTMENTS AND TAX LEVY
$3,700,000
$5,504,089
INTERMODAL TRANSFER
$130,000
EXPANSION PROJECTS
HA6
9 -27
CSAH 9
CSAH 50 -195TH ST.
4 -LANE DIVIDED
$2,000,000
$900,000
$0
$0
$1,100,000
LAKEVILLE
H -17
23 -43
CSAH 23
CSAH 9 - LAKEVILLE SO. CITY LIMITS
4 -LANE DIVIDED
$13,000,000
$2,655,000
$7,100,000
$1,450,000
$1,795,000 C
LAKEVILLE
INCLUDES TEA 21 FUNDS OF $5.1 MIL
($500,000 TO AV TRANSIT HUB IN 1998)
H -18
32.28
CSAH 32
CHES MAR - CR 43
4 -LANE DIVIDED
$2,500,000
$1,250,000
$0
$1,250,000
$0
EAGAN
STATE TURNBACK FUNDS
4djjjoNA"7
CSAH 46
1/4 MILE EASTCSAH 31 - E. TH 52
2 -4 LANE CONST.
$12,250,000
•$1,687,500. _
$8,500,000
L0
$2,062,500 C
A.V., RSMT, LAKE, COATES
INCLUDES TEA 21 FUNDS AND
$2 MIL FROM MNDOT FOR REALIGN OF TH 3
(I py l pov
H -20
46 -14
CR 46
114 MILE W - 1/4 MILE E CSAH,31
4 -LANE DIVIDED /PHASE 2
$1,000,000
$180,000
$750,000
$70.000
APPLE VALLEY, LAKEVILLE
INCLUDES TEA 21 FUNDS
SUBTOTAL
$30 :750'.000>
$6,492,500
$15,600,000
$2,700,000
$4,957,500
MANAGEMENT
PROJECTS
H -21
5 -32
CSAH 5
AT 143RD STREET
TURNLANES
$180,000
$81,000
$0
$0
$99,000
BURNSVILLE
H -22
5 -34
CSAH 5
AT 143RD STREET
SIGNAUINTERCONNECT
$170,000
$85,000
$0
$0
$85,000 C
BURNSVILLE
H -23
11 -12
CR 11
AT 122ND STREET
TURNLANES
$250,000
$112,500
$0
$0
$137,500
BURNSVILLE
H -24
11 -17
CR 11
AT 122ND STREET
SIGNAL
$140,000
$70,000
$0
$0
$70,000
BURNSVILLE
H -25
14 -12
CSAH 14
TH 110 - TH 52
3 LANE RECONST. •'
$5,000,000
$2,300,000
$400,000
$0
$2,150,000 C
I.G.H.,SO. &W ST.PAUL
$150,000 GV
H -26
26 -34
CSAH 26
AT BLAINE AVE.
SIGNAL
$160,000
$80,000
$0
$0
$80,000
INVER GROVE HEIGHTS
H -27
26 -35
CSAH 26
AT BLAINE AVE.
TURNLANE
$50,000
$22,500
$0
$27,500
INVER GROVE HEIGHTS
H -28
28 -25
CR 28
AT CAHILL
INTERSECTION
$780,000
$430,000
$0
$0
$350,000
INVER GROVE HEIGHTS
H -29
28 -27
CR 28
AT TH 13
INTERSECTION
$30,000
$0
$0
.$0
$30,000
EAGAN
H -30
42 -89
CSAH 42
AT PORTLAND AVE.
INTERSECTION
$210,000
$150,000
$0
$0
$60,000
BURNSVILLE
H -31
43 -20
CR 43
MEN. HGHTS. RD - THUMB TRAIL
TRAIL/RIGHT OF WAY ACQ.
$420,000
$189,000
$0
$0
$231,000
MENDOTA HEIGHTS
( INTERMODAL FUNDS)
H -32
43 -16
CR 43
AT DUCKWOOD TRAIL
SIGNAL
$150,000
$75,000
$0
$0
$75,000
EAGAN
H -33
31 -50
CSAH 31
At CSAH 50
SIGNAL
$150,000
$75,000
.$o
$0
$75,000
FARMINGTON
C= Carryover
GV- Gravel Tax
J �v
a
HIGHWAY CAPITAL IMPROVEMENT PRORAM
YEAR 2001
PAGE PROJECT ROAD SEGMENT(FROM/TO)
NO,
PROJECT
DESCRIPTION
TOTAL CITY FEDERAU COUNTY
COST SHARE STATE STATE AID
COUNTY
COST
BALANCES DECEMBER 31, 2000
26 -29
CSAH 26
CAHILL AVE. - TH 56
2001 ALLOTMENTS AND TAX LEVY
$2 100 000
$0
$4,336,419
INTERMODAL TRANSFER
31 -44
$3,700,000
$5,724,253
SUBTOTAL
240 000
EXPANSION PROJECTS
$2,000,000
CSAH 42
CHIPPENDALE INTERSECTION
H -68 31 -38 CSAH 31 1/8 M. N. CR 46 - 1/8 M.N. CR 58
4 -LANE DIVIDED /TRANSIT STATION
$3,750,000 $1,875,000
ROSEMOUNT
LAKEVILLE, APPLE VALLEY
TEA 21 FUNDING PENDING
$0 $1,635,000
$240,000
H -69 31 -47 CSAH 31 1/8 M.S. CSAH 42 - 1/8 M.N. CR 46
APPLE VALLEY
H -62 56 -03 CSAH 56 1 -494 - 90TH STREET
IGH, SO. ST PAUL
MANAGEMENT
PROJECTS
$0
$2,000,000
H -70
26 -29
CSAH 26
CAHILL AVE. - TH 56
$0
$2 100 000
INVER GROVE HEIGHTS
H -71
31 -44
CSAH 31
CR 28 - DUCKWOOD DR
SUBTOTAL
EAGAN
$3,015,000
$2,000,000
CSAH 42
CHIPPENDALE INTERSECTION
ROSEMOUNT
RECONSTRUCTION
$2,500,000
$1,125,000
$0
$925,000
$450,000
CSAH 42
`'CSAH 33 - SHANNON PARKWAY
$70,000
$560,000
$0
rOSEMOUNT
H -74
43 -17
CR 43
0.25 S CR 28 - 0.25 S. CSAH 26
INTERSECTION IMPROVMENTS
EAGAN
H -75
60 -10
CSAH 60
1 -35 INTERCHANGE
TURNLANES /URBAN SECTION
$1,000,000
$450,000
LAKEVILLE
H -61
50 -05
CSAH 50
DIV. ST. TO TH 3
$1,125,000
$0
$0
FARMINGTON
H -36
UNSPECIFIED
SIGNAL PROJECTS
PRESERVATION PROJECTS
H -37 PRESERVATION AND MANAGEMENT PROJECTS
H -38 UNSPECIFIED STRIPING PROJECTS
GV =Gravel Tax
INTERMODAL FUNDS
4 -LANE DIVIDED $2,280,000 $1,140,000 $0 $1,140,000 S0
TEA 21 FUNDING PENDING
TURNBACK IMPROVMENTS
$2,000,000
$0
$2,000,000
$2,000,000
$100,000
$0
STATE TURNBACK FUNDS
$0
$0
$2 100 000
SUBTOTAL
$8,030,000
$3,015,000
$2,000,000
$2
_--J,240000
RECONSTRUCTION
$2,500,000
$1,125,000
$0
$925,000
$450,000
\ TURNLANES/WIDENING
$700,000
$70,000
$560,000
$0
$70,000
INCLUDES TEA 21 FUNDING
INTERSECTION IMPROVMENTS
$200,000
$100,000
$0
$0
$100,000
TURNLANES /URBAN SECTION
$1,000,000
$450,000
$0
$0
$550,000
4 -LANE DIVIDED
$2,500,000
$1,125,000
$0
$0
$1,225,000
$150,000 GV
RAMPS AT 1 -35
$2,381,000
$1,071,000
$0
$0
$1,310,000
3 -LANE RECONST. $1,640,000 $500,000 $1,065,000 $0 $75,000
STATE TURNBACK FUNDS
$470,000 $225,000 $0 10 $245,000
SUBTOTAL $11 391 000 $4,666000 $1 625 $925
$4,175,000
$2,000,000
$100,000
$0
$0
$0
$0
$0
10
$2,000,000
$100,000
SUBTOTAL $2,100,000
$0
$0
$0
$2 100 000
HIGHWAY CAPITAL IMPROVEMENT PRORAM
YEAR 2004
PAGE PROJECT ROAD SEGMENT(FROMITO) PROJECT TOTAL CITY FEDERAL/ COUNTY COUNTY
NO. DESCRIPTION COST SHARE STATE STATE AID COST
B=ALANCES DECEMBER 31, 2003 $70,000 ($8,493,953)
2004 ALLOTMENTS AND TAX LEVY $3,700,000 $6,439,006
EXPANSION PROJECTS
-1 -99 32 -30 CSAH 32 CSAH 71 - TH 52
INVER GROVE HEIGHTS
CSAH 42 -145TH ST.
A.V., ROSEMOUNT
H -101 50 -10 CSAH 50 1 -35 INTERCHANGE
LAKEVILLE
MANAGEMENT PROJECTS
H -35 UNSPECIFIED SIGNAL PROJECTS
PRESERVATION PROJECTS
H -37 PRESERVATION AND MANAGEMENT PROJECTS
H -38 UNSPECIFIED STRIPING PROJECTS
BRIDGE REPLACEMENTS
H -102 WATERFOR REPLACE #L -3275
SYSTEM PROJECTS
H -55 TURNBACKS
H -57 CORRIDOR PRESERVATION AND SAFETY PROJECTS
ENGINEERING /OPERATIONAL
H -64 CIP REIMBURSEMENT TO ENGINEERING -OPER EXP
H -65 RIGHT OF WAY APPRAISALS
H -66 ATTORNEY REIMBURSEMENT
H -67 TOWNSHIP DISTRIBUTION
2004 TOTAL CONSTRUCTION
BALANCES DECEMBER 31, 2004
VE YEAR TOTAL CONSTRUCTION
vc
CONST. 2 LANE $4,000,000 $2,000,000 (/ A� $0 $1,850,000 $150;000 GV
v
CONST. 5 LANE $1,500,000 $675,000 �. $0 $825,000 $0
Z
INTERCHANGE IMPROVEMENT $5,930,000 $2,668,000 $0 $1,025.000 $2,237,000
TEA 21 FUNDING PENDING
SUBJECT TO STATE OR FEDERAL FUNDS
SUBTOTAL $11,430,000 $5,343,000 $0 $3,700,000 $2,387,000
$470,000 $225 $0 $0 $245,000
$2,500,000
$0
$0
$0
$2,500,000
$100,000
$0
$0
$Q
$100,000
SUBTOTAL $2,600,000
$0
$0
$0
$2,600,000
BRIDGE REPLACMENT $450,000 $10,000 $440,000 $0 $0
$100,000
$0
$0
$0
$100,000
$800,000
$0
$0
10
$800,000
SUBTOTAL $900,000
$0
$0
$0
$900,000
$450,000
$0
$0
$0
$450,000
$150,000
$0
$0
$0
$150,000
$50,000
$0
$0
$0
$50,000
$20,900
$0
$0
$0
$20,900
SUBTOTAL $670,900
$0
$0
$0
$670,900
$16,520,900 $5,353,225 $440,000 $3,700,000 $6
$70,000 ($8,857,847)
$138,2020 $35,666,725 $32,219,250 $17,362 $58,159,770