HomeMy WebLinkAbout6.g. Payment #6 and Final, Wensmann 12th Addition, Street and Utility Construction, City Project #287F CITY OF ROSEMOUNT EXECUTIVE SUMMARY FOR ACTION CITY COUNCIL MEETING DATE: December 19th, 2000 AGENDA ITEM: Payment #6 and Final, for Wensmann 1r Addition Street and Utility Construction, City Project # 287 AGENDA SECTION: Consent PREPARED BY: Rich Lonnquist, Senior Engineering Technician AGENDA NO: , 16 % 0 ATTACHMENTS: Payment Voucher #6 and Final APPROVED BY: This item is for the Oh and Final payment to Ryan Construction Co. in the amount of $32,968.96 for City project # 287, Wensmann 12" Addition Street and Utility Construction. The original contract amount was $379,349.67. The total construction cost, including the final payment is $384,247.73. Work completed and represented in this payment as of December 5' 2000 is 100% of the contracted work. The work has been inspected and is in compliance with the contract documents. Attached is a copy of the Construction Pay Voucher # 6 and Final for your information. Staff and WSB recommend approval of this final payment request and acceptance of the streets and utilities for perpetual maintenance. Upon final payment, a two -year warranty period will begin on the streets and utilities. RECOMMENDED ACTION: Motion to Approve payment #6 and Final to Ryan Construction Co. in the amount of $32,968.96 for Wensmann 12' Addition Street and Utility Construction City Project # 287. COUNCIL ACTION: t r Voucher No. 6 (FINAL) Date: December 5, 2000 WSB Project No: 1067.51 Period Ending: November 30, 2000 Project: Project Location: Contractor. Wensmann 12th Addition Street & Utility Construction City of Rosemount Project No. 287 Ryan Contracting Co. 870013th Ave East Shakopee, MN 55379 Contract Date: July 30,1999 Completion Date: Work Started: Work Completed: Original Contract Amount $379,349.67 Total Additions $3,960.00 Total Deductions $0.00 Total Funds Encumbered $383,309.67 Total Work Certified to Date $384,247.73 Less Retained Percentage 0.00% $0.00 Less Previous Payments $351 ,278.78 Total Payments Ind. -This Voucher $384,247.73 Balance Carried Forward ($938.07) Approved for Payment This Voucher 132,968.96 Approvals WSB & Associates, Inc. In accordance with field observation, as performed in accordance with industry standards, and based on our professional opinion, the materials installed are satisfactory and the work properly performed in accordance with the plans and specifications. The total work estimated to be completed as of November 30, 2000 is as indicated herein and we hereby recommend payment of this voucher. [�ooi. Signed: Signed: Construction Observer Project Manager /Engineer Ryan Contracting Co. This is to certify that to the best of my knowledge, information, and belief, the quantities d v lues o ork certified herein is a fair adRW#; j0lRAJ9 TWA ff Fred by this voucher. 8700 13th Ave. E. Contractor. Shakopee, MN 55379 Signed: Date: /0-7-00 Title: Date: /L — 7-0(J Title: City of Rosemount Checked by: Approved for Payment: Authorized Representative Date: Date: