HomeMy WebLinkAbout9.b. Receive Bids/Award Contract East Side Water Tower, City Project #302i
CITY OF ROSEMOUNT
EXECUTIVE SUMMARY FOR ACTION
CITY COUNCIL MEETING DATE: June 20, 2000
AGENDA ITEM: Receive Bids /Award Contract -East Side
AGENDA SECTION:
Water Tower, City Project #302
NEW BUSINESS
PREPARED BY: Dan Fick, City Engineer /Public Works Director
AGEND 9
ATTACHMENTS: Resolution, Bonestroo Letter dated June 1,
APPROVED BY:
2000 with Bid Tabulation
-T A---
On May 31, 2000 the City received bids for the East Side Water Tower, City Project #302.
Two styles and several "add -ons" were specified as bid alternates. The results of the bidding
are summarized in the attached letter from Bonestroo.
At the June 12, 2000 Utility Commission meeting, a motion was made and passed
recommending Council award the bid to CB & I (water spheroid style, plus all "add -ons ") in the
amount of $793,064.
The East Side Water Tower, in the opinion of Staff, works toward the goal of business growth
on the east side of Rosemount as well as providing for sound fixed management of the water
distribution system. Staff feels, therefore, that this project is in keeping with the city's vision
and mission statements and goals.
Staff_ recommends award of the contract to CB & I Constructors in the amount of $793,064.
RECOMMENDED ACTION: MOTION TO ADOPT A RESOLUTION RECEIVING BIDS AND
AWARDING THE CONTRACT FOR THE EAST SIDE WATER TOWER, CITY PROJECT #302.
COUNCIL ACTION:
CITY OF ROSEMOUNT
DAKOTA COUNTY, MINNESOTA
RESOLUTION 2000
A RESOLUTION RECEIVING BIDS AND AWARDING CONTRACT
FOR EAST SIDE WATER TOWER
CITY PROJECT #302
BE IT RESOLVED, by the City Council of the City of Rosemount, Minnesota, as follows:
1. All bids on construction of the East Side Water Tower are hereby received and
tabulated.
2. The bid of CB & I Constructors, in the amount of $793,064 for the
construction of said improvements along with all alternates in accordance with
the plans and specifications and advertisement for bids is the lowest
responsible bid and shall be and hereby is accepted.
3. The Mayor sand Clerk are hereby authorized and directed to enter into a
contract with said bidder for the construction of said improvements and all
alternates for and on behalf of the City of Rosemount.
4. The City Clerk is hereby authorized and directed to return forthwith to all
bidders the deposits made with their bids, except that the deposit of all
successful bidder and the next two lowest bidders shall be retained until a
contract has been executed.
ADOPTED this 20th day of June, 2000.
Cathy Busho, Mayor
..ATTEST:
Linda Jentink, City Clerk
Motion by: Seconded by:
Voted in favor:
Voted against:
Bonestroo, Rosen*, Anderlik and Associates. Inc. 1s an Affirmative Action /Equal Oppo. uxft •
Bo nestroo Employer and Employee Owned
EzM R n Principals: Otto M Bonestroo, P.E. - Marvin 1_ Sorvala. P.E. - Glem R. Cook. P.E.
osene Robert M Schunicht. P.E. • Jerry A. Bourdon. P.E.
A nderiik & Senior Consultants: Robert W. Rosen. RE - Joseph C Andertik. PE - Richard E Turner. RE
�
1. Susan M. Eberlin, C.P.A.
Associates `es Associate Principals: Howard A. Sanford. RE - Keith A. Gordon, RE- Robert R. Pfefferle. RE
Richard W. Foster. RE. - David O. Loskota. PE • Robert C. Russek. AJA -Mark A. Hanson. P.E.
Eng ineers at Architects Michael T. Rautmann. PE, - Ted K.Fieid PE - Kenneth P. Anderson. PE - dark R. Rolls. P.E. -
9 David A. Bonstroo. M.B.A. - Sidney P. Williamson, P.E. L.S. Acpxs LL mss. MEA. • Allan Rick SdwAdr. PE
Offices: St. Paul. St. Cloud. Rochester and Willmar, MN • Milwaukee. it
J une 1, 2000 wtbsite: wwwbonestroo.com
Honorable Mayor and City Council
City of Rosemount
2875 145th St W
PO Box 510
Rosemount, MN 55068 -0510
Re: City of Rosemount
500,000 Gallon Elevated Tank
BRA File No. 424 -99 -101
Honorable Mayor and City Council: .
Bids were opened for the project stated above on May 31, 2000, 10:00 AM. Transmitted herewith are ten
(10) copies of the bid tabulation for your information and file. Copies will also be distributed to each
bidder.
Two styles of elevated tanks were bid, a hydropillar (the style of the City's Connemara tank) and a water
spheroid. The project documents allow the City to award either style of tank and also to accept or reject
any of the bid alternates. The lowest bids for each style of tank and the engineer's estimate are tabulated
below. Pitt Des Moines, Inc. (PDM) had the lowest bid for the hydropillar in the amount of $864,750.00
The low bid for the spheroid style was Chicago Bridge & Iron Company (CB &n in the amount of
$770,964.00.
Hydropillar
- PDM Spheroid - CB &I
Bid Item Eng Est
Bid Amt Eng_Est Bid Amt
Elevated Tank $720,000
$746,580 $690,000 $657,000
Site Work $125,581
S118,170 S125,581 S113,964
Total Base Bid $845,581
$864,750 $815,581 $770,964
Alt 1- Condensate Ceiling $12,000
$ 6,000
Alt 2 -10' x 12'. Overhead Door $15,000
$10,400
Alt 3 - Add (2) City Logos $ 8,000
$ 4,000 $ 2,500
Alt 4 - Concrete Floor $ 5,000
$ 4,000
Alt 5 - Concrete Floor
$ 5,000 $ 4,000
Alt 6 - 2" Bit. Base Course $ 6,500
$ 7,800 $ 6,500 $ 7,800
- 2" Bit. Wear Course $ 6.500
S 7,800 500 $ 7,800
Base Bid Plus Alternates $898,581
$904,750 $833,581 $793,064
The alternates for each tank style are listed below the Total Base Bid amount. Alternates 1, 2, and 4 for
the hydropillar would allow the City to use the area within the base of the tank for storage of equipment
and materials. The total of these three items is $20,400. Because of the cone shaped based of the
spheroid style, a large overhead door and condensate ceiling would not be provided. If items are to be
stored in the tank, a concrete floor should be selected under Alternate 5 at a cost of $4,000:
t:W24W24"101\word\Bidders tastkiieatbidtablt'rdoc
9 »te sv/ �• Lttw4--uw 2L m C* Pmni AAFJ CC112 m LC1- L2L -ALAn . C-w- LCUL2L -1211
Bonesttoo r
ttt� RO Sene Project Name: 500,000 Gallon Elevated Tank I hereby car* that this is an exact
Anderilk & Project No.: File No.: 424 =99 -101 re
Associates � p J � ro ' ducrron oftuars
Ergineen & Architeds Bid Opening: May 31, 2000 at 10:00 am Owner. City of Rosemount � .�.�.�✓
' - Rkhard W foster, P.E.
Registration No. 11609
Bidder No.1 Bidder No. 2 Bidder No. 3 Bidder No. 4
C 8 & 1 Constructor Pitt Des Moines Inc Caldwell Tanks Inc Maguire Iron Inc
Item
Nurn
Item
Units
city
Unit Price
Total
Unit Price
Total
Unit Price
Total
Unit Price
Total
Bid A - 500,000 Fluted Column or
Hydroplilar Water Tower 130.0 feet to
1
Fumish and Install a complete elevated
water storage tank of the fluted column or
LS
1
No Bid
No Bid
$746,580.00
$746,580.00
$825,640.00
$825,640.00
No Bid
No Bid
Total Bid A - 500,000 Fluted Column or
Hydropillar Water Tower 130.0 feet to High
No Bid
$746,580.00
$825,640.00
No Bid
Bid 8.800,000 Water Spheroid or
Pedestal Spheroid Water Tower 130.0
2
Furnish and Install a complete elevated
water storage tank of the fluted column or
LS
1
$657,000.00
$657,000.00
$693,230.00
$893,230.00
$704,340.00
$704,340.00
$786,541.00
$786,541.00
Total Bb 8 - 500,000 Water Spheroid or
Pedestal Spheroid Water Tower 130.0 feet
$657,000.00
$693,230.00
$704,340.00
$786,541.00
Part 1 - Site Work
3
Salvage and reuse existing topsoil
LS
1
$1,600.00
$1,600.00
$1,750.00
$1,750.00
$1,540.00
$1,540.00
$2,000.00
$2,000.00
4
Subgrade preparation
SY
900
$5.39
$4,851.00
$5.50
$4,950.00
$5.50
$4,950.00
$5.34
$4,806.00
5
Aggregate base, Class S. 100% crushed
TN
700
$13.00
$9,100.00
$13.00
$9,100.00
$13.00
$9,100.00
$14.00
$9,800.00
6
4'x 8' overflow splash pad
LS
1
$200.00
$200.00
$200.00
$200.00
$200.00
$200.00
$400.00
$400.00
7
Connect to existing 16' water main
EA
1
$550.00
$550.00
$600.00
$600.00
$550.00
$550.00
$600.00
$600.00
8
Remove and reinstall hydrant, 6" GV, 6"
DIP and 8" x 18" reducer
LS
1
$700.00
$700.00
$750.00
$750.00
$700.00
$700.00
$800.00
$800.00
9
16" gate valve and box. In place
EA
3
$3,967.00
$11,901.00
$4,000.00
$12,000.00
$4,000.00
$12,000.00
$4,000.00
$12,000.00
10
6" hydrant
EA
1
$1,500.00
$1,500.00
$1,750.00
$1,750.00
$1,500,00
$1,500.00
$1,900,00
$1,900.00
11
6' gate vat" and box
EA
1
$600.00
$600.00
$600.00
$600.00
$800.00
$600.00
$600.00
$600.00
12
6" water main - ductile Iron, Class 52
LF
5
$30.00
$150.00
$30.00
$150.00
$30.00
$150.00
$25.00
$125,00
13
16" water main - ductile Iron. Class 52
LF
1260
$48,00
$80,480.00
$50.00
$63,000.00
$50.00
$83,000.00
$50.00
$63,000.00
14
18" water main - ductile Iron. Class 52
LF
36
$69.50
$2,502.00
$70.00
$2,520.00
$70.00
$2,520.00
$68.00
$2,448.00
15
18" CMP flared end section
EA
2
$100.00
$200.00
$100.00
$200.00
$100.00
$200.00
$100.00
$200.00
16
18" CMP culvert, 18 gauge
LF
30
$25.00
$750.00
$25.00
$750.00
$25.00
$750.00
$30,00
$900.00
17
Ductile Iron tM6ngs
LB
5100
$2.00
$10,200.00
$2.00
$10,200.00
$2.00
$10,200.00
$2.00
$10,200.00
18
Nay bales
LF
100
$5.00
$500.00
$5.00
$500.00.
$5.00
$500.00
$5.00
$500.00
19
Silt fence, regular
LF
2300
$2.00
$4,600.00
$2.50
$5,750.00
$2.00
$4,600.00
$2.00
$4,600.00
20
Seeding - MnDOT 3876, Mixture 700
AC
0.2
$2,000.00
$400.00
$2,000.00
$400.00
$2,000.00
$400.00
$2,000.00
$400.00
21
Seeding - MnDOT 3876, Mixture 700 with
wood fiber blanket
BY
1800
$1.10
$1,980.00
$1.00
$1,800.00
$1.00
$1,800.00
$1.10
$1,980.00
22
Topsoil supplement MnDOT 3877A
CY
100
$12.00
$1,200.00
$12.00
$1,200.00
$12.00.
$1,200.00
$2.00
$200.00
Total Part 1- Site Work:
$113,984.00
$118,170.00
$116,460.00
$117,459.00
Total Bid A with Part 1
$0.00
$864.750.00
$942,100.00
$0.00
Total Bid B with Part 1
$770,954.00
$811,400.00
$820,800.00
$904,000.00
BidTab
BT -1
Bidder No. t
Bidder No. 2
Bidder No. 3
Bidder No. 4
C B & I Constructors
Pitt Des Molnes Inc
Caldwell Tanks Inc
Maguire Iron Inc
Item
Num
Item Units
oty
Unit Price
Total
Unit Price
Total
Unit Price
Total
Unit Pr
To tal
Alternate No. 1- All Bidders completing
Bid A shall bid this Item.
23
Fumish and Install a complete condensate
calling with drain pipe as shown and
specified In Section 13,212 for the LUMP
SUM of LS
Total Alternate No. 1- AN Bidden
1
No Bid
No Bid
$8,000.00
$8,000.00
$12,000.00
$12,000.00
No Bid
No Bid
completing Bid A shall bid this Rem.:
No Bid
$6,000.00
$12,000.00
-
No Bid
Alternate No. 2 - All Bidden completing
Bid A shall bid this Item.
24
Furnish and Install 10'-0' x I r -0' garage
door In addition to the specified W-W x T4'
pedestrian door which shall Include the
addition of an 8' concrete apron as shown
and specified In Section 13.212 for the
LUMP SUM Of
Total Alternate No. 2 • All Bidden
1
No BM
No Bid
$10,400.00
$10,400.00
$8,000.00
$8,000.00
No Bid
No Bid
completing Bid A shaft bid this Nam.:
No Bid
$10,400.00
$8,000.00
No Bid
Alternate No. B - All Bidden completing
Bid A or Bid B shall bid this Item.
25
Palen on two (2) City Logos as shown on
the scheme figure and as specified in
Section 09900 for the LUMP SUM of
Total Alternate No. 3 - AN Bidden
1
$2.500.00
$2,500.00
$4,000.00
$4.000.00
$8,000.00
$8,000.00
$9.000.00
$9.000.00
completing Bid A or Bid 8 shall bid this
Item.:
$2.500.00
$4,000.00
$6,000.00
$9,000.00
Alternate No. 4 - All Bidden completing
Bid A shall bid this Item
28
Furnish and Install a 8' thick reinforced
concrete floor stab on a 8' thick Class 5
BOOM" base In lieu of the t r thick dear
rock base as shown and specified for the
LUMP SUM Of LS
Total Alternate No. 4 - AN Bidden
1
No Bid
No Bid
$4,000.00
$4,000.00
$4,000.00
$4,000.00
No Bid
No Bid
completing Bid A shall bid this Item.:
No Bid
$4.000.00
$4,000.00
No Bid
Alternate No. 5 - All Bidders completing
Bid B shall bid this Item.
27
Furnish and Install a 8' thick reinforced
concrete floor slab on a 8' thick Class 8
aggregate base in lieu of the 12* thick dear
rock base as shown and specified for the
LUMP SUM Of LS
Total Alternate No. 5 - AN Bidden
1
$4,000.00
$4.000.00
$4,000.00
$4,000.00
$4:000.00
$4,000.00
$4.500.00
$4.500.00
completing Bid B shall bid this Item.:
$4,000.00
$4
$4,000.00
$4.500.00
BldTab BT -2
C
Bidder No.1 Bidder No. 2 Bidder No. 3 Bidder No. 4
C B & 1 Constructors Pitt Des Moines Inc Caldwell Tanks Inc Maguire Iron Inc
Item
—Nu Item Units
Unit Price Total
Unit Price Total
Unit Price Total
U nit Price Total
Alternate No. 6 -All Bidders completing
Bid A & Bid B shall bid on this Item.
28 2' bituminous wow TN 130
29 2 bkumkwus base TN
$60.00 $7.800.00
$60.00 $7,800.00
$70.00 $9,100.00
$65.00 $8,450.00
130
Total Alternate No. 6 -
$60.00 $7.800.00
$15,600.00
$60.00 $7,800.00
$15,600.00
$70.00 $9,100.00
$65.00 $8,450.00
$18.200.00
$16.900.00
Contractor Name and Address:
C B & 1 Constrictors
Pitt Des Moines Inc
Caldwell Tanks Inc
Maguire Iron Inc
601 W 143rd St
9550 Hackman Rd
4000 Tower Rd
Box 1446
Plainfield, IL 60544
Clive, IA 50325
Louisville, KY 40219
Sioux Falls. SD 57101
Phone:
(815) 439 -3100
(515) 254 -9521
(502) 964 -3361
(605) 334 -9749
Fax
(815) 439 -3130
(515) 254 -9511
(502) 966 -8732
(605) 3349752
Signed By:
Bradley M. Veath
Dean Bach -
David L. Dues
Gene Jones. Jr.
Title:
Business Dev. Manager
Regional Sales Manager
Vice President
President
Bid Security.
Bid Bond
Bid Bond
Bid Bond
Bid Bond
Addenda Acknowledged:
1,2
1.2
one
1,2