Loading...
HomeMy WebLinkAbout6.m. Addendum to 1999 Utility Rate StudyCITY OF ROSEMOUNT EXECUTIVE SUMMARY FOR ACTION CITY COUNCIL MEETING DATE: June 20, 2000 AGENDA ITEM: Addendum to 1999 Utility Rate Study AGENDA SECTION: Consent PREPARED BY: Dan Fick, City Engineer /Public Works Director . AGENDA- � 1 ATTACHMENTS: Resolution, Current Portion of Rate & Fee APPROVED BY: Schedule Pertaining to Trunk Charges Un December 7, 1999 the City Council adopted the current 2000 Rate and Fee Schedule which incorporated the Comprehensive Utility Rate Study. Part of that Study added trunk water and sanitary sewer fees, which were to be paid up front by the developers. These fees were meant to be charged on a City -wide basis to fund utility infrastructure improvements. Initially the fees were computed on a per unit basis but were modified to a per acre basis to account for commercial and industrial development. Consequently, high density residential developments pay a fee lower than appropriate to their use and low density residential developments pay a disproportionately higher fee than their use requires. Therefore, this issue was discussed of the June 12, 2000 Utility Commission meeting and the Commission approved the following modifications to the adopted water and sanitary sewer trunk charge policy. 1. Single and Multiple- family Residential Developments Trunk water and sanitary sewer fees shall be charged on a per unit basis at the rate of $ 1,100 per unit for water and $300 per unit for sanitary sewer. These rates would increase annually at the percentage rates specified in the current study. 2. Commercial and Industrial Developments Trunk water and sanitary sewer fees shall be charged a per acre basis at the rate of $3,300 per acre for water and $900 per acre for sanitary sewer. These rates would increase annually at the percentage rates specified in the current Rate Study. Unit density was assumed to average three units per acre for these rates. This density assumption was established in the City 2020 Comprehensive Plan. statt recommends the adoption of a resowtion amenaing the rates and tees tar 2000. RECOMMENDED ACTION: MOTION TO ADOPT A RESOLUTION AMENDING RESOLUTION 1999 -147, A RESOLUTION ESTABLISHING RATES AND FEES FOR 2000. COUNCIL ACTION: CITY OF ROSEMOUNT DAKOTA COUNTY, MINNESOTA RESOLUTION 2000 A RESOLUTION AMENDING RESOLUTION 1999 -147 A RESOLUTION ESTABLISHING RATES AND FEES FOR 2000 WHEREAS, the Utility Commission of the City of Rosemount reviewed the Trunk Water and Sanitary Sewer Area Fees adopted in Resolution 1999 -147 and deemed clarification necessary, and WHEREAS, upon recommendation to the City Council, the City Council agrees to the amendment of certain rates pertaining to the Trunk Water and Sanitary Sewer Area Fees as shown below: Sanitary Sewer Charges Item 4B(b.)(1.) Trunk Area Assessments collected with final plat/subdivision agreement as follows: Single Family Residential $300 per unit Multi- Family Residential $300 per unit Institutional $900 per acre Commercial $900 per acre Industrial $900 per acre Water Charges Item 4C(b.)(1.) Trunk Area Assessments collected with final plat/subdivision agreement as follows: Single Family Residential $1,100 per unit Multi- Family Residential $1,100 per unit Institutional $3,300 per acre Commercial $3,300 per acre Industrial $3,300 per acre NOW THEREFORE BE IT RESOLVED, that the City Council of the City of Rosemount hereby approves the amended rates and fees as listed above. ADOPTED this 20 day of June, 2000. Cathy Busho, Mayor ATTEST: Linda Jentink, City Clerk Motion by: Second by: Voted In Favor: Voted Against: Members Absent: i Schedule of Rates & Fees Appendix I -2000 Meter Reconnection Charge $ 35.00 Utility Billing Search/Resident No Charge Utility Billing Search/Non- Resident $ 5.00 + tax New Customer List $ 3.00 + tax Total Customer List $ 25.00 (+ tax) Water Meter Accuracy Check Testing 5/8" - 2 " meters $ 30.00 Testing 3" meters $ 36.00 Testing 4" meters $ 70.00 Testing 6" meters $ 100.00 Water Meter Installation Charges With MIU Without MIU 5/8" (City installed) $ 300.00 $ 200.00 1" (City installed) $ 414.00 $ 309.00 1 - 1 /2" (Plumber installed) $ 580.00 $ 470.00 2" (Plumbed installed) $ 725.00 $ 612.00 3" (Plumber installed) $ 1,152.00 $1,038.00 4. Water, Sanitary Sewer and Storm Water Capital Charges A. Metropolitan Council Environmental Services Availability Charge (Metro SAC) Per Sac Unit, as determined by the MCES, $1,100.00 collected by the City with the building permit beginning January 1, 2000 B. City Sanitary Sewer Availability Charges a.) For all developments with final plat approval prior to January 1, 2000: Per Sac Unit as determined by MCES and collected with the building permit per the schedule as follows: Single Family (SF) Detached $1,400 Mobile Homes $1,400 SF Attached with Individual Laundry $1,400 Apartments, Condo, & SF Attached with Central Laundry Facilities $1,130 Public/ Institutional, Industrial, Commercial $1,400 b.) For all developments with final plat approval after January 1, 2000. 1. Trunk Area Assessments collected with final plat/subdivision agreement as follows: 5 s Schedule of Rates & Fees Appendix I -2000 Single Family Residential $ 900.08 - pe r- - acre - ' Multi- Family Residential $ - 900.00 per ae+e— Institutional $ 900.00 per acre Commercial $ 900.00 per acre Industrial $ 900.00 per acre 2. Per SAC Unit as determined by the MCES and collected with the Budding Permit as follows: Single Family Residential $ 1,000.00 Multi- Family Residential $ 1,000.00 Institutional $ 1,000.00 Commercial $ 1,000.00 Industrial $ 1,000.00 C. City Water Availability Charges a.) For all developments with final plat approval prior to January 1, 2000: Per Sac Unit as determined by MCES and collected with the Building Permit as follows: Single Family (SF) Detached $ 2,200.00 Mobile Homes $ 2,200.00 SF Attached with Individual Laundry $ 2,200.00 OR: 1 ( *) Meter $ 5,000.00 1' /2" ( *) Meter $ 7,500.00 2" ( *) Meter $10,000.00 2'h ( *) Meter $12,500.00 3" ( *) Meter $15,000.00 4 ,7 ( *) _ Meter $17,500.00 6" ( *) Meter $20,000.00 b.) For all developments with final plat approval after January 1, 2000: 1. Trunk area assessments collected with final plat/subdivision agreement as follows: