' CITY OF ROSEMOUNT
EXECUTIVE SUMMARY FOR ACTION
CITY COUNCIL MEETING DATE: September 5, 2000
AGENDA ITEM: Change Order #2 - Birger Pond Outlet
Improvements, City Project #262
AGENDA SECTION:
Consent
PREPARED BY: Bret Weiss, Interim City Engineer
AGEND '06 G
ATTACHMENTS: Change Order #2
APPROVED BY:
Attached please find Change Order #2 for the Birger Pond Lift Station Improvement Project.
This Change Order addresses the addition of SCADA System Monitoring panels at Birger Pond
and Wensmann Pond to allow for the operation of the pumps at Birger Pond and control the
elevation at Wensmann Pond. The addition of these panels will allow for Public Works to
operate the lift station from the Public Works office versus accessing the site directly.
The Change Order is for the cost of adding the panels and a lump sum amount for electrician
installation. The electrician installation portion of the project will be based on actual work to be
completed not to exceed- $3,500. The total amount of the Change Order is $23,471.94.
Staff recommendation is that Change Order #2 be approved in the amount of $23,471.94 .
RECOMMENDED ACTION: MOTION TO APPROVE CHANGE ORDER #2 TO BIRGER POND
OUTLET IMPROVEMENTS, CITY PROJECT #262 IN THE AMOUNT OF $23,471.94.
COUNCIL ACTION:
3
RUG -30 -2000 13:22 WSB & ASSOCIATES INC. 7635411700 P.02iO3
w ,
Add monitoring panels to the City Scada system for the operatic
CHANGE IN CONTRACT PRICE
Original Contract Price:
- -- . —• ��___ $837,607.70
Previous Change Orders: No.1 to 1
— •— . $17,203.00
Contract Price Prior to This Change Order.
--- — $854,810.70
Net Increase of This Chang ord er. ~�
Contract Price With All Approved Change
Orders:
Recommended By:
Bret A. Weiss,
BIRGER POND OUTLET - Ctl¢NGE ORDER-140.2
CITY OF ROSEMOUNr PROJECT N0.262
WSB PROJECT NO. 1000.01
Owner. � `'— —' -- -- —
Contractor City Rosemount — D ate o Issuance:
f Issua�� , qu g ust .
30, 2000
Barb arossa & Sons, Inc. — - --
the following changes in the Contract Document d'neer.
You are directed to make WSB & Associates, Inc.
ascription:
Approved By:
Engineer
I of the Binger Pond lift station and the Wensmann Pond gauge
F E IN CONTRACT TIME
Contract Time:
nge from Previous Change Orders: None
Timm nor". s.. -,m:—
_$23471.94 1 Net Increase of Change Order
None
5878,282.64 Contract Time With Approved Change
Orders: -
Approved By:
Approved By:
Contractor
Date of Council Action:
City Engineer City Admin(strator
F.iWp{y�M! pyi.Gl loo �
WbB & ASSOCIATES INC. 7635411700 P.03/03
-
BIRGER POND oVrLET '
CITY OF ROa motw PptojEcT No. 20
W50 PROJECT N0. 109S.01
Adde Items
ft Spec, No._
No. Description Total
--- _ Units Unit Price
Item Total
Quantity
1 Std Spec Sceda System (2 Monitoring Panels)
2 -
— 1.00 LS $ 19,971.94 31 S S pec Electrician Install 9,971.94
� '�-- —
Total Added !tans ~~- 1.00 LS S 3,500.00
.._� 33,500.00
$23.471.94
P�w�wt►v�to9tatr