Loading...
HomeMy WebLinkAbout6.k. Receive Feasibilty Report/Approve Project/Order Plans & Spec's/Approve Plans & Spec's/Authorize Advertisement for Bids for Broback 3rd Addition Storm Sewer Project, City Project #319I CITY OF ROSEMOUNT EXECUTIVE SUMMARY FOR ACTION CITY COUNCIL MEETING DATE: JULY 18, 2000 AGENDA ITEM: Receive Feasibility Report /Approve AGENDA SECTION: Project /Order Plans & Spec's /Approve Plans & I Consent I I Spec's /Authorize Advertisement for Bids — Broback 3` Addition Storm Sewer Project, City Project #319 PREPARED BY: Dan Fick, City Engineer /Public Works Director AGEND&ROL ATTACHMENTS: Feasibility Report, Resolution APPROVED BY: _ V y y v Each year the City of Rosemount undertakes a certain number of drainage and street improvement projects to eliminate problem areas. This year we are making improvements in the Broback 3' Addition. (See Figures 1 and 2) This area originally was developed without the installation of storm sewer and is a part of the Hawkins Pond drainage area. There is a significant drainage problem at 146t Street where the curb discharges into a flat drainage swale with no outlet. Drainage issues in this area were intended to be accommodated through an extension of storm sewer, but currently only a dry well sump with no outlet is in place. Attached is the Feasibility Report for the Storm Sewer Improvement Project for Broback 3`d Addition, City Project #319. Since the construction item cost is estimated to be less than $50,000, the City, if it chooses, can solicit'price quotes rather than advertising for competitive bids as allowed by newly revised State Statutes. This project would be financed through the Storm Sewer Utility Fund and no costs would be assessed to property owners. At the July 10, 2000 Utility Commission meeting, the Commission recommended approval of the project by Council. Staff recommends the action as stated below. RECOMMENDED ACTION: MOTION TO ADOPT A RESOLUTION RECEIVING THE FEASIBILITY REPORT, APPROVING THE PROJECT, ORDERING PLANS AND SPECIFICATIONS, RECEIVING PLANS AND SPECIFICATIONS AND AUTHORIZING ADVERTISEMENT OF BIDS FOR BROBACK 3 RD ADDITION STORM SEWER PROJECT, CITY PROJECT #319 COUNCIL ACTION: 2 CITY OF ROSEMOUNT DAKOTA COUNTY, MINNESOTA RESOLUTION 2000 - A RESOLUTION RECEIVING THE FEASIBILITY REPORT, APPROVING THE PROJECT,_ ORDERING THE PLANS AND SPECIFICATIONS, RECEIVING THE PLANS AND SPECIFICATIONS AND AUTHORIZING ADVERTISEMENT OF BIDS FOR THE BROBACK 3R ADDITION STORM SEWER PROJECT CITY PROJECT #319 WHEREAS; City Council of the City of Rosemount ordered a feasibility report for the Broback 3` Addition Storm Sewer Project, City Project #319 on May 2, 2000; and WHEREAS, the City Council has received and accepted the Feasibility Report on July 18, 2000 for City Project #319; and NOW THEREFORE BE IT RESOLVED, that the City Council of the City of Rosemount hereby orders the improvements of the Broback 3`d Addition Storm Sewer Project, City Project #319. BE IT FURTHER RESOLVED, that the City Council of the City of Rosemount orders the preparation of plans and specifications for said improvements of City Project No. 319. BE IT FURTHER RESOLVED, by the City Council of the City of Rosemount, Minnesota: 1. Such plans and specifications are hereby approved and ordered placed on file in the office of the City Clerk. 2. The City Clerk shall prepare and cause to be inserted in the official City newspaper and the Construction Bulletin an advertisement for bids upon the making of such improvements under such approved plans and specifications for City Project #319. 3. The advertisement shall be published in each of said publications at least once not less than ten (10) days before the date set for opening bids, shall specify the work to be done, shall state that bids will be publicly opened on August 10, 2000 at 10:00 o'clock a.m. at Rosemount City Hall in said City and that no bids will be considered unless sealed and filed with the City Clerk and accompanied by a cash deposit, cashier's check, bid bond or certified check payable to the City Clerk for five (5 %) percent of the amount of such bid. ADOPTED this 18th day of July, 2000. ATTEST: �r Resolution 2000 - Cathy Busho, Mayor Linda Jentink, City Clerk Motion by: Seconded by: Voted in favor Voted against 2 AD ----------- i -------------- DA Psi Vi l — .L - E -- A -E--WE-S-T-------- j i i i iLA �z rF w� Wm REMOVE EXISTING i CATCH BASIN AND RELOCATE. SALVAGE CASTING EXISTING SHED tl,') i i i - 350 N' 'Los O" WSW fA-.-mWwft. i.1IMM74 i� LEGEND EX1511rQ.- _._ - - _.� EXTSTIN6 FENCE 18 HDPE ❑ EXISTING SHED —>> 0 — A 0 p 0 PP 'SAWCUT BIT MINOUS AND PATCH EXISTING SHED 18" RCP REMOVE AN REPLACE CURB AND UTTER Storm Sewer Improvements Rosemount, Minnesota - »-- »---EXISTING STORM SEWER PROPOSED STORM SEWER BITIMINOUS REMOVAL VV EXISTING CONCRETE CURB AND GUTTER V� EXISTING STORM SEWER W 18 HD E�ISTING 30 VLF Ljj >® >> irz EXISTING CHAIN LINK _ FENCE - REMOVE ND SAWCUT BITUM OUS REPLACE WOOD AND PATCH a V� FENCE a EX.STORM MH w 945.86(30 "W) - zz 945.49 (36. "E) m Z <) . MbBRafWN0.11EC01 D1[JIR700� �2uj J BROBACK 3" ADDITION STORM SEWER FEASIBILITY REPORT CITY PROJECT NO. 319 CITY OF ROSEMOUNT, MN July 18, 2000 Prepared by: WSB & Associates, Inc. 350 Westwood Lake Office Park 8441 Wayzata Boulevard Minneapolis, MN 55426 -1344 (612) 541 -4800 (612) 541 -1700 ,(Fax) BROBACK 3" ADDITION STORM SEWER FEASIBILITY STUDY CITY OF ROSEMOUNT WSB PROJECT NO. 1235 -002 I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly registered professional engineer under the laws of the State of Minnesota. Bret A. Weiss, P.E. Date: July 18, 2000 Reg. No. 20753 BROBACK 3 RD ADDITION STORM SEWER FEASIBILITY STUDY CITY OF ROSEMOUNT WSB PROJECT NO. 1235 -002 TABLE OF CONTENTS PAGE I. INTRODUCTION ........ ............................... Page 1 H. PROPOSED IMPROVEMENTS ............................. Page 1 III. FINANCING ....... ........... .. .............. Page 2 A. Opinion of Probable Cost Page 2 IV. SCHEDULE . ......... ............... .......... Page 2 APPENDIX ........................ ... ......... Page 4 FIGURES ..... ................. .... .......... Page 6 BROBACK 3" ADDITION STORM SEWER FEASIBILITY STUDY CITY OF ROSEMOUNT WSB PROJECT NO. 1235 -002 L INTRODUCTION Each year the City of Rosemount undertakes a certain number of drainage and street improvement projects. The Broback 3r' Addition storm sewer improvements are located between 145` Street and 146` Street between Danville Avenue and Danbury Avenue. This area was developed without the installation of storm sewer and is a part of the Hawkins Pond drainage area. The property owners were previously assessed for the development of Hawkins pond. There is a significant drainage problem at 146` Street where the curb discharges into a flat drainage swale with no apparent outlet. With the development of the 145` Street Improvement Project several years ago, a storm sewer stub was provided to this area with the anticipation of a future extension to the Twin Puddles drainage area. Since that time, the Comprehensive Stormwater Plan has been modified to eliminate the extension of this pipe and provide a different method of out - letting Twin Puddles. Drainage issues in this area were intended to be accommodated through this extension of storm sewer; however only a dry well with no outlet remains. IL PROPOSED IMPROVEMENTS This project proposes to extend an 18 inch storm sewer system from the existing stub at 145` Street to 146` Street, with improvements at the intersection of Danbury Avenue and 146` Street to address settled curb issues. The majority of the drainage issues occur at 146` Street. The existing catch basin off of 146` Street will be removed and replaced with two catch basins on either side of 14e Street, with 18 inch storm sewer extending to 145`h Street. The construction will include three catch basins throughout the length of the storm sewer installation to collect backyard drainage. There are some minor construction issues in the area, including a short segment of fence, some hedges and the temporary relocation of a storage building. In addition, due to the tight construction area, we are proposing the use of HDPE polyethylene pipe, which can be more easily manipulated in this type of an application. This pipe will also allow for the construction to be completed with a tractor backhoe style excavator, and should minimize the amount of restoration. BROBACK 3' ADDITION STORM SEWER FEASIBILITY STUDY CITY OF ROSEMOUNT WSB PROJECT NO. 1235 -002 Page 1 III. FINANCING The construction activities are intended to be fully funded through the storm water utility fund, which is established to address drainage concerns, and minor reconstruction projects of this nature. A. Opinion of Probable Cost The summary of the project cost is $60,924.16 which includes a 10% contingency and 28% indirect costs. IV. SCHEDULE City Council Accept Feasibility Study /Authorize Preparation of Plans and Specifications/ Approve Plans and Specifications & Order Ad for Bids ........... July 18, 2000 Receive Bids ... ................ ............... August 10, 2000 Award Contract .......... .. ....... ........ August 15, 2000 Completion of Construction ......................... September 15, 2000 BROBACB 3 ADDITION STORM SEWER FEAsrmurY STUDY CITY OF ROSEMOUNT WSB PROJECT NO. 1235 -002 Page 2 V. RECOMMENDATION It is the recommendation of WSB & Associates, Inc. that, City Project No. 319 is feasible, necessary and cost - effective from an engineering standpoint. We recommend construction of the proposed improvements as detailed in this report. BROBACK 3 PD ADDITION STORM SEWER FEASIBILITY STUDY CITY OF ROSEMOUNT WSB PROJECT NO. 1235 -002 Page 3 APPENDIX BROBACK 3" ADDITION STORM SEWER FEASIBILITY STUDY CITY OF ROSEMOUNT WSB PROJECT NO. 1235 -002 Page 4 J Engineer's IPreliminary'Opiaal ou "Tr Cost City, of :Rosemount.- Brobscic 30 Addition- City Project No. 319 Schedule A - Storm Water Improvements Item Description Unit Quantity Unit Cost Total Cost 1 MOBILIZATION LS 1 $1,500.00 $1,500.00 2 REMOVE AND REPLACE FENCE LF 150 $5.00 $750.00 3 REMOVE BITUMINOUS PAVEMENT SY 100 $2.00 $200.00 4 REMOVE CURB AND GUTTER LF 80 $1.50 $120.00 5 REMOVE CATCH BASIN EA 1 $200.00 $200.00 6 RELOCATE SHED LS 1 $500.00 $500.00 7 STREET REPLACEMENT SY 80 $20.00 $1,600.00 8 BITUMINOUS PATH REPLACEMENT SY 40 $12.00 $480.00 9 L C ONCRETE CURB AND GUTTER LF 80 $7.00 $560.00 10 T RAFFIC CONTROL LS 1 $500.00 $500.00 11 SODDING TYPE LAWN SY 1500 $2.50 $3,750.00 12 18" RC PIPE DESIGN 3006 CLASS V LF 30 $30.00 $900.00 13 18" ADS HDPE PIPE LF 650 $23.00 $14,950.00 14 30" RC PIPE DESIGN 3006 CLASS III LF 24 $40.00 $960.00 15 CONST. DRAINAGE STR. DES. 48 -4020 LF 50 $200.00 $10,000.00 16 CONST. DRAINAGE STR. DES. 60 -4020 LF 12 $300.00 $3,600.00 17 SALVAGE CASTING EA 1 $100.00 $100.00 18 INSTALL SALVAGE CASTING EA 1 $200.00 $200.00 19 CASTING ASSEMBLY EA 6 $400.00 $2,400.00 Total Cost 10% Contingency Subtotal 28% Indirect Cost $43,270.00 $4,327.00 $47,597.00 $13,327.16 Grand Total $60,924.16 BROBACK 3" ADDITION STORM SEWER FEASIBILITY STUDY CITY OF ROSEMOUNT WSB PROJECT NO. 1235 -002 Page 5 J FIGURES BROBACK 3 ADDITION STORM SEWER FEASIBILITY STUDY CITY OF ROSEMOUNT WSB PROJECT NO. 1235 -002 Page 6 Eli i s IN AD S213NN'dld - Si133NIJN3 321fll0f1211SVZIAI Z DOLL - L49 XVJ x/ 'saml"VY'P ain6i j 9ZO99 NV4'sgodeauuryy �SM pUenalnog elezReM L"R - ao�p a�e� poonNsaM OS£ OOOZ'aunp :area Z00 o l�*Jd 8SM 05 SZ 0 HW W2JOlS 1'd0'X3 snONIWf11 �NIlSIX3 - - - -- - -- — — - -- N CA cn 0 0 N i 0 co O N a I ' � z 2 I I n GNd gano i c Nd 3AOV13H j K (3 „92) 6b'Sb6 —� z (M „OS)99'Sb6 C/) I (S)60'6b6 HW MJO1S'X3 / _� D 1 sno Nnl un HOiVd ONV rt-{ Nriiiq 1nomvs m Un� _� d d a 0 - r7 --� « , m' mA Y enls„ c 9NI1SD CYO Ol l33NNC 39dn�dS ^ _Sd3 NISdB HOld3 2J3M3cS FT-1: W2J01_ I X3 3nOW3d ONIISIX- 0 �A d311f10 H GNV gano zlz :tt_ 31383NO3 ONIISIX3 °'” ^ ^ I - ldAON3d SnON I W I l I 9 d3m3S Ndo1S 03SOdOdd I d3M3S NdOlS SN I 1S I X3 - -- <<- - -- �����- - - - - -- — — - - - - - -- 33N3� SN I 1S I X3 N CA cn 0 0 N i 0 co O N a