Loading...
HomeMy WebLinkAbout10.c. Comprehensive Plan Implementation Rezoning of Properties to Business ParkCITY OF ROSEMOUNT EXECUTIVE SUMMARY FOR ACTION City Council Meeting Date: October 5, 2000 AGENDA ITEM: Comp Plan Implementation: Rezoning of AGENDA SECTION: properties to Business Park New Business PREPARED BY :_ Rick Pearson, City Planner AGENDA ` ATTACHMENTS: Map of zoning changes, Draft Ordinance, Draft APPROVED BY: P.C. minutes (9- 12 -00), Comp Plan & Zoning excerpt. Applicant: City of Rosemount Property Owner(s): (1) Douglas & Susan Dehmlow (4) David & Lee Ann Wachter (2) Leo Stern &Dottie Hammel (5) Donald & Carol Wachter (3) RHB Inc. (6) Harold & Anna Wachter Location: Rosemount Business Park, East of Hwy 3 & South of County Road 42 Area in Acres: Approximately 245 acres Comp. Guide Plan Desig: Business Park Current Zoning: Agriculture Planning Comm Action: Recommendation of Approval (4 -0) with modifications. SUMMARY This item is part of Rosemount's ongoing implementation of the Comprehensive Plan. The City is recommending that land designated for Business Park use be rezoned accordingly. The area affected by this initiative is the land south of CSAH 42 and the City owned Business Park area west of Biscayne Avenue and east of Highway 3. To be in conformance with the Comprehensive Plan, the City is proposing to change the zoning to Business Park l and Business Park 2 as shown on the attached map. The map has been altered to reflect the Planning Commission recommendation. Rosemount's 2020 Comprehensive Plan identifies a 350+ acre business park. The Bisness Park is designed to serve the needs of low impact light industry, general office development, and supporting commercial services. It is divided into overlay zones specifically designed to compliment and enhance building and site performance standards and to provide an effective transition to residential uses as applicable. A description of the proposed overlay designations for this action follows: Business Park- 1 (BP -1): This zone provides for planned industrial, accessory commercial, and office uses. It is adjacent to General Industrial uses, railroad rights of way, or major or minor arterial streets. Screened outdoor storage is allowed. Business Park — 2 (BP -2): This zone provides for business and professional office, limited manufacturing and planned industrial uses. The zone is adjacent to General Commercial uses or has proximity to major or minor arterial streets. Outdoor storage is not allowed. PLANNING COMMISSION PUBLIC HEARING The property owners generally seemed to prefer BP -1, because of the lower architectural expectations and the ability to have outdoor storage. The higher expectations for BP -2 zoning was thought to inhibit development. The Commissioners felt that higher standards were desireable, and recommending increasing the BP -2 to include land along Biscayne Avenue east of the pipeline easement. RECOMMENDED ACTION: Motion to adopt an ordinance rezoning the Agricultural land in Section 32 to BP -1 and BP -2, in conformance with the 2020 Comprehensive Plan. I CITY COUNCIL ACTION: J Business Park Rezoning C.SAH NQ 42 2 0 OANH«•i 4 aw? vJ can. �- Z W BP-1 BP -1 2 B P' 1 �\> `{ BP -2 dJ� ^ ' 1L� "� 131*4 (z) J _ BP -1 N Copyright 2000, Dakota County - Map Date: August 23, 2000 Rosemount Business Park N Concept Plan NO SCALE 2 0 g �a s 3 a 4 L C 0 0 G L 160TH STREET WEST /COUNTY RD. 46 a = CURRENT BUSINESS PARK = EXISTING LOT LINE OR ROW LINE FUTURE BUSINESS PARK BOUNDARY ___ = FUTURE LOT LINE OR ROW LINE i, I r � t Uj '• • Lz, AREA u PONDING AREA e City of Rosemount Ordinance No. B- AN ORDINANCE AMENDING ORDINANCE B CITY OF ROSEMOUNT ZONING ORDINANCE Rosemount Business Park THE CITY COUNCIL OF THE CITY OF ROSEMOUNT, MINNESOTA, ORDAINS AS FOLLOWS: Section 1. Ordinance B, adopted September 19, 1989, entitled "City of Rosemount Zoning Ordinance, " is hereby amended to rezone from AG, Agricultural to BP -1 Business Park, the following described property located within the City of Rosemount, Minnesota, to -wit: The Southeast Quarter of the Northwest Quarter east of the Union Pacific Railroad right -of- way AND The South Half of the Northeast Quarter west of the center of the Enron and Williams Bros. pipeline easement; AND The North Half of the Southeast Quarter west of the center of the Enron and Williams Bros. pipeline easement; All in Section 32, Township 115, Range 19 West, Dakota County, Minnesota. Section 2. Ordinance B, adopted September 19, 1989, entitled "City of Rosemount Zoning Ordinance, " is hereby amended to rezone from AG, Agricultural to BP -2 Business Park, the following described property located within the City of Rosemount, Minnesota, to -wit: The Northeast Quarter of the Southwest Quarter east of the State Highway 3 right -of -way; AND The Northeast Quarter of the Northwest Quarter east of the Union Pacific Railroad right-of- way; AND The South Half of the Northeast. Quarter east of the Enron and Williams Bros. pipeline easement; AND The North Half of the Southwest Quarter east of the center of the Enron and Williams Bros. pipeline easement. All in Section 32, Township 115, Range 19 West, Dakota County, Minnesota. Section 3. The Zoning Map of the City of Rosemount, referred to and described in said Ordinance No. B as that certain map entitled "Zoning Map of the City of Rosemount shall not be republished to show the aforesaid rezoning, but the Clerk shall appropriately mark the said zoning map on file in the Clerk's office for the purpose of indicating the rezoning hereinabove provided for in this Ordinance and all of the notation references and other information shown thereon are hereby incorporated by reference and made a part of this Ordinance. Section 4. This ordinance shall be effective immediately upon its passage and publication according to law. ENACTED AND ORDAINED into an Ordinance this P day of October, 2000. ' CITY OF ROSEMOUNT Cathy Busho, Mayor ATTEST; Linda J. Jentink, City Clerk Published in the Rosemount Town Pages this day of , 2000. Planning Commission Regular Meeting Minutes September 12, 2000 Page 2 MOTION by Droste to recommend that the City Council approve the simple lot split for Lot 1, Block 1, South Rose Park P Addition subject to: 1) Payment of fees required according to the current fee schedule including G.I.S. and Park Dedication; 2) Incorporation of recommendations by the Consulting Engineer concerning access, easements, utilities and public improvements /infrastructure; 3) Provision of one driveway access to Chippendale Avenue serving both lots and recording of cross- access easements and maintenance agreements for both parcels relative to the use, construction and maintenance of the driveway in a form acceptable to the City Attorney; 4) Execution of a subdivision agreement to secure sidewalks (or trails) along Chippendale Ave. and Carrousel Way and "acorn" 'style street lights as needed. Seconded by Weisensel. Ayes: Shoe - Corrigan, Weisensel, Napper, and Droste. Nays: 0. Motion carried. Public Hearing: Comp Plan Implementation Business Park Rezonings Chairperson Droste opened the public hearing on Business Park rezonings in implementation of the Comprehensive Plan. The recording secretary has placed the Affidavit of Publication and Affidavit of Mailing and Posting of a Public Hearing Notice on file with the City. Mr. Pearson indicated that state law requires that a city's zoning be in conformance with its adopted Comprehensive Plan. In implementation of the Comprehensive Plan, staff is proposing that land designated for Business Park use be rezoned accordingly. The rezoning pertains to approximately 245 acres south of the Rosemount Business Park, east of Hwy. 3 and west of Biscayne Ave. Mr. Pearson reviewed the permitted uses and building standards in the BP -1 and BP -2 zoning districts. Mr. Pearson explained that the BP -2 designation is suggested for areas with higher profile, resulting in a higher expectation for architectural materials, along with no outside storage. Chairperson Droste opened the public hearing. Leo Stern 206 Central Ave., Minneapolis, is part owner of the parcel designated for BP -2 zoning. The BP -2 designation is based upon the parcel's potential access and exposure to Hwy. 3 after it is relocated. Mr. Stem opposed the BP -2 zoning for his parcel, which would impose higher architectural standards based upon potential access to Hwy. 3 that does not exist at this time. Mr. Stem feels the City should base a zoning decision on facts as they now exist, not upon a conceptual plan. Mr. Pearson responded that, based upon conversations with MnDOT, he feels an intersection on Hwy. 3 at the location of the Stem parcel is almost a certainty. This would be a key intersection with high visibility, requiring the same standards as Port Authority property on CSAH 42. Rezonings can be requested as the property is subdivided and developed. Planning Commission Regular Meeting Minutes September 12, 2000 Page 3 Mr. Stern feels the City is placing a straight jacket on development by imposing conditions and additional costs with the BP -2 zoning. Doug Dehmlow 15725 Biscayne Ave., inquired about future use of his property and whether the rezoning will affect his taxes. Mr. Pearson explained that taxes are based on use and that rezoning does not influence how property is taxed. Mr. Dehmlow can maintain the residential use of his property, however, the status will become legal non - conforming. This status restricts Mr. Dehmlow's ability to expand his home and prohibits rebuilding if his home is damaged beyond 50 %. MOTION by Droste to close the public hearing. Seconded by Napper. Ayes: Weisensel, Napper, Droste and Shoe - Corrigan. Nays: 0. Motion carried. Commissioners compared standards imposed by BP -1 and BP -2 and discussed whether the more stringent standards in BP -2 should be imposed more extensively. This would be more consistent with Port Authority development on CSAH 42. A BP -2 zoning could be changed if warranted by a future development. Mr. Pearson suggested double zoning designations on parcels, placing BP -1 on the isolated, interior segments and BP -2 on outer, more visible segments. Commissioners reviewed options to delineate between the two zoning designations. MOTION by Shoe - Corrigan to recommend that the City Council approve the change in zoning to Business Park -1 and Business Park -2, and further recommending that the areas designated for BP -2 zoning include: a) the Stem/Hammel parcel; b) the Harold & Anna Wachter parcel north of the quarter section line ands) properties along Biscayne Avenue, east of the pipeline easement. Seconded by Droste. Ayes: Napper, Droste, Shoe - Corrigan, and Weisensel. Nays: 0. Motion carried. Nw Business: Evermoor Final Plats Mr. Pe n resented the final plats for Evermoor, Everm nd Addition, and Evermoor 3 Addition. The final plats are consistent the approved preliminary plat. Mr. Pearson s arized minor adjustments invo g certain lots, which the developer has agreed to chan ce . Commissioners reviewe tbacks ong with a change in the trail access in the Upplands section. Discussio ontinued concerning grading done to the high point, tree preservation, and the wet a of Shannon Parkway. MOTION by Dr a to recommend th the City Council approve the final plat for Evermoor su ' ct to: 1) Execution of a s division agreement to secure public infrastru a including parks, streets and uti ' 'es; 2) Incorporation into the plat of reco endations of the Engineering/Public Wo Department and the Consulting Planning Commission Regular Meeting Minutes September 12, 2000 Pa e 4 g Engineer regarding drainage, easements, grading, public & private streets and, utilities; and 3) Modification of the plat to provide additional lot depth to one side of Lot 2, Block 8. Seconded by Napper. Ayes: Droste, Shoe - Corrigan, Weisensel, and Napper, Nays: 0. Motion carried. MOTION by Droste to recommend that the City Council approve the final plat for Evermoor 2 nd Addition subject to: 1) Execution of a subdivision agreement to secure public infrastructure including parks, streets and utilities; 2) Incorporation into the plat of recommendations of the Engineering/Public Works Department and the Consulting Engineer regarding drainage, easements, grading, public & private streets and utilities; and 3) Modification of the plat to provide additional lot width for Lots 31 and 33, Block 4. Seconded by Weisensel. Ayes: Shoe - Corrigan, Weisensel, Napper, and Droste. Nays: 0. Motion carried. MOTION b d y Droste to recommend that the City Council approve the final plat for Evermoor 3' Addition subject to: 1) Execution of a subdivision agreement to secure public infrastructure including parks, streets and utilities; 2) Incorporation into the plat of recommendations of the Engineering/Public Works Department and the Consulting Engineer regarding drainage, easements, grading, public & private streets and utilities; 3) Recording of cross- access easements for access to lots 1 and 2, Block 1 with Lot 3, Block 1; and 4) Change "1" to "2" for Block 2 on page 3 of 3. Seconded by Weisensel. Ayes: Weisensel, Napper, Droste, and Shoe - Corrigan. Nays: 0. Motion carried. Commissioners requested that a drive - through of the Evermoor project be arranged for the Planning Commission meeting on September 26. The starting time for the meeting will be changed to 6:00 p.m. There being no further business to come before this Commission, upon MOTION by Droste and upon unanimous decision, the meeting was adjourned at 9:35 p.m. Respectfully submitted, Dianne G. Quinnell Recording Secretary City of Rosemount 5.1 Implementation Plan . 5.1.1 Introduction The Comprehensive Plan will be translated from a policy document into a growth management process via an implementation plan. The implementation plan will involve modifications of city controls and policies, especially zoning amendments, including both ordinance amendments and rezonings. Additional studies go beyond the scope of the Comprehensive Plan, but will influence aspects of the plan such as the Commercial Center revitalization plan,: ongoing and future transportation studies and occasional initiatives generated externally by various applicants: The Comprehensive Plan also has an amendment process to consider changes to the plan as a result of new ideas, strategies, or relevant development initiatives. 5.1.2 Im lementation Plan Components - Land Use p 1. Update the official "tools °(eg., zoning and subdivision ordinances) to accomplish broad and specific objectives in this Plan. 2. Rezone land in conformance with new land use objectives established in the 2020 Land Use Plan. 3. Achieve Livable Communities objectives, which are local goals within a regional housing framework, established by the Dakota County HRA. 4. Participate in current/future transportation studies including the CSAH 42 Corridor Transportation Plan, the STH 52 Corridor Plan and the STH 3 Corridor Plan. 5. Complete a conceptual design strategy for the Commercial corridor right- of -way along State Highway 3 and County Road 42. 6. Use public financing resources to assist . those economic development projects that achieve high value to the city, including redevelopment - opportunities and job creation. 7. Utilize and update the city's capital improvement plan in conjunction with development objectives in this Plan. 8. Evaluate public and private impacts to urban service expansion north of Highway 38 (east of Highway 3). 9. Develop stronger ties with the University of Minnesota in relationship to cooperative uses in or near their research property. 164 25. Wholesale businesses and supply centers. 26. Animal sales and services including pet hospitals, pet shops, kennels and terinary clinics provided they have no outdoor runs. 27. line stations and car washes including drive- through and conve r types, subject to the special restrictions established for the C -1 District. efer to Sec n 6.93.1. 28. Comm ial recreation- outdoor subject to the special res ions for the C -3 Distric t. efer to Section 6.12.3.7. 29. Outdoor di ay of merchandise subject to the fol wing restrictions: a. The sale is con cted by the owner or lessee f the premises or with his or her written pe 'ssion. b. The sale is no long e in duration th o (2) days. c. The goods are those c tomaril sold within that structure in the C-4 District. d. The merchandise and ve ' e o not occupy the required parking area of the principal use. 30. Video arcades subj to the follo a. Any arcade wi fifteen (15) or more m hines shall have an adult supervisor on the remises during all hours of eration. b. No arc a shall be operated within five hun ed feet (500') of a school, ch h or residence. C. Uses P 'tted by PUD: Commercial developments inv ving multiple parce structures or uses shall be required to use the PUD pro dure. Refer to lion 12 for PUD requirements. (Ord. B, 9- 19 -89) 6.14: BP BUSINESS PARK DISTRICT: A. Purpose and Intent. This district, is intended to accommodate new, modem, high performance, limited industrial uses, business/office/warehouse and accessory retail and service uses which are planned as a unit and include an City of Rosemount Page 78 internal circulation system. This district is located within the Metropolitan Urban Service Area WSA) and is intended to be served by the public utility systems. Overlay zones with locational criteria specifically enumerate permitted uses by zone which are complimented by enhanced building and site performance standards that will assure high quality development and provide an effective transition to residential uses. Uses shall be conducted completely within structures excepted as provided for herein: BP -1 This zone provides for planned industrial, accessory commercial, and office uses. This zone is adjacent to General Industrial uses, railroad rights -of -way, or significantly separated from major or minor arterial streets. Outdoor storage is allowed in accordance with the standards as set forth in this Ordinance. BP -2 This zone provides for business and professional office, limited manufacturing and planned industrial uses. The zone is adjacent to General Commercial uses or has proximity to major or minor arterial streets. Outdoor storage may be permitted by Planned Unit Development in accordance with the standards as set forth in this ordinance. BP -3 This zone provides for office and planned industrial uses. This zone is a transition area adjacent to residential uses, or separated from residential uses by a collector or local street. No outdoor storage is allowed. BP-4 This zone provides for a variety of less intensive business activities, such as offices, banks and health care uses as well as medium density residential uses. The zone is adjacent to residential uses, or contains natural amenities or features that may provide opportunities for multiple family or attached housing with high standards of architectural and site design. No outdoor storage is allowed. (Ord.. B -63, 6- 14-96) City of Rosemount Page 79 0- 1. 2. 3. 4. 5. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. D. Uses Permitted by Right BP -I BP-? BP Pte. Business and Professional Offices X X X X Manufacturing, Custom X g Manufacturing, Limited and Accessory Uses, but excluding lumber yards and construction material sales as a principal use X X . Warehousing and Distribution X X Wholesaling and Accessory Uses but; excluding livestock and raw farm product materials X X Small Appliance and Business Services & Repair Shops including: electronics, office supplies & equipment, and power products, but excluding outdoor display X Testing and Research & Development X X X Business, Trade & Vocational Schools X X X X Commercial Indoor Recreation, including: health & fitness clubs, racquetball and tennis courts, spas, pools, and gymnasiums X X X X Motion Picture & Recording Production Studios and Radio & Television Broad casting Stations, but excluding towers and antennas X X X Transit Stations and Park & Ride Facilities X X X X Financial Institutions and Banks X X Health Care Facilities including: hospitals, clinics, doctor's offices, diagnostic or treatment centers; but excluding long -term or intermediate care facilities such as nursing homes, sanitariums, or institutional uses X X Printing and Duplicating Shops, but excluding retail self or express service businesses as a.principal use X X X Day Care Centers, Nursery and Montessori Schools X X General Building and Special Trade Contractor Shops and Offices X Commercial Bakeries X X X Self- service Storage Facility, subject to the requirements of the C -3 District in Section 6.12(B.8.) X (Ord. B -63, 6- 14 -96) (Ord. B -72, 11 -5 -96) Uses Permitted by Planned Unit Development (PUD): Commercial and Industrial developments involving multiple parcels and phasing, or multiple uses shall be required to use the PUD procedure. In the BP-4 Overlay Zone, multiple family and attached single family developments shall be required to use the PUD procedure. (Ord. B -53, 4- 18 -95) Accessory Uses Permitted by Right: Indoor limited retail or direct sales of goods and products to customers may be permitted as accessory to office/ warehouse / manufacturing /wholesale/service uses, subject to the following standards: City of Rosemount Page 80 s 1. Location a. All sales are conducted in a clearly defined area inside the principal building reserved exclusively for this purpose. The sales area must be physically segregated from other principal activities in the building. b. The sales area shall comply with all other applicable zoning, building and fire codes for the City of Rosemount. 2. Sales Area. The accessory use sales activity shall not occupy more than fifteen (15 %) percent of the gross floor area of the building. 3. Access. Parking and access for the building/sales area will be from a local or collector commercial street and shall not be accessed by a local street adjacent to or entering a residential neighborhood. 4. Hours. Hours of operation shall be limited to 6 :00 a.m. to 10:00 p.m. E. The following site design and building standards shall apply to all uses permitted in the BP 1 -4 Overlay Zones: 1. Outdoor Storage: Outdoor storage of materials, equipment or products, where allowed, may only be permitted in this district where it is incidental or accessory to a principal use contained within a building. Outdoor storage areas, where feasible, shall be located in the rear of the building and not on a portion of the site with direct frontage upon a public street. All outdoor storage areas accessible by vehicles or heavy equipment shall be surfaced with asphalt or concrete to minimiz dust and control erosion. The perimeter views of all outdoor storage areas shall be completely screened from ground level views on all sides, except at required access points. Particular emphasis shall be placed upon maximizing full opacity from ground level views upon adjacent or nearby streets, all existing or potential residential uses and any other public use or areas. Such screening can be accomplished through one or more of the following measures: a. The placement of the building on the lot. b. Through the use of a combination of berming and a variety of landscaping. Berming should consist of slopes not exceeding a 4 :1 ratio. Plantings used to specifically screen views shall, at a minimum, consist of a six (6) feet high evergreen species spaced on twelve to fifteen (12 -15) feet centers. A greater minimum height may be required where more than three (3) growing seasons are anticipated to accomplish required screening levels. These plantings shall be augmented by other varieties of landscaping off -set along the berm. All plantings shall be installed according to the City of Rosemount's Landscaping Standards. Required landscaping maintenance security for planting screening shall be for an additional two (2) years. City of Rosemount Page 81 c. Screening walls may only be used when the above options are not deemed to be an effective method. They shall consist of durable materials consistent with the color and appearance of the principal structure. Screening walls shall be augmented by landscaping to reduce the visual impact and massing of the structure. 2. Landscaping: a. General: All areas of land other than that occupied by building or hardcover shall be landscaped with sod and/or rock and/or mulch. Other understory trees, shrubs, flowers and ground cover needed to complete landscaping treatments in these areas, shall be included in addition to the minimum number of overstory trees and foundation plantings required by the City of Rosemount's Landscaping Standards. These areas shall include the proper installation of an underground irrigation system. Portions of the site may be exempt from these requirements where future development or planned expansion is anticipated or where other unique conditions exist, such as large open space area, which make it impractical to landscape in accordance with these standards. In all such instances, these areas shall be: (1) Graded and seeded or planted with prairie grass . in accordance with the City of Rosemount Grading Requirements. (2) Remain as undisturbed natural areas containing existing viable natural vegetation that can be maintained free of foreign and noxious plant material and will not produce soil erosion due to potential increases in storm water runoff. 3. Parking Lots: Parking lots containing parking for ten (10) or more spaces are required to be landscaped in the amount of five (5 %) percent of the parking lot surface area interior to the parking lot perimeter. The landscaped area shall be in the form of islands or indentations at the perimeter. Landscape islands shall be a minimum width of eight and one -half (8.5') feet and contain a minimum surface area of one hundred forty-five (145 sq. ft.) square feet. All parking lots shall be screened from public right -of -way in order to minimize the impacts of large expanses of paved surfaces. Screening should be accomplished by the use of a combination of berming and landscaping. The surface of all parking lots and paved circulation lanes shall be defined at all edges by curb and gutter with a design as required by City Standards. City of Rosemount Page 82 4. Set Backs: The following increased minimum, yard set backs shall apply. PARKING & CIRCULATION STRUCTURE ADJACENT USE SETBACK SET BACK Principal Arterial ROW ....... 40 ..... ..... . . .. 75 Minor Arterial ROW .......... 35 .. ... . ..... 60 Collector ROW ... . . 30 ..................... 40 Railroad, Primary ..... 10 ..................... 30 Electrical Transmission or Pipeline ROW/Easements 5. Accessory Structures: All accessory structures shall include exterior building materials of the same type, quality and appearance as that of the principal structure. The height of the accessory structure shall not exceed that of the principal structure. 6. Trash Handling: All trash, recycling and related handling equipment shall be stored within the principal structure or within an attached or detached accessory structure. Where an accessory structure is used it shall provide for walls on three sides at a minimum height of seven (7) feet; and include exterior building materials of the same type, quality and appearance as that of the principal structure. A gate or door shall be provided on the fourth side of durable material which is compatible in color with the principal structure. 7. Signage: Only wall and freestanding ground monument signs shall be permitted in the district in accordance with the City of Rosemount's Sign Regulations and these additional standards as follows: a. Freestanding Ground Monument Signs: A freestanding ground monument sign shall be designed with a base structure of the same exterior decorative materials as the principal structure on the site; and which extends from the sign copy area fully to the ground, except for architectural relief treatments. All freestanding ground monument signs, if illuminated, shall be only. indirect with the light source fully diffused. These signs shall be appropriately landscaped and subject to the same requirements for all landscaping on the property. b. Wall signs: Wail signs shall consist of permanent high quality materials with finished edges. No wood signs shall be permitted. Where more than one (1) wall sign is requested per building frontage (i.e., a multi- tenant center), a uniform sign criteria shall be prescribed by the building City of Rosemount i Page 83 Y owner, subject to review and approval by the City. The sign criteria shall, among other things, describe the uniform type of sign to be allowed, limitations of placement on the building, the method of fastening, and the procedure for tenant sign approval. 8. Lighting: All exterior lighting shall be designed and anranged.to direct illumination away from adjacent or nearby residential uses and districts. No exterior lighting shall be arranged and designed to create direct viewing angles of the illumination source by adjacent properties pedestrians or vehicular traffic in the public right -of -way. Designs for all lighting, including but not limited to, building "wallpack" fixtures, shall incorporate lenses, deflectors, shields, louvers and/or prismatic control devices to eliminate any direct viewing angles. Site lighting shall be designed so as to- limit the illumination intensity created by all fixtures to a level not exceeding 0.5 lumens at the property line. A site lighting plan may be required to insure compliance with these standards and shall be prepared where one or more freestanding lighting fixtures exceeding thirty (30) feet in height are planned for the site. 9. Rooftop Utilities: The ground level view of all rooftop equipment, including but not limited to rooftop structures related to elevators and other mechanical utilities, shall be screened from public right -of -way and adjacent or nearby residential uses and districts. Screening should be accomplished by incorporating architectural building design features such as a parapet wall or sloping roof structures. Wood fencing shall not be permitted. If due to factors unique to the property or the project, it is physically impossible or impractical to screen these utilities, the City's Planning Commission may approve alternative solutions that renders them aesthetically compatible with the building. 10. Underground Electrical Services: No building or structure located in the district shall be served other than by underground electric, telephone and cable distribution facilities. Poles, wires or other above - ground distribution facilities may only be temporarily installed during site construction or repair of the underground system. No changes in the grade or contours of land above or adjacent to these facilities, once installed, shall be made without the approved written consent of the City Engineer and the utility ' company providing such services. (Ord. B -53, 4- 18 -95) City of Rosemount Page 84