Loading...
HomeMy WebLinkAbout7. County Road 46/Trunk Highway 3 Street & Utility Improvements, City Project #284it CITY OF ROSEMOUNT EXECUTIVE SUMMARY FOR ACTION CITY COUNCIL MEETING DATE: March 21, 2000 AGENDA ITEM: County Road 46 /Trunk Highway 3 Street & AGENDA SECTION: Utility Improvements, City Project #284 Public Hearing PREPARED BY: Dave Simons, Consulting Engineer, SEH, Inc. AGE 7 s I ATTACHMENTS: Resolution, Location Map, Preliminary I APPROVED BY: Assessment Roll 1 ;�� _1 This item is on the aqenda for Council to conduct a public hearing to consider t"ounty Road 46 /Trunk Highway 3 Street and Utility Improvements as described in the I- easiniiity report ror City Project #284. Staff will provide an overview of the proposed improvements and will be available to answer any questions you may have. The attached drawing shows the location of the proposed improvements. The project consists of street, trail, storm drain and watermain construction. The total estimated cost to the City of Rosemount is approximately $1,021,000. Part of the project cost is proposed to be recovered through assessments to the benefiting properties, and the remainder is proposed to be recovered from City Core funds and C.I.P. funds, which have previously been encumbered for this project. A copy of the preliminary assessment roll is attached. An open house /public informational meeting was held on March 15, 2000 from 5:00 p.m. - 6 :30 p.m. in the Council Chambers. In addition, the County has sponsored four previous public informational meetings for the larger County project, which extends from Pilot Knob Road in Apple Valley to the east side of Coates. Staff recommends that the attached resolution be passed ordering the project, approving the plans and specifications and approving advertisement of bids by the County. RECOMMENDED ACTION: MOTION TO ADOPT A RESOLUTION ORDERING THE PROJECT, APPROVING THE PLANS AND SPECIFICATIONS AND APPROVING ADVERTISEMENT OF BIDS BY DAKOTA COUNTY FOR COUNTY ROAD 46/TRUNK HIGHWAY 3 STREET AND UTILITY IMPROVEMENTS, CITY PROJECT #284. COUNCIL ACTION: 3 I CITY OF ROSEMOUNT DAKOTA COUNTY, MINNESOTA RESOLUTION 2000 — A RESOLUTION ORDERING THE PROJECT, APPROVING THE PLANS AND SPECIFICATIONS AND APPROVING ADVERTISEMENT OF BIDS BY DAKOTA COUNTY FOR THE COUNTY ROAD 46/TRUNK HIGHWAY 3 STREET AND UTILITY IMPROVEMENTS CITY PROJECT #284 WHEREAS, the City Council of the City of Rosemount ordered a Feasibility Report for the County Road 46/Trunk Highway 3 Street and Utility Improvements, City Project #284; and WHEREAS, the City Council has received and accepted the Feasibility Report on March 6, 2000 for City Project #284; and WHEREAS, an Open House /Public Informational Meeting was held on March 15, 2000 to answer questions and present information regarding the project; and WHEREAS, the City Council ordered and held a public hearing on March 21, 2000 to receive input on this project; and WHEREAS, plans and specifications for the project have been prepared by Dakota County and reviewed by Staff. NOW THEREFORE BE IT RESOLVED, that the City Council of the City of Rosemount hereby orders the improvements of the County Road 46/Trunk Highway 3 Street and Utility Improvements, City Project #284. NOW THEREFORE BE IT FURTHER RESOLVED, that the City Council of the City of Rosemount hereby approves the plans and specifications prepared by Dakota County and approves the advertisement of bids by the County for the street and utilities, City Project #284 described in the aforementioned Report. ADOPTED this 21 day of March, 2000. Cathy Busho, Mayor ATTEST: Linda Jentink, City Clerk Motion by: Second by: Voted in favor:: Voted against: CITY PROJECT NO. 284 COUNTY ROAD 461 TRUNK HIGHWAY 3 STREET AND UTILITY IMPROVEMENTS PRELIMINARY ASSESSMENT ROLE Notes: Assessment rate for commercial/industrial water main construction is $18.991front foot. (Half of a 12" water main) Assessment rate for street construction on North Conn Rd.: ($142,000 x 0.5 / 5 parcels) + $5,000 = $19,200 Assessment rate for street construction on Co. Rd. 46 and North Frontage Rd. is $55.001front foot. (Half of a 38' wide street) Assessment rate for street construction on T.H. 3 is $50.151front foot. ($172,000 / 3,430' total frontage = $50.151front foot) f North Conn Rd. North Fonta a Rd. T.H. 3 Watermain Street Street Street Owner Parcel I.D. No. Frontage ft Assessment Assessment Frontage ft Assessment Frontage ft Assessment TOTAL William's Energy (Mapco Inc Car Nav Five Mur ic's Auto Body 340321001273 340321001970 340321001470 394 $7,500 394 $7,500 $19,200 $19,200 $19,200 525 $26,300 $45,500 $26,700 $26,700 Leo G. Stern and Dottie S. Hammel 340321001165 430 $8,200 $19,200 835 $41,900 $69,300 Car Nav Five (West of T.H. 3 340321002370 236 $4,500 $19,200 760 $38,100 $61,800 Car Nav Five East of T.H. 3 340321002370 649 $35,700 1,310 $65,700 $101,400 Hi hstone Lmtd. Ptnsh . 343280001001 984 $54100 $54100 o franoo Met ro Mosquito Control Dist. CD Real Estate Pt. Thomas En elmeier and Charles En elmeier 340321001885 340321001985 340321002085 340321003085 328 328 331 315 $18.000 $18,000 $18 $17,300 ` $16,000 $18.00 $18,200 $17,300 Brett J. Debates 340311001096 164 $9,000 ` $9,000 TOTAL $27,700 $96,000 $170,300 $172,0 00 $486 000 Notes: Assessment rate for commercial/industrial water main construction is $18.991front foot. (Half of a 12" water main) Assessment rate for street construction on North Conn Rd.: ($142,000 x 0.5 / 5 parcels) + $5,000 = $19,200 Assessment rate for street construction on Co. Rd. 46 and North Frontage Rd. is $55.001front foot. (Half of a 38' wide street) Assessment rate for street construction on T.H. 3 is $50.151front foot. ($172,000 / 3,430' total frontage = $50.151front foot) f ST. c >..i > m .�+ou�u - .....•. 147th 73. T z a 147 a a s St , J= ST. 147th �}— ST — V. j ST. HISGP lJ 74 . ' �ti o D �Fdd ST. tRitru 148th ST. i �!U-PER 147t IT. � fA O l PN�` L � lCBth 14 UppER < 9cL^ c _ rf u 148th ST. a RpER1 ' d ST. o O 8 6. o > r 14 8384. nm 149th ST.q /1 r. 149th CT.. z c �i L'a!AFp I�ae z R20V R19V = t T114N H 127 W. ® 170th ST. V. V I + 5/ T114H R19V 3 N - -1 500 SCALE 1:25000 SCALE IN METERS R Amw FILE SE 001 CO. RD. 46 / T. H. 3 MAWNG . 284 PROJECT NO. PHONE:- >> aeo —z000 CITY PROJECT NO DATE cc,. LOCATION ST3PAUL. N 55110 R OR. 3 -6 -00 ROSEMOLINT, MINNESOTA I -7s 9 - - o w - �- -e ' U` l —1 - iso ST. 1 - '3- " CSAH 42 E1ER LEIGH 119. Qg COQ W O J H / lo C /R DEC EN 6v 4L DECEMBER CT. ? mn �' a e / Y End 42. DARTMOOR CT. > s a� > 151st ST. V a a a Lm c W > Z - R h 29 8 °, '9 L ��• u < m ru 152nd > 3 j 1¢ J $ 115N R19V 1 ~ 'DE N Z; 152th ST. VW P q = ' ST. 9 15 'd ST. m W S W V. Ls U s DR ESd" / W r tig c 154th 154th ST. s -c o G 155tKS I v ST. VT- V. x v 1 55th y a WAY q �NG = PATH > � - IA > CORNELLTR. 80. 152nd CT. o N W $ 156th 7 T• 156th ST ST. UPPERpPI. n� 13 c TR. ' .A. P Oi ' ..KNELL ��' , z ` ' ' u C7. u u Q W C I 8 U u PA-, DARLI C RYST ' 1 C V r Q G . d th CT V 157th T L 4 � 'A'N'N CARDI NAL ST. V A_ �O W I5. th CT. 158th ST. V. 159th'' DAKOTA DR. = O RTH NO FRONTAGE RD, CO \ \\ \ \\ \\ CO. RD. 46 (160TH ST. W.) a A EMPIRE TOWNSHIP W a PROJECT LOCATION z R20V R19V = t T114N H 127 W. ® 170th ST. V. V I + 5/ T114H R19V 3 N - -1 500 SCALE 1:25000 SCALE IN METERS R Amw FILE SE 001 CO. RD. 46 / T. H. 3 MAWNG . 284 PROJECT NO. PHONE:- >> aeo —z000 CITY PROJECT NO DATE cc,. LOCATION ST3PAUL. N 55110 R OR. 3 -6 -00 ROSEMOLINT, MINNESOTA I