HomeMy WebLinkAbout7. County Road 46/Trunk Highway 3 Street & Utility Improvements, City Project #284it
CITY OF ROSEMOUNT
EXECUTIVE SUMMARY FOR ACTION
CITY COUNCIL MEETING DATE: March 21, 2000
AGENDA ITEM: County Road 46 /Trunk Highway 3 Street & AGENDA SECTION:
Utility Improvements, City Project #284 Public Hearing
PREPARED BY: Dave Simons, Consulting Engineer, SEH, Inc. AGE 7 s
I ATTACHMENTS: Resolution, Location Map, Preliminary I APPROVED BY:
Assessment Roll 1 ;�� _1
This item is on the aqenda for Council to conduct a public hearing to consider t"ounty Road
46 /Trunk Highway 3 Street and Utility Improvements as described in the I- easiniiity report ror
City Project #284. Staff will provide an overview of the proposed improvements and will be
available to answer any questions you may have.
The attached drawing shows the location of the proposed improvements. The project consists
of street, trail, storm drain and watermain construction.
The total estimated cost to the City of Rosemount is approximately $1,021,000. Part of the
project cost is proposed to be recovered through assessments to the benefiting properties, and
the remainder is proposed to be recovered from City Core funds and C.I.P. funds, which have
previously been encumbered for this project. A copy of the preliminary assessment roll is
attached.
An open house /public informational meeting was held on March 15, 2000 from 5:00 p.m. -
6 :30 p.m. in the Council Chambers. In addition, the County has sponsored four previous public
informational meetings for the larger County project, which extends from Pilot Knob Road in
Apple Valley to the east side of Coates.
Staff recommends that the attached resolution be passed ordering the project, approving the
plans and specifications and approving advertisement of bids by the County.
RECOMMENDED ACTION: MOTION TO ADOPT A RESOLUTION ORDERING THE PROJECT,
APPROVING THE PLANS AND SPECIFICATIONS AND APPROVING ADVERTISEMENT OF
BIDS BY DAKOTA COUNTY FOR COUNTY ROAD 46/TRUNK HIGHWAY 3 STREET AND
UTILITY IMPROVEMENTS, CITY PROJECT #284.
COUNCIL ACTION:
3
I
CITY OF ROSEMOUNT
DAKOTA COUNTY, MINNESOTA
RESOLUTION 2000 —
A RESOLUTION ORDERING THE PROJECT, APPROVING THE
PLANS AND SPECIFICATIONS AND APPROVING ADVERTISEMENT OF BIDS
BY DAKOTA COUNTY FOR THE COUNTY ROAD 46/TRUNK HIGHWAY 3
STREET AND UTILITY IMPROVEMENTS
CITY PROJECT #284
WHEREAS, the City Council of the City of Rosemount ordered a Feasibility Report for the
County Road 46/Trunk Highway 3 Street and Utility Improvements, City Project #284; and
WHEREAS, the City Council has received and accepted the Feasibility Report on March 6,
2000 for City Project #284; and
WHEREAS, an Open House /Public Informational Meeting was held on March 15, 2000 to
answer questions and present information regarding the project; and
WHEREAS, the City Council ordered and held a public hearing on March 21, 2000 to receive
input on this project; and
WHEREAS, plans and specifications for the project have been prepared by Dakota County
and reviewed by Staff.
NOW THEREFORE BE IT RESOLVED, that the City Council of the City of Rosemount hereby
orders the improvements of the County Road 46/Trunk Highway 3 Street and Utility
Improvements, City Project #284.
NOW THEREFORE BE IT FURTHER RESOLVED, that the City Council of the City of
Rosemount hereby approves the plans and specifications prepared by Dakota County and
approves the advertisement of bids by the County for the street and utilities, City Project #284
described in the aforementioned Report.
ADOPTED this 21 day of March, 2000.
Cathy Busho, Mayor
ATTEST:
Linda Jentink, City Clerk
Motion by: Second by:
Voted in favor::
Voted against:
CITY PROJECT NO. 284
COUNTY ROAD 461 TRUNK HIGHWAY 3 STREET AND UTILITY IMPROVEMENTS
PRELIMINARY ASSESSMENT ROLE
Notes:
Assessment rate for commercial/industrial water main construction is $18.991front foot. (Half of a 12" water main)
Assessment rate for street construction on North Conn Rd.: ($142,000 x 0.5 / 5 parcels) + $5,000 = $19,200
Assessment rate for street construction on Co. Rd. 46 and North Frontage Rd. is $55.001front foot. (Half of a 38' wide street)
Assessment rate for street construction on T.H. 3 is $50.151front foot. ($172,000 / 3,430' total frontage = $50.151front foot)
f
North Conn Rd.
North Fonta a Rd.
T.H. 3
Watermain
Street
Street
Street
Owner
Parcel I.D. No.
Frontage ft Assessment
Assessment
Frontage ft Assessment
Frontage ft Assessment
TOTAL
William's Energy (Mapco Inc
Car Nav Five
Mur ic's Auto Body
340321001273
340321001970
340321001470
394 $7,500
394 $7,500
$19,200
$19,200
$19,200
525 $26,300
$45,500
$26,700
$26,700
Leo G. Stern and Dottie S. Hammel
340321001165
430
$8,200
$19,200
835
$41,900
$69,300
Car Nav Five (West of T.H. 3
340321002370
236
$4,500
$19,200
760
$38,100
$61,800
Car Nav Five East of T.H. 3
340321002370
649
$35,700
1,310
$65,700
$101,400
Hi hstone Lmtd. Ptnsh .
343280001001
984
$54100
$54100
o franoo
Met ro Mosquito Control Dist.
CD Real Estate Pt.
Thomas En elmeier and Charles En elmeier
340321001885
340321001985
340321002085
340321003085
328
328
331
315
$18.000
$18,000
$18
$17,300 `
$16,000
$18.00
$18,200
$17,300
Brett J. Debates
340311001096
164
$9,000 `
$9,000
TOTAL
$27,700
$96,000
$170,300
$172,0 00
$486 000
Notes:
Assessment rate for commercial/industrial water main construction is $18.991front foot. (Half of a 12" water main)
Assessment rate for street construction on North Conn Rd.: ($142,000 x 0.5 / 5 parcels) + $5,000 = $19,200
Assessment rate for street construction on Co. Rd. 46 and North Frontage Rd. is $55.001front foot. (Half of a 38' wide street)
Assessment rate for street construction on T.H. 3 is $50.151front foot. ($172,000 / 3,430' total frontage = $50.151front foot)
f
ST. c >..i > m .�+ou�u - .....•. 147th
73. T z a 147 a a s St , J= ST. 147th �}— ST
— V. j ST. HISGP lJ
74 . ' �ti o D �Fdd ST. tRitru 148th ST. i �!U-PER 147t IT. � fA O
l PN�` L � lCBth 14 UppER < 9cL^ c _ rf u 148th ST. a
RpER1 ' d ST. o O 8 6. o > r 14 8384. nm 149th ST.q
/1 r. 149th CT.. z c �i L'a!AFp I�ae
z
R20V R19V = t
T114N H
127
W. ® 170th ST. V. V I
+ 5/
T114H R19V
3
N
- -1
500
SCALE 1:25000
SCALE IN METERS
R
Amw FILE SE 001 CO. RD. 46 / T. H. 3 MAWNG
. 284 PROJECT NO.
PHONE:- >> aeo —z000 CITY PROJECT NO
DATE cc,. LOCATION
ST3PAUL. N 55110 R OR. 3 -6 -00 ROSEMOLINT, MINNESOTA I
-7s
9
- - o w - �- -e
' U` l —1
- iso ST.
1 -
'3- "
CSAH 42
E1ER LEIGH 119. Qg COQ W O J
H
/
lo
C /R DEC EN 6v 4L DECEMBER CT. ?
mn
�' a
e
/
Y
End
42. DARTMOOR CT. > s
a� > 151st ST. V a a a
Lm c
W > Z - R
h 29 8
°,
'9 L
��•
u < m ru
152nd > 3
j 1¢ J
$ 115N R19V
1 ~
'DE N
Z; 152th ST. VW
P q = ' ST.
9 15 'd ST. m W S
W V. Ls U
s
DR ESd"
/
W r tig c 154th 154th ST. s -c o
G
155tKS I v ST. VT- V. x v 1 55th
y
a WAY
q �NG = PATH > � - IA > CORNELLTR.
80. 152nd CT.
o
N
W
$ 156th 7 T• 156th ST
ST.
UPPERpPI. n� 13 c TR.
'
.A.
P Oi ' ..KNELL
��' , z ` '
' u C7. u u
Q
W
C
I
8 U u PA-,
DARLI C RYST ' 1 C
V
r
Q
G . d
th CT V 157th T L 4 � 'A'N'N CARDI NAL ST. V
A_
�O
W
I5. th CT. 158th ST. V.
159th'' DAKOTA DR. =
O
RTH
NO FRONTAGE RD,
CO
\ \\ \ \\ \\
CO. RD. 46 (160TH ST. W.)
a
A
EMPIRE TOWNSHIP
W
a
PROJECT
LOCATION
z
R20V R19V = t
T114N H
127
W. ® 170th ST. V. V I
+ 5/
T114H R19V
3
N
- -1
500
SCALE 1:25000
SCALE IN METERS
R
Amw FILE SE 001 CO. RD. 46 / T. H. 3 MAWNG
. 284 PROJECT NO.
PHONE:- >> aeo —z000 CITY PROJECT NO
DATE cc,. LOCATION
ST3PAUL. N 55110 R OR. 3 -6 -00 ROSEMOLINT, MINNESOTA I