HomeMy WebLinkAbout6.j. Order Feasibility Report - 2001 Street & Utility Reconstruction, (Dodd Blvd. Phase 2) City Project #326CITY OF ROSEMOUNT
EXECUTIVE SUMMARY FOR ACTION
CITY COUNCIL MEETING DATE: November 21, 2000
AGENDA ITEM: Order Feasibility Report — 2001 Street &
AGENDA SECTION:
Utility Reconstruction Project (Dodd Blvd. Phase 2), City
Consent
Project #326
PREPARED BY: Bret Weiss
AGENIM
Acting City Engineer
ATTACHMENTS: Resolution
APPROVED
r
I
The 2001 Budget includes funding for street and utility improvements for the reconstruction of
Dodd Boulevard between Shannon Parkway and Delft Avenue. The improvements will include
the conversion of the existing rural section roadway to an urban section and any necessary
water and storm drainage improvements. Sanitary sewer improvements were completed this
year due to failing septic systems in the area. It is anticipated that the street improvements will
be an extension of the improvements completed this year on Dodd Boulevard.
The funding for the project will come from assessments, Capital Improvement Plan Funds, Water
and Storm Drain Utility Operating Funds.
Staff will be assigning this project to WSB & Associates, since most of the survey work for this
project has been completed with the sanitary sewer improvements. We are requesting the
initiation of the project now to allow the necessary survey work to be completed prior to heavy
snowfall. We would like to survey a portion of Danville Avenue to possibly include in the project
if funds are available. We have experienced related watermain breaks in this area due to the
shallow watermain depth. If possible, we would like to lower the watermain in this area. The
Feasibility Report will also include 146th Street from Danville Avenue to Danbury Avenue to
address the street improvements that were deleted from the storm sewer project completed in
that area during this past summer.
Staff recommends adopting the attached resolution to direct Staff to begin work on the Dodd
Boulevard Reconstruction project.
RECOMMENDED ACTION: MOTION TO ADOPT A RESOLUTON ORDERING A FEASIBILITY
REPORT FOR THE 2001 STREET & UTILITY RECONSTRUCTION PROJECT, CITY PROJECT
#326
COUNCIL ACTION:
- W,
r'
CITY OF ROSEMOUNT
DAKOTA COUNTY, MINNESOTA
RESOLUTION 2000 -
A RESOLUTION ORDERING A FEASIBILITY REPORT FOR
THE 2001 STREET & UTILITY RECONSTRUCTION PROJECT
CITY PROJECT #326
WHEREAS, the City Council of the City of Rosemount deems it necessary to investigate
the feasibility of the 2001 Street & Utility Reconstruction Project, City Project #326.
NOW THEREFORE BE IT RESOLVED, the Staff is directed to have the necessary feasibility
report prepared for the 2001 Street & Utility Reconstruction Project, City Project #326.
ADOPTED this 21 st day of November, 2000.
Cathy Busho, Mayor
ATTEST:
Linda Jentink, City Clerk
Motion by: Second by:
Voted in favor:
Voted against: