Loading...
HomeMy WebLinkAbout6.j. Order Feasibility Report - 2001 Street & Utility Reconstruction, (Dodd Blvd. Phase 2) City Project #326CITY OF ROSEMOUNT EXECUTIVE SUMMARY FOR ACTION CITY COUNCIL MEETING DATE: November 21, 2000 AGENDA ITEM: Order Feasibility Report — 2001 Street & AGENDA SECTION: Utility Reconstruction Project (Dodd Blvd. Phase 2), City Consent Project #326 PREPARED BY: Bret Weiss AGENIM Acting City Engineer ATTACHMENTS: Resolution APPROVED r I The 2001 Budget includes funding for street and utility improvements for the reconstruction of Dodd Boulevard between Shannon Parkway and Delft Avenue. The improvements will include the conversion of the existing rural section roadway to an urban section and any necessary water and storm drainage improvements. Sanitary sewer improvements were completed this year due to failing septic systems in the area. It is anticipated that the street improvements will be an extension of the improvements completed this year on Dodd Boulevard. The funding for the project will come from assessments, Capital Improvement Plan Funds, Water and Storm Drain Utility Operating Funds. Staff will be assigning this project to WSB & Associates, since most of the survey work for this project has been completed with the sanitary sewer improvements. We are requesting the initiation of the project now to allow the necessary survey work to be completed prior to heavy snowfall. We would like to survey a portion of Danville Avenue to possibly include in the project if funds are available. We have experienced related watermain breaks in this area due to the shallow watermain depth. If possible, we would like to lower the watermain in this area. The Feasibility Report will also include 146th Street from Danville Avenue to Danbury Avenue to address the street improvements that were deleted from the storm sewer project completed in that area during this past summer. Staff recommends adopting the attached resolution to direct Staff to begin work on the Dodd Boulevard Reconstruction project. RECOMMENDED ACTION: MOTION TO ADOPT A RESOLUTON ORDERING A FEASIBILITY REPORT FOR THE 2001 STREET & UTILITY RECONSTRUCTION PROJECT, CITY PROJECT #326 COUNCIL ACTION: - W, r' CITY OF ROSEMOUNT DAKOTA COUNTY, MINNESOTA RESOLUTION 2000 - A RESOLUTION ORDERING A FEASIBILITY REPORT FOR THE 2001 STREET & UTILITY RECONSTRUCTION PROJECT CITY PROJECT #326 WHEREAS, the City Council of the City of Rosemount deems it necessary to investigate the feasibility of the 2001 Street & Utility Reconstruction Project, City Project #326. NOW THEREFORE BE IT RESOLVED, the Staff is directed to have the necessary feasibility report prepared for the 2001 Street & Utility Reconstruction Project, City Project #326. ADOPTED this 21 st day of November, 2000. Cathy Busho, Mayor ATTEST: Linda Jentink, City Clerk Motion by: Second by: Voted in favor: Voted against: