Loading...
HomeMy WebLinkAbout6.g. Order Feasibility Report - Dodd Court Reconstruction, City Project #323CITY OF ROSEMOUNT EXECUTIVE SUMMARY FOR ACTION CITY COUNCIL MEETING DATE: November 21, 2000 AGENDA ITEM: Order Feasibility Report — Dodd Court Reconstruction, City Project #323 AGENDA SECTION: Consent PREPARED BY: Bret Weiss Acting City Engineer AGEN 6 ATTACHMENTS: Resolution [APPROVED BY: The item is on the agenda for Council to consider ordering the preparation of a Feasibility Report for the Dodd Court Reconstruction, City Project #323. This street was initially planned to be overlayed with the 1999 Bituminous Overlay Project. Once the Feasibility Report was prepared, it was determined that Dodd Court was not a candidate for an overlay due to its poor condition. It was determined that Dodd Court would need to be reconstructed and should be a project by itself. The funding for the project will come from assessments and the Capital Improvement Fund. Staff recommends adopting the attached resolution to direct Staff to begin work on the Dodd Court Reconstruction project. This project will require preliminary surveying. RECOMMENDED ACTION: MOTION TO ADOPT A RESOLUTON ORDERING A FEASIBILITY REPORT FOR THE DODD COURT RECONSTRUCTION PROJECT, CITY PROJECT #323 COUNCIL ACTION: CITY OF ROSEMOUNT DAKOTA COUNTY, MINNESOTA RESOLUTION 2000 - A RESOLUTION ORDERING A FEASIBILITY REPORT FOR THE DODD COURT RECONSTRUCTION CITY PROJECT #323 WHEREAS, the City Council of the City of Rosemount deems it necessary to investigate the feasibility of the Dodd Court Reconstruction, City Project #323. NOW THEREFORE BE IT RESOLVED, the Staff is directed to have the necessary feasibility report prepared for the Dodd Court Reconstruction, City Project #323. ADOPTED this 21 st day of November, 2000. Cathy Busho, Mayor Linda Jentink, City Clerk Motion by: Second by: Voted in favor: Voted against: