, CITY OF ROSEMOUNT
EXECUTIVE SUMMARY FOR ACTION
CITY COUNCIL MEETING DATE: September 21, 1999
AGENDA ITEM: Declare Costs for Assessment/Set Public AGENDA SECTION:
Hearing, Stonebridge 3rd Addition Street& Consent
Utility Improvements, City Project#295
PREPARED BY: Bud Osmundson AGENDA NO. o
City Engineer/Public Works Director � � �
ATTACHMENTS: Resolution,Project Cost&Funding APPROVED BY•
Summaries,Drawing
Attached are copies of Project Cost and Funding Summaries for the Stonebridge 3rd Addition Street&
Utility Improvements, City Project#295.
City Project#295 was initiated through a petition from Ron Carlson and Mark Johnson Construction,the
owners of the benefiting properties, on May 5, 1998. The Feasibility Report Project Cost Estimate was
$219,600 and the project was completed in the spring of 1999 for a total cost of$186,775. The total cost
is to be assessed against the Stonebridge 3`�Addition.
Staff is recommending setting a public hearing for October 19, 1999 at 8:00 p.m. to consider these
assessments.
RECOMMENDED ACTION: MOTION TO ADOPT A RESOLUTION DECLARING COSTS TO BE
ASSESSED AND ORDERING PREPARATION OF PROPOSED ASSESSMENT AND CALLING
FOR HEARING ON THE PROPOSED ASSESSMEN,T FOR STONEBRIDGE 3�ADDITION
STREET AND UTILITY IlVIPROVEMENTS, CITY PROJECT#295.
CITY COUNCIL ACTION:
CITY OF ROSEMOUNT
DAKOTA COUNTY, MINNESOTA
RESOLUTION 1999 -
A RESOLUTION DECLARING COST TO BE ASSESSED AND ORDERING
PREPARATION OF PROPOSED ASSESSMENT, AND CALLING
FOR HEARING ON THE PROPOSED ASSESSMENT
STONEBRIDGE 3RD ADDITION STREET AND UTiLITY IMPROVEMENTS
CtTY PROJECT #295
WHEREAS, a contract has been let for the Stonebridge 3rd Addition Street & Utility
Improvements and the contract price for such improvement is $137,944, and the expenses
incurred or to be incurred in the making of such improvement amount to $48,831 so that
the total cost of the improvement will be 5 7 86,775.
NOW, THEREFORE, BE IT RESOLVED by the City Council of Rosemount, Minnesota:
1 . The portion of the cost of such improvement to be paid by the City is hereby declared
to be $0.00 and the portion of the cost to be assessed against benefited property
owners is declared to be $�86,775.
2. Assessments shall be payable in equal annual installments extending over a period of
10 years, the first of the installments to be payable with genera( taxes for the year
1999, and shalf bear interest at the rate of 2% points per annum above the interest
rate paid by the City for its bonds from date of the adoption of the assessment
resolution.
3. The City Clerk, with the assistance of the Public Works Director shall forthwith
calculate the proper amount to be specially assessed for such improvement against
every assessable lot, piece or parcel of land within the district affected, without
regard to cash valuation, as provided by law, and he shall file a copy of such
proposed assessment in his office for public inspection; and
BE IT FURTHER RESOLVED by the City Council of Rosemount, Minnesota:
1 . A hearing shall be held on the 19th day of October, 1999 in the City Hall at 8:00
p.m. or as soon thereafter as possible, to pass upon such proposed assessment and
at such time and place all persons owning property affected by such improvement will
be given an opportunity to be heard with reference to such assessment.
2. The City Clerk is hereby directed to cause a notice of the hearing on the proposed
assessment to be published once in the official newspaper at least two weeks prior
`to the hearing, and she shall state in the notice the total cost of the improvement.
.
Resolution 1999 -
She shall also cause mailed notice to be given to the owner of each parcel described
in the assessment rolF not less than two weeks prior to the hearings.
BE IT FURTHER RESOLVED by the City Council of Rosemount, Minnesota:
The owner of any property so assessed may, at any time prior to certification of the
assessment ta the County Auditor, pay the whole of the assessment on such
property, with interest accrued to the date of payment, to the City, except that no
interest shall be charged if the entire assessment is paid within 30 days from the
adoption of the assessment. The owner may at any time thereafter, pay to the
County Auditor the entire amount of the assessment remaining unpaid, with interest
accrued to December 31 of the year in which such payment is made. Such payment
must be made before November 15 or interest will be charged through December 31
of the succeeding year.
ADOPTED this 21 st day of September, 1999.
Cathy Busho, Mayor
ATTEST:
Susan M. Walsh, City Clerk
Motion by: Seconded by:
Voted in favor:
Voted against:
�
2
f
PROJECT COST SUMMARY
CITY PROJECT#295
STONEBRIDGE 3RD ADDITION
STREET AND STORM SEWER IMPROVEMENTS
ITEM � AMOUNT
CONSTRUCTION COST:
Watermain
Sanitary Sewer
Storm Drain $32,396.00
Street $105,548.00
Subtotal $137,944.00
ENGINEERING:
Design Engineering $8,250.00
Construction Engineering $19,895.00
Soil Borings/Testing $1,736.00
Subtotal $29,881.00
ADMINISTRATION, LEGAL, FINANCE
Administration (5% Construction Cost) $6,897.00
Legal Notices $347.00
Recording Fees $32.00
Capitalized Interest $10,004.00
Bond Issuance Costs $1,670.00
Subtotal $18,950.00
TOTAL PROJECT COST $186,775.00
.
�
PROJECT FUNDING SUMMARY
CITY PROJECT#295
STONEBRIDGE 3RD ADDITION
STREET AND STORM SEWER IMPROVEMENTS
TOTAL PROJECT COST
FUNDING SOURCES AMOUNT
Streets:
Assessments $143,817.00
Subtotal $143,817.00
Storm Drain:
Assessments $42,958.00
Subtotal $42,958.00
Sanitary Sewer:
S u btotai
Watermain;
Subtotal
TOTAL FUNDING $186,775.00
�
� ,
, . FUTURE STREET �� �� �, � ' �'
' �� \ �� �.t~/' _i� .
� i
�� ���OG� �\ \� .�' ,� �
� O �. i
�i �'CpC�O���� �, �� ...,..��"�� `�' �
I P .- �
, .
�' `.�' ' , � --- -, �� ;
�� . ,` �/ rf � I ��
i � 1 � ' � � i�� i�
_I� —�� �� ——S� -L.�— �/�' // ——---�� — � �----—— � -
�. �
I� ` � '% ''� �� �r:'� ��i �
� ,� ,�i � 15 �ST6RM � � �
i i /• , , I� �:. �
� - / � SEV�R i '�
i �''Er� ^� ��/� //� f 9 I+� �°ss �
� (
II �� �� ` � ��i� 5.6 ACRES � j 'o. �
, � .: " , ,� , �i �,,"� 10 ,�
I� SEWER /� �� �" � j � (3.2 ACRES �I
(I �/ � �I� �
Y'�'_ __��_ ---- � �c•-T•� � � �I
r -----��--�,��--__ N�e
,_'_'_`— � � 1 "M'_"�' I
� �
! � 1 p "*�o' � �I
I t� I 1I� f Pot�D �
� I I� � `, 1 1fY��t201 __I .
(3.4 AC S) �� ' L =.- -- — _ —
I � ��' �' '1�-----_�__=___ ��;j���� �I Q
. ,.� �
V 1 � .� �
� �,�;� { �( . (
' y�v` � 1 ; \� 'I'� `.,94e� '�
` I �
(i � � 8 ► ��• i
/ q� '��� � 11�7 BUILOInv SETBACI�" ��� � �
� � -;, �� I
I� �i� ti\, 1 `1� �tNEs (TYPIi.AL ON ALLI I�t �
I� �%�� � � � �� c 3.3 aCRES> � � �
' �=��"� �� � ��Z ; 15" STORM ;�
�.— � ,�m - , ► ,
�i ca.83ACRES) ��'�,�`�� '�� �°� ��� SEWER 7 I) �
I i �...�'"'"`..,.� /'^ � � +� ;�r ` (3.8 AC RE S) I I �I .
:/� i Z
:r � /�.r^--�-� ,��� � � `� � .�� �� �� Ca
io.o I /•f ��/ �`�� `_ �__ � 1 il �"''
I� �� ���' �� �,/ —" — _ II
� J� }�$ �i � �_ --'�—._
/� �► % -- ^-_�- _-�
�
ii ti� �,��'� 28' F-F � �►'—`-- _ '• _--- _---~ �
� � ,i ,I� �� � . ,I
, �
�i ►'� , �C �I
�I ,'j• ,bi,s�F'°. � ; ,;*�`���// ,� \�y ��
� 4
�� � ,/ � ��' '•�;�;' � `� - 6 �
� �� (4.3 ACRE •� i�--�J-- � � (4.4 ACRES) �I
� ;,� �,."�^. � ��(4:2 ACRES) �� � '"�� i
X x�-- � �� , � I
.�.' ;� � / �;��-^,.,..�.�..r..� `4`� �... `t��' 'I
• � o�,o /I . �, �. �W � � I
� w�-P�zeo � �� � :°� � \ �
�r �
FC':D N4L �?0'. / �� � � ` �� +
PC!i'J 4'sL .o���, f( �/ ..+- +-� I I
7 � �/ � , � .
�
��� / � �^ �~ —`l\ \� .�J
�-- �.�--_---�--�— . _---�,--------- I�
o ,00 zao
- ���e� tonebridge 3rd Addition wss�ro�ctHo.tto�.00 �:,iu�2,��ae
aaa�w�e«,�a Street& Storm Sewer Constttiction �'�� �'
�SB h°""°°�°��'�� and Appurtenant Work
��� a��� Figure Number
��� F��+�-+� Street/Storm Sewer Constructioa
a�Fl�.�.srrtuc�rur� -`�o►n�ts - PuwN�s 2
Rosemoun�Minnesota .