HomeMy WebLinkAbout8.b. Receive Feasibility Report/Set Public Hearing for Biscayne Pointe #3 Addition Street & Utility Improvements, City Project #313 .
• CITY OF ROSEMOUNT
EXECUTIVE SUMMARY FOR ACTION
CITY COUNCIL MEETING DATE: December 7, 1999
AGENDA ITEM: Receive Feasibility Report/Set Public AGENDA SECTION:
Hearing-Biscayne Pointe 3�d Addition Street & Utility Old Business
Improvements, City Project #313
PREPARED BY: Bud Osmundson AGENDA NO:
City Engineer/Public Works Director ^� � �-:;
�� i� � �; �
ATTACHMENTS: Resolution, Executive Summary from APPROVED BY•
Feasibility Report and Drawings /
The City received a petition for public improvements from Heritage Development on September
21 , 1999 and a Feasibility Report was ordered for the Biscayne Pointe 3`d Addition. Attached is
a copy of the Executive Summary from the Feasibility Report and a drawing of the proposed
project.
The proposed improvements include all the streets and utilities in extending Birch Street West,
Birchwood Avenue, Belmont Court and Belmont Trail which will create 48 single family lots.
This is the last Addition in the Biscayne Pointe preliminary plat. The project includes a short
extension of the Brockway Draw Trunk Sanitary Sewer on Birch Street and Birchwood Avenue.
With this project it is Staff's recommendation to also extend Biscayne Avenue northerly
approximately 1 ,100 feet to the north property line of this subdivision. The total project cost
will be $1 ,166,000. The improvements in the Biscayne Pointe 3`d Addition total approximately
$701 ,000 and the Biscayne Avenue extension will total approximately $465,000. Most of the
cost will be assessed to the Biscayne Pointe 3�d Addition with approximately $120,000 to be
assessed against the State of Minnesota Military Affairs property on the west side of Biscayne
Avenue. There is approximately 544,000 attributable to the City's Water Core Fund and
approximately 5209,000 will be used from Municipal State Aid for streets. An additional
$49,000 will be utilized from the Sanitary Sewer Core Fund.
Because the project will entail assessing benefiting properties adjacent to the roadway (State of
Minnesota Military Affairs) a public hearing will be required. This is a chance for Council to
review the improvements prior to that public hearing which is scheduled for the next Council
meeting on December 21 , 1999. The project is proposed to be completed by July of 2000.
Staff recommends that the City Council take the action as described below.
RECOMMENDED ACTION: MOTION TO ADOPT A RESOLUTION RECEIVING THE
FEASIBILITY REPORT AND SET PUBLIC HEARING FOR BISCAYNE POINTE 3RD ADDITION
STREET AND UTILITY IMPROVEMENTS, CITY PROJECT #313.
COUNCIL ACTION
13
. CITY OF ROSEMOUNT
• DAKOTA COUNTY, MINNESOTA
RESOLUTION 1999 -
A RESOLUTION RECEIVING THE FEASIBILITY REPORTISET PUBLIC HEARING
BISCAYNE POINTE 3RD ADDITION STREET AND UTILITY IMPROVEMENTS
CITY PROJECT#313
- , WHEREAS,the City Councii deemetl it necessary and expetlient that the City of Rosemount, Minnesota, construct
certain improvements,to-wit: City Project#313, Biscayne Pointe 3rtl Atldition SVeet&Utility Improvements, in the City
as described in and in accordance with the feasibility report prepared by the City Engineer; and
WHEREAS, the City Council has been advised by the City Engineer that said utility and street improvements, City
Project#313 is feasible, and shoultl best be made as proposed, and the City Engineer's report to this effect has
heretofore been received by Council, antl filed with the City Clerk on December 7, 1999; and
WHEREAS,the statute provided that no such improvements shall be made until the Council has held a public hearing
on such improvements following mailed notice and two publications thereof in the official newspaper stating time antl
place of the hearing,the general nature of the improvement,the estimated costs thereof, and the area proposed to be
assessetl, in accordance with the law.
NOW THEREFORE BE IT RESOLVED,the City Council of the City of Rosemount accepts the feasibility report for City
Project#313 and places it on file.
NOW THEREFORE IT BE FURTHER RESOLVED, by the City Council of the City of Rosemount that the public hearing
be scheduled to consider City Project#313, Biscayne Pointe 3rtl Atltlition Street& Utility Improvements to be held on
Tuesday, December 21, 1999 at 8:00 o'clock p.m. or as soon thereafter as possible, in the Council Chambers of the
City Hall.
ADOPTED this 7th day of December, 1999.
Cathy Busho, Mayor
ATTEST:
Susan M. Walsh, City Clerk
Motion by: Seconded by:
Voted in favor:
Voted against:
• •
Decerr�ber 7, 1999
Preliminary Report
_ - Biscayne Pointe - Phase III
' Street and Utility Improvements
City of Rosemount, Minnesota
1.0 Executive Summary
City Project No. 313 provides for the construction of sanitary sewer,
water main, storm drain and street improvements for Phase III of the
Biscayne Pointe development. Phase III of the Biscayne Pointe
development consists of approximately 22 acres, which will be platted
into 48 single-family residential lots.
The project is located in the NW'/a of Section 28, Township 115N,
Range 19W, north of the Union Pacific (U.P.) Railroad and east of
Biscayne Avenue. Phase III of the Biscayne Pointe development is .
located immediately north of Phase I and northwest of Phase II. Phase I
was constructed in 1998 and Phase II was constructed in 1999. Phase III
is the final phase of the Biscayne Pointe development.
The project includes approximately 3,4001inear feet of sanitary sewer, .
- 3,800 linear feet of water main, 2,600 linear feet of storm drain, and
3,8001inear feet of street construction.
The total estimated project cost is $1,166,000. Of this total,
approximately $701,000 is for improvements within the Phase III
development and approximately �a465,000 is for the reconstruction of
Biscayne Avenue along the westerly boundary of the site. � _
Of the $701,000 which is attributable to Biscayne Pointe Phase III,
approximately $49,000 will be recovered through the City's Sanitary
Sewer Core Facility Fund. Spreading the remaining$652,000 over the 48
assessable lots in Phase III yields an approximate assessment rate of
$13,583 per lot. ' -
A-ROS EM0003.00
Page 1
Of the$465,000 which is attributable to Biscayne Avenue,approximately
$44,000 will be recovered through the City's Water Main Core Facility
Fund and approximately $209,000 will be recovered from Minnesota
State Aid Street(MSAS) funds. The remaining $212,000 is assessable to
the benefitting properties in the Biscayne Pointe development.
. This improvement is necessary to provide the subject property with
municipal utilities and street access. In addition, the improvement is cost-
� � effective and feasible from an engineering standpoint. Due to the size of
the project and the nature of the construction, this project would best be
bid and constructed as an individual project rather than combining the
project with other work.
Project construction is scheduled to begin in April of 2000, with final
completion (bituminous wear course) scheduled for June of 2000.
Biscayne Pointe- Phase III, Street and Utility Improvements A-ROSEM0003.00
City of Rosemount, Minnesota Page 2
- .
O � .
� -
Q�
e an
� n Lake �
�
�u>
= - � Q PROJECT
� LOCATION
BISCAYNE P01 III
' ' CITY N0.
ROSEMOUNT ;
^� Y���F � \�RpP�
� K�r�,. =�,.� P
� Y.ci�'uC �'__��i ..��Jif � �. �� '
� � - d � � � PG\F�G
Q _ " `� �5' P
� � �._..: ������p �N\oN P�
Q' �:"�'���,i Q
�J �T,�T 7F Lti. —V\�v��,'/ ��oo/Y/�1E�D .
Y-'.:�TA.RY�..�. �/''J .
145TH ST. W. CSAH 42
w
>
� Q
= W
�
N U
N
m
CSAH 42
w
>
> Q -
Q w - �r .
Z
w �- .
J Q
Q . U
. N
Z �] Q :
U �
-1000 0 1000 �
�— ' '
500
SCALE IN FEET
� O AROSEM o03.0o B�SCAYNE POINTE - PHASE �I 1 :
i�,� PROJECT
PHONE: (651) 590-2000 CITY PROJECT NO. 313 ;
3535 VAONAIS CENTER DR. DA�' ROSEMOUNT,MWNESOTA LOCATION � '
x S7. PAUL, MN 55110 12/07/99
t
' � i ���1�� �.- _,., ;; �� Q
o ,s f fr � ,,,`;' ,. �!. �'.,
�Q �,,,ff f; �` �f�� .%;;' - i� O
o � � f; ' ' 'v �� `��j`:.
o� f �' �; /'` �,. �'
0 0 �1'�' I, �;, �':, Q-�`
E c-;� ��� � . ���::
�fA N Q � `�'�` Q �` �,`%, �-- � //, �'�i'• .
�p d�'w � co i � j� .'f �y'��� �:" � �;
J Z U �C� � ���Q�n.` �/' � �;, � �
J Q ------�__ Q'f!1� �` '•
��� z �t_"-- Q I � �`�//, %\�'��. .i, O
�� , W�,� , � � �� O
zwa � ��� : �G; `:, � N
�m �o� I .� ,.,.-` �
F- ��--��----__ \�� `�\' " ' I—
- �w—�-k-`'-o �� �.'� '-�'�' '�i�� -' .
' �.
, , N �-� w
� �,
� �� . , � � t°.. �., W
i m � ,�"�j, LL
--- �� `i t�� /l.
. w � i Q ;,f ~ i' ,,LL��, ' O z
_'_ �� � ��� t l�
` � '.,��_____;. '•� �i �� � �� �
BIR�HWOOD F ti - w
;m o r- ;tb J?. � �
AVE. UE N �_ � Q ' Z �_` %'. '°;` `,� �.. o Q
U ' _ 1'�: tl� U
z —....- �-- - _0c--..___.__ ;_ �� � p
p � �� 3 G ° i,'�� � „�=� �— �
>-F Im � t , J `..r .`t \• '�
Q�Z �! � � W�l+L V � ' m _'"J '` � �(S� �
��W _.�.�— � >p� -----: . Z � �
O H g ='��l�d I 0-' �/'� `,i
g�w z � 'd"� ww�Q � `�� \\�'�� N
z cn � �1- : �
. m � ,�
��w � � �`� � '1, ``,�. � ;' ',1 \�
w Z' .-''i `` �� ;`. N Z`` /�- ,� �,;:
\
�
w U J c+�i � .�/~ p � �,����' �;`i i`�� Z
w`,;.
Z �� ��� �� \�� � �w�,' ��'�J� ' \% J J O
Q
_ ---___._ � r� \�(n����\ �\ �. I U' 3 � U
Q � �� -�;'U' ���\ �\ l :.-'% 5 W F- o
p Y � \ Q � 'qj '"� .•�� Q W N Z
NO qj �i / � \ `� /��� „�^;1 d U � U'
O>- � �C � � �CO `�� . F Z Z (n
N� � �`�'' / `� � M (l�U ` ,�. ' � O = �
O� at �@ ,:% • F- ~ ~
M� // i `° � 1 � N Il') m fn
---_'--F-_I '� � i � �, �' r' W W W W
� �i `� _ -�` � ;� ; O O O O
�
�� �� °' ' ` 1' � O O O O
� t �° � i � � � "'1•''��� � �' � �
Z � }------- �_.-.-__._!, � �., � a � n.
� � �' ~ ' t ,�.�-� ' _---` _'O
z v `�
�a ,; • _--_--�; " 3`: � � �� ..�.��-.
��, � �._ J� I_ � i �_.�...- Z
�^'„�.^.� �,/
Q o o m �yJ f ;-- �..f`—:_' ' Q � � T
� I� _`�� i '� ; � � W v � :. j IaJ.
O� N i � _ �lal....�---J ..
!�-:�
�� � .� �---�_-_ �,;t.- m
� � �
— , � �
�{ — � -. � w �' � o �� _.---
. " ' I- i� Z J��t�/
' __ C �� � ��
`, I G ,
� � \ � • � � � � i�.\(
F / �� \ t c� i ` J �� \
� , \ � _ -� m� \\
i
�� j�� � � � �� \\
� � � rm � \
� � � � � � .
s : � � � � .
� . �,
m ___ ____
^ ___ __ _ ____ ___
g ____ _________ ____
_____ ___ _ �
_ _
� _ _
_
� . _ __ __ _ ___
� _ _ _ _
_ _
iC � ��� _ _ __..__."___ ...
�-� � 340201006160 340370003000 BISCAYNE AVENUE �
� SAM HERTOGS '. STATE OF MN DEPT .
� ; OF MILITARY AFFAIRS ;
5 � I
C
%
� � O F��E No. gISCAYNE POINTE - PHASE 01 6
�� a ��� AROSEM0003.00 PROPOSED
d PHONE: (657) 490-2000 pA�: CITY PROJECT NO. 313
3535 VADNAIS CENTER DR. ROSEMOUNT,MINNESOTA STREETS �
ST. PAUL. MN 55110 �2�07I99