HomeMy WebLinkAbout6.m. Payment #3 - Shannon Pond South Addition Street & Utility Improvements, City Project #288 CITY OF ROSEMOUNT
EXECUTIVE SUMMARY FOR ACTION
CITY COUNCIL MEETING DATE: August 3, 1999
AGENDA ITEM: Payment #3 - Shannon Pond South AGENDA SECTION:
Addition Street & Utility Improvements, City Project #288 Consent
PREPARED BY: Bud Osmundson AGEND��� � � �
City Engineer/Public Works Director
ATTACHMENTS: Payment Voucher #3 APPROVED BY:
i
This item requests the third payment to Erickson Construction, Inc., in the amount of
565,704.54 for City Project #288, the Shannon Pond South Addition Street and Utility
Improvements.
Work completed and represented in this amount as of July 15, 1999 is 90% of
contracted work. This work has been inspected and is in compliance with Contract
Documents.
Almost all of this payment is for paving of the first lift of bituminous and the construction
of curb and gutter. The final lift of paving was installed on August 23rd and will be paid
for in the next payment.
Attached is a copy of the Construction Pay Voucher #3 for your information. Staff and
WSB & Associates recommend approval of this third payment.
RECOMMENDED ACTION: MOTION TO APPROVE PAYMENT #3 TO ERICKSON
CONSTRUCTION, INC., IN THE AMOUNT OF $65,704.54 FOR SHANNON POND SOUTH
ADDITION STREET AND UTILITY IMPROVEMENTS, CITY PROJECT #288.
COUNCIL ACTION:
5
- B.A.Miccelstead�,P.E.
350 Westwood Lake Office Bret A.Weiss,P.E.
II���� 8441 Wayzata Boulevard Peter R.Willenbring,P.E.
Minneapolis, MN 55426 Donald W.Scerna,P.E.
Ronald B.Bray,P.E.
612-541-4800
�Associates,Inc. FAX 541-1700
July 22, 1999
Honorable Mayor and City Council
City of Rosemount
2875 145`� Street West
Rosemount, MN 55068
Re: Construction Pay Voucher No. 3 .
Shannon Pond South
City Project No. 288 �
WSB Project No. 1147.01
Dear Mayor and Council Members:
Please find enclosed Construction Pay Voucher No. 3 for the above-referenced project in
the amount of$65,704.54. Would you please process payment in this amount to Erickson
Construction, Inc. at your earliest convenience. Thank you.
Sincerely,
WSB &Associates,Inc.
Bret A. Weiss, P.E.
Vice President
Enclosures
c: Bud Osmundson/Doug Litterer, City of Rosemount
Erickson Construction, Inc.
nm
F:IWpWJM/I�7.0/'.vo-3-!tr.wpd
Infrastructure Engineers Planners
EQUAL OPPORNNITY EMPLOYER
, � � - a �, , .
� �� � ��� Constructior��Pa ��V,o,cicher � � � �
��.r. ,� ..�_ _.��..� ,.� ,y ��' ° .���
Voucher No. 3 Date: July 19, 1999
WSB Project No: 1147.01 Period Ending: July 15, 1999
Project: Shannon Pond South
Project Location: � City of Rosemount Project No.288
Contractor: Erickson Construction, Inc.
13616 Pleasant Lane
Burnsville, MN 55337
Contract Date: October 28, 1998 Work Started:
Completion Date: Work Completed:
Original Contract Amount $414,139.15
Total Additions
Total Deductions
Total Funds Encumbered $414,139.15
Totai Work Certified to Date $370,744.59
Less Retained Percentage . 5.00% $18,537.23
Less Previous Payments $286,502.82
Total Payments Incl. This Voucher $352,207.36
Balance Carried Forward $61,931.78
Approved for Payment This Voucher 65 704.54
Approvals
WSB 8�Associates, Inc.
In accordance with field observation, as performed in accordance with industry standards, and based on our professional
opinion, the materials installed are satisfactory and the work properly performed in accordance with the plans and
specifications.
The total work estimated to be completed as of July 15, 1999 is as indicated herein and we hereby recommend so% I
payment of this voucher.
Signed: Signed:
Construction Observer Project Manager/Engineer
Erickson Construction, Inc.
This is to certify that to the best of my knowledge, information, and belief, the quantities and values of work certified
herein is a fair approximate estimate for the period covered by this voucher.
Contractor: Signed:
Date: Title:
City of Rosemount
Checked by: Approved for Payment:
Authorized Representative
�ate: �ate: `7- Z q--�9