HomeMy WebLinkAbout6.l. Payment #3 - Wensmann 12th Addition Street & Utility Improvements, City Project #287 CITY OF ROSEMOUNT
EXECUTIVE SUMMARY FOR ACTION
CITY COUNCIL MEETING DATE: August 3, 1999
AGENDA ITEM: Payment #3 - Wensmann 12th Addition AGENDA SECTION:
Street & Utility Improvements, City Project #287 Consent
PREPARED BY: Bud Osmundson AGEND�� �� ' �
City Engineer/Public Works Director
ATTACHMENTS: Payment Voucher #3 APPROVED BY:
This item requests the third payment to Ryan Contracting, Inc., in the amount of
59,179.85 for City Project #287, the Wensmann 12th Addition Street & Utility
Improvements.
Work completed and represented in this amount as of May 31 , 1999 is 90% of
contracted work. The payment is for signage and sodding. This work has been inspected
and is in compliance with Contract Documents.
Attached is a copy of the Construction Pay Voucher #3 for your information. Staff and
WSB & Associates recommend approval of this third payment.
RECOMMENDED ACTION: MOTION TO APPROVE PAYMENT #3 TO RYAN CONTRACTING,
INC., IN THE AMOUNT OF 59,179.85.
COUNCIL ACTION:
4
- B.A.Miccelsceadc,P.E.
350 Westwood Lake Office Bret A.Weiss,P.E.
II���� 8441 Wayzata Boulevard Peter R.Willenbring,P.E.
Minneapolis, MN 55426 Donald W.Sterna,P.E.
Ronald B.Bray,P.E.
612-541-4800
F��Issociates,Inc. FAX 541-1700
July 20, 1999
Honorable Mayor and City Council
City of Rosemount
2875 145�' Street West
Rosemount, MN 55068
Re: Construction Pay Voucher No:3
Wensmann 12�' Addition Street & Utility Construction
City Project No. 287
WSB Project No. 1067.51
Dear Mayor and Council Members:
Please find enclosed Construction Pay Voucher No. 3 in the amount of$9,179.85 for the
above-referenced project. Would you please process payment and forward to Ryan
Contracting Co. at your earliest convenience. Thank you.
Sincerely,
WSB &Associates, Inc.
/� �,2.Eso
��
Bret A. Weiss, P.E.
Vice President
Enclosures
c: Bud Osmundson/Doug Litterer, City of Rosemount
Ryan Contracting Co.
nm
F:IWPWIM I067.51�w3-lrr.wpd
Infrastructure Engineers Planners
EQUAL OPPORNNITY EMPLOYER
�� � ��� � , � �:
.W ��,"����Co,nstruct�on:Pay�Ilocicher `
Voucher No. 3 Date: July 15, 1999
WSB Project No: 1067.51 Period Ending: July 15, 1999
Project: Wensmann 12th Addition Street 8�Utility Construction
Project Location: � City of Rosemount Project No.287
Contractor: Ryan Contracting Ca
8700 13th Ave East
Shakopee, MN 55379
Contract Date: July 30, 1999 Work Started:
Completion Date: Work Completed:
Original Contract Amount $379,349.67
Total Additions $3,960.00
Total Deductions $0.00
Total Funds Encumbered $383,309.67
Totat Work Certified to Date $345,302.83
Less Retained Percentage . 5.00% $17,265.14
Less Previous Payments $318,857.84
Total Payments Incl. This Voucher $328,037.69
Balance Carried Forward $55,271.98
Approved for Payment This Voucher 9 179.85
Approvals
WSB�Associates, Inc.
In accordance with field observation, as performed in accordance with industry standards, and based on our professional
opinion, the materials installed are satisfactory and the work properly performed in accordance with the plans and
specifications.
The total work estimated to be completed as of July 15, 1999 is as indicated herein and we hereby recommend �'�
payment of this voucher. 9�
Signed: Signed:
Construction Observer Project Manager/Engineer
Ryan Contracting Co.
This is to certify that to the best of my knowledge, information, and belief, the quantities and values of work certified
herein is a fair approximate estimate for the period covered by this voucher.
Contractor: Signed:
Date: Title:
City of Rosemount
Checked by: Approved for Payment: �
Authorized Representative
Date: Date: ��'Z�—Q�