HomeMy WebLinkAbout6.k. Payment #5 - Wensmann 11th Addition Street & Utility Improvements, City Project #298 CITY OF ROSEMOUNT EXECUTIVE SUMMARY FOR ACTION CITY COUNCIL MEETING DATE: August 3, 1999 AGENDA ITEM: Payment #5 - Wensmann 1 1 th Addition AGENDA SECTION: Street & Utility Improvements, City Project #298 Consent PREPARED BY: Bud Osmundson AGENDA11'�� � � �� City Engineer/Public Works Director �� L ATTACHMENTS: Payment Voucher #5 APPROVED BY: This item requests the fifth payment to Ryan Contracting, Inc., in the amount of $9,137.81 for City Project #298, the Wensmann 1 1 th Addition Street and Utility Improvements. Work completed and represented in this amount as of July 15, 1999 is 89% of contracted work. The payment is for signage and sodding. This work has been inspected and is in compliance with Contract Documents. Attached is a copy of the Construction Pay Voucher #5 for your information. Staff and WSB & Associates recommend approval of this fifth payment. RECOMMENDED ACTION: MOTION TO APPROVE PAYMENT #5 TO RYAN CONTRACTING, INC., IN THE AMOUNT OF $9,137.81 . COUNCIL ACTION: 3 - B.A.Mittelsteadt,P.E. 350 Westwood Lake Office Bret A.Weiss,P.E. II���� 8441 Wayzata Boulevard Peter R.Willenbring,P.E. Minneapolis, MN 55426 Donald W.Scerna,P.E. Ronald B.Bray,P.E. 612-541-4800 �Assoriates,Inc. FAX 541-1700 July 20, 1999 Honorable Mayor and City Council City of Rosemount 2875 145`'' Street West Rosemount, MN 55068-4997 Re: Construction Pay Voucher No. 5 Wensmann 11�' Addition Street & Utility Construction City of Rosemount Project No. 298 WSB Project No. 1067.31 Dear Mayor and Council Members: Please find enclosed Construction Pay Voucher No. 5 for the above-referenced project in the amount of$9,137.81. Please process payment for this amount and forward to Ryan Contracting Co.at your earliest convenience. Thank you. Sincerely, WSB & Associates, Inc. f���%L1 � Gv.Gc.-s� /�'Yl Bret A. Weiss, P.E. Vice President Enclosures c: Bud Osmundson, City of Rosemount Ryan Contracting Co. nm F.•1 WPWIM!06 7.3/1 w-S-ltr.wpd Infrastructure Engineers Planners EQUAL OPPORTUNITY EMPLOYER CONSTRUCTION PAY VOUCHER ESTIMATE VOUCHER NUMBER: 5 DATE July 20,1999 WSB PROJECT NUMBER: 1067.31 PERIOD ENDING: July 15,1999 PROJECT: WENSMANN 11Th'ADDITION STREET&UTILITY CONSTRUCTION . CITY PROJECT NO.298 ROSEMOUNT,MN CONTRACTOR: RYAN CONTRACTING CO. 8700 13TH AVE EAST SHAKOPEE MN 55379 CONTRACT DA7E: September 16, 1998 WORK STARTED: COMPLETION DATE: WORK COMPLETED: ORIGINAL CONTRACT AMOUNT $644,811.46 TOTAL ADDITIONS $32,032.68 TOTAL DEDUCTIONS ($28,003.52) TOTAL FUNDS ENCUMBERED $648,840.62 TOTAL WORK CERTIFIED TO DATE . $574,751.33 LESS RETAINED PERCENTAGE 5.00% $28,737.57 LESS PREVIOUS PAYMENTS $536,875.95 TOTAL PAYMENTS INCL.THIS VOUCHER $546,013.76 BALANCE CARRIED FORWARD $102,826.86 APPROVED FOR PAYMENT THIS VOUCHER 9 137.81 APPROVALS WSB 8�ASSOCIATES,INC. In accordance with field observation,as performed in accordance with industry standards,and based on our professional opinion,the materials installed are satisfactory and the work properly performed in accordance with the plans and specifications. The total work is estimated to be 89°/a completed as of July 15,1999. We hereby recommend payment of this voucher. Signed: Signed: Construction Observer Project ManagedEngineer RYAN CONTRACIING CO. This is to certify that to the best of my knowledge,informa6on,and belief,the quantities and values of work certified herein is a fair approximate estimate for the period covered by this voucher. Contractor. Signed: Date: Title: CITY OF ROSEMOUNT Checked by: Approved for payment: . Authorized Representativ Date: Date: 7�Z l ✓ ` 1 F:\W P WII�1067.31\vo-5.wpd